1、Lessons Learned Entry: 1575Lesson Info:a71 Lesson Number: 1575a71 Lesson Date: 2005-10-04a71 Submitting Organization: ARCa71 Authored by: Donald R. MendozaSubject: Mission Assurance: Oversight/Insight of Contractor Quality Assurance (QA) Abstract: Projects with numerous and widely distributed contra
2、ctors must tailor its QA resources towards each contractors strengths and weaknesses. Since the Projects resources are limited, a combination of insight and oversight processes must be used to efficiently and effectively ensure quality. Description of Driving Event: The Project, which was aimed at d
3、eveloping space flight hardware for biological research, included many contractors and other institutions distributed around the world. Therefore, the Project frequently shifted from an oversight to an insight role such that its limited mission assurance resources were used efficiently and effective
4、ly. The decision to stress oversight or insight involved several factors including travel, telecommunications, national culture, and the vendors in-house QA processes and track record. However, the main factor was the influence an activity (design, fabrication, test) had on the Projects overall succ
5、ess criteria. Those activities deemed high risk received increasing oversight while those deemed low risk received increasing insight. Lesson(s) Learned: Every contractor needs a different degree of oversight versus insight. Sometimes, the only way to determine the needed level of oversight is empir
6、ically, by the frequency and severity of QA issues that arise with a contractor. In-plant inspections can be misleading; sometimes contractors put on a special show for Project visits. A contractors QA system, even as measured by a standard like ISO, cannot be trusted except through actual experienc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS15752005LESSONSLEARNEDMISSIONASSURANCEOVERSIGHTINSIGHTOFCONTRACTORQUALITYASSURANCEQAPDF

链接地址:http://www.mydoc123.com/p-1019198.html