1、Lessons Learned Entry: 2476Lessons Learned Entry: 2476Lesson Info:a71 Lesson Number: 2476a71 Lesson Date: 2010-03-23a71 Submitting Organization: JPLa71 Submitted by: David Oberhettingera71 POC Name: Joy Bottenfield; P.J. Guskea71 POC Email: Joy.A.Bottenfieldjpl.nasa.gov; Patrick.J.Guskejpl.nasa.gova
2、71 POC Phone: 818-393-1144 (Bottenfield); 818-354-4950 (Guske)Subject: Place Flight Scripts Under Configuration Management Prior to ORT Abstract: When flight scripts developed independently by project personnel are not placed under configuration control early enough in flight software development, m
3、ultiple versions of the scripts tend to proliferate and cause confusion and delays. The MER, Juno, and GRAIL projects demonstrated the utility of placing flight scripts under change control prior to ORT.Description of Driving Event: Flight scripts are modules of software code used to automate many f
4、light software development and test processes that were previously done manually and repetitively. Because flight scripts are considered to be “development support“ software (Class D), they are not placed under configuration management (CM) control as early as mission software classified as Class C
5、(Mission Support) or Class B (Mission-Critical). This timing may be appropriate because instituting Mission System Change Control Board (MCCB) control of the scripts too early may impede the flight system development process, but very late initiation of formal control may result in excessive softwar
6、e iterations and may compromise test-as-you-fly fidelity or test procedure accuracy. The solution proven on several recent spaceflight projects is to institute change management of flight scripts prior to Operational Readiness Test (ORT). The Orbiting Carbon Observatory (OCO) project found that the
7、process of flight script development continued for too long (Reference (1). Given the multiple script authors and the potential impact of changes, the Flight Operations Team should have been in control of the scripts prior to the start of mission rehearsals (i.e., ORT). Provided by IHSNot for Resale
8、No reproduction or networking permitted without license from IHS-,-,-Lessons Learned Entry: 2476The Mars Exploration Rover (MER) project should have placed more emphasis on management of the variety and the versions of flight scripts. Developers became accustomed to preparing scripts on their own co
9、mputer, exchanging them with others, and independently making changes. Hence, the scripts that were run out of home directories were not always sourced in a dependable way to MER workstations. With different versions of scripts found on different workstations- some of which would not work properly-
10、processes were not repeatable between workstations. Reference (2) may be a typical example. Because this caused operational issues for MER during Assembly, Test, and Launch Operations (ATLO, aka “Integration & Test“), a procedure was successfully implemented during ORTs in which these scripts were d
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS24762010LESSONSLEARNEDPLACEFLIGHTSCRIPTSUNDERCONFIGURATIONMANAGEMENTPRIORTOORTPDF

链接地址:http://www.mydoc123.com/p-1019376.html