1、Lessons Learned Entry: 1717Lesson Info:a71 Lesson Number: 1717a71 Lesson Date: 2006-03-14a71 Submitting Organization: JSCa71 Submitted by: Ron Montaguea71 POC Name: SheliaPowella71 POC Email: shelia.k.powellnasa.gova71 POC Phone: 281-483-3142Subject: Process Control of Floor Level Procedures Abstrac
2、t: Floor level procedures need to be unequivocal when steps are to be performed in sequence and as specified in procedural documentation.Description of Driving Event: An electrician suffered burns from an electrical arc/blast when a pre-existing condition in a power distribution panel ultimately led
3、 to a ground fault in a 3-phase 480-volt power supply. The pre-existing condition was believed to be an access panel fastener that had penetrated conductor insulation. Failure to perform work practices in accordance with established procedures ultimately resulted in procedural errors. 1. Personnel b
4、egan work prior to scheduled outage with power sources energized. The very first step in the procedure is to implement the outage, but later steps were clearly performed in advance. While the later steps were not in themselves hazardous, the regular practice of performing steps out of order without
5、prior authorization ultimately leads to a breakdown in process control. Management who reviewed and approved the procedure expected the procedure to be followed stepwise but in actuality the steps were re-ordered by employees and their supervisors who believed they had the discretion to reorder the
6、procedure during implementation. This practice largely negates the checks and balances in place during the development of procedures required to ensure that implementation met management expectations. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2
7、. Procedures and reference materials were available but not in possession of the electricians at the worksite. The procedure that governed the task itself was in the possession of supervisors who came and went from the worksite during the course of the shift. Only one of the supervisors had the pane
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS17172006LESSONSLEARNEDPROCESSCONTROLOFFLOORLEVELPROCEDURESPDF

链接地址:http://www.mydoc123.com/p-1019259.html