REG NASA-LLIS-1346-2003 Lessons Learned ADEOS-II NASA Ground Network (NGN) Development and Early Operations -- Central Standard Autonomous File Server (CSAFS SAFS) Lessons Learned.pdf
《REG NASA-LLIS-1346-2003 Lessons Learned ADEOS-II NASA Ground Network (NGN) Development and Early Operations -- Central Standard Autonomous File Server (CSAFS SAFS) Lessons Learned.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1346-2003 Lessons Learned ADEOS-II NASA Ground Network (NGN) Development and Early Operations -- Central Standard Autonomous File Server (CSAFS SAFS) Lessons Learned.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1346Lesson Info:a71 Lesson Number: 1346a71 Lesson Date: 2003-07-15a71 Submitting Organization: GSFCa71 Submitted by: Mathew SchwallerSubject: ADEOS-II NASA Ground Network (NGN) Development and Early Operations - Central/Standard Autonomous File Server (CSAFS/SAFS) Lessons Lear
2、ned Description of Driving Event: The purpose of the Standard Autonomous File Server (SAFS) is to provide automated management of large data files without interfering with the assets involved in the acquisition of the data. It operates as a stand-alone solution, monitoring itself, and providing an a
3、utomated level of fail-over processing to enhance reliability. The successful integration of COTS products into the SAFS system has been key to its becoming accepted as a NASA standard resource for file distribution, and leading to its nomination for NASAs Software of the Year Award in 1999.Lesson(s
4、) Learned: 1. Match COTS tools to project requirements. Deciding to use a COTS product as the basis of system software design is potentially risky, but the potential benefits include quicker delivery, less cost, and more reliability in the final product. The following lessons were learned in the def
5、inition phase of the SAFS/CSAFS development.a71 Use COTS products and re-use previously developed internal products.a71 Create a prioritized list of desired COTS features.a71 Talk with local experts having experience in similar areas.a71 Conduct frequent peer and design reviews.a71 Obtain demonstrat
6、ion versions of COTS products.a71 Obtain customer references from vendors.a71 Select a product appropriately sized for your application.a71 Choose a product closely aligned with your projects requirements.a71 Select a vendor whose size will permit a working relationship.a71 Use vendor tutorials, doc
7、umentation, and vendor contacts during COTS evaluation period.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2. Test and prototype COTS products in the lab. The prototyping and test phase of the COTS evaluation allows problems to be identified as th
8、e system design to matures. These problems can be mitigated (often with the help and cooperation of the COTS vendor) well before the field-testing phase at which time it may be too costly or impossible to retrofit a solution. The following lessons were learned in the prototyping and test phase of th
9、e SAFS/CSAFS development.a71 Prototype your systems hardware and software in a lab setting as similar to the field environment as possible; simulate how the product will work on various customer platforms; model the field operations; develop in stages with ongoing integration and testinga71 Pass per
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS13462003LESSONSLEARNEDADEOSIINASAGROUNDNETWORKNGNDEVELOPMENTANDEARLYOPERATIONSCENTRALSTANDARDAUTONOMOUSFILESERVERCSAFSSAFSLESSONSLEARNEDPDF

链接地址:http://www.mydoc123.com/p-1018985.html