REG NASA-LLIS-1552--2005 Lessons Learned Lack of Project-level Reserves.pdf
《REG NASA-LLIS-1552--2005 Lessons Learned Lack of Project-level Reserves.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1552--2005 Lessons Learned Lack of Project-level Reserves.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1552Lesson Info:a71 Lesson Number: 1552a71 Lesson Date: 2005-01-01a71 Submitting Organization: ARCa71 Submitted by: Donald R. Mendozaa71 Authored by: Ronald C WinterlinSubject: Lack of Project-level Reserves Abstract: The AATT Project was directed, at the Non-Advocate Review (
2、NAR), to not maintain a reserve, which significantly hampered the projects ability to mitigate risk and address unforeseen situations. Most schools of thought recognize the importance of any project manager maintaining a reasonable reserve for purposes of risk management and mitigation. Having no ot
3、her option but to re/de-scope in some fashion obviously has negative effects on the project and its ability to deliver completely and on time. Description of Driving Event: During the AATT Project the requirement to re-plan or de-scope the project was necessary to support shifts in customer and stak
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS15522005LESSONSLEARNEDLACKOFPROJECTLEVELRESERVESPDF

链接地址:http://www.mydoc123.com/p-1019175.html