欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1717-2006 Lessons Learned Process Control of Floor Level Procedures.pdf

    • 资源ID:1019259       资源大小:15.21KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1717-2006 Lessons Learned Process Control of Floor Level Procedures.pdf

    1、Lessons Learned Entry: 1717Lesson Info:a71 Lesson Number: 1717a71 Lesson Date: 2006-03-14a71 Submitting Organization: JSCa71 Submitted by: Ron Montaguea71 POC Name: SheliaPowella71 POC Email: shelia.k.powellnasa.gova71 POC Phone: 281-483-3142Subject: Process Control of Floor Level Procedures Abstrac

    2、t: Floor level procedures need to be unequivocal when steps are to be performed in sequence and as specified in procedural documentation.Description of Driving Event: An electrician suffered burns from an electrical arc/blast when a pre-existing condition in a power distribution panel ultimately led

    3、 to a ground fault in a 3-phase 480-volt power supply. The pre-existing condition was believed to be an access panel fastener that had penetrated conductor insulation. Failure to perform work practices in accordance with established procedures ultimately resulted in procedural errors. 1. Personnel b

    4、egan work prior to scheduled outage with power sources energized. The very first step in the procedure is to implement the outage, but later steps were clearly performed in advance. While the later steps were not in themselves hazardous, the regular practice of performing steps out of order without

    5、prior authorization ultimately leads to a breakdown in process control. Management who reviewed and approved the procedure expected the procedure to be followed stepwise but in actuality the steps were re-ordered by employees and their supervisors who believed they had the discretion to reorder the

    6、procedure during implementation. This practice largely negates the checks and balances in place during the development of procedures required to ensure that implementation met management expectations. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2

    7、. Procedures and reference materials were available but not in possession of the electricians at the worksite. The procedure that governed the task itself was in the possession of supervisors who came and went from the worksite during the course of the shift. Only one of the supervisors had the pane

    8、l schedule, a line drawing and a one line diagram. 3. A complicating factor was the distribution of multiple copies of the procedure to accomplish the work. There was no reconciliation of entries by personnel who were remotedly locate and in communication by phone. Times and dates occasionally did n

    9、ot match or were entered in error. No single master or official copy was in the control of the supervisor; it was in the custody of another craft supervisor. Lesson(s) Learned: Floor level procedures must be developed and implemented in accordance with sound process control practiceRecommendation(s)

    10、: 1. Implement refresher training for employees to recognize risks associated with deviating from established processes. 2. Evaluate written policies for applicability, clarity and effectiveness. Institute program to review procedures on a routine basis with assigned field crafts. 3. Follow procedur

    11、es in sequence as written. Assure that as tasks are revised in the field that those revisions become lessons learned and incorporated in future procedures. 4. Implement refresher training for employees to recognize risks associated with beginning procedural tasks prior to a scheduled outage. 5. Clar

    12、ify electrical hot work policy to include removal of fasteners from energized panels as electrical hot work. 6. Provide field crafts with copies of procedures and pertinent reference materials at the worksite. Ensure one control copy of the procedure has all steps and data entries verified and time

    13、stamped as work is completed. Clearly identify working copies vs. control copy on all documents. Consider identifying all expected attachments to procedures by number, title, version and/or date.Evidence of Recurrence Control Effectiveness: Controlling processes for developing procedures have been r

    14、evised to address all recommendations. Training has been implemented and spot checks via inspections have been implemented.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Documents Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phras

    15、e(s): a71 Program Management.Communications between different offices and contractor personnela71 Manufacturing and Assemblya71 Additional Categories.a71 Additional Categories.Configuration Managementa71 Additional Categories.Energya71 Additional Categories.Facilitiesa71 Additional Categories.Industrial Operationsa71 Additional Categories.Policy & PlanningAdditional Info: a71 Project: N/AApproval Info: a71 Approval Date: 2006-06-30a71 Approval Name: tmasona71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1717-2006 Lessons Learned Process Control of Floor Level Procedures.pdf)为本站会员(brainfellow396)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开