    REG NASA-LLIS-1346-2003 Lessons Learned ADEOS-II NASA Ground Network (NGN) Development and Early Operations -- Central Standard Autonomous File Server (CSAFS SAFS) Lessons Learned.pdf

    • 资源ID:1018985       资源大小:15.77KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1346-2003 Lessons Learned ADEOS-II NASA Ground Network (NGN) Development and Early Operations -- Central Standard Autonomous File Server (CSAFS SAFS) Lessons Learned.pdf

    1、Lessons Learned Entry: 1346Lesson Info:a71 Lesson Number: 1346a71 Lesson Date: 2003-07-15a71 Submitting Organization: GSFCa71 Submitted by: Mathew SchwallerSubject: ADEOS-II NASA Ground Network (NGN) Development and Early Operations - Central/Standard Autonomous File Server (CSAFS/SAFS) Lessons Lear

    2、ned Description of Driving Event: The purpose of the Standard Autonomous File Server (SAFS) is to provide automated management of large data files without interfering with the assets involved in the acquisition of the data. It operates as a stand-alone solution, monitoring itself, and providing an a

    3、utomated level of fail-over processing to enhance reliability. The successful integration of COTS products into the SAFS system has been key to its becoming accepted as a NASA standard resource for file distribution, and leading to its nomination for NASAs Software of the Year Award in 1999.Lesson(s

    4、) Learned: 1. Match COTS tools to project requirements. Deciding to use a COTS product as the basis of system software design is potentially risky, but the potential benefits include quicker delivery, less cost, and more reliability in the final product. The following lessons were learned in the def

    5、inition phase of the SAFS/CSAFS development.a71 Use COTS products and re-use previously developed internal products.a71 Create a prioritized list of desired COTS features.a71 Talk with local experts having experience in similar areas.a71 Conduct frequent peer and design reviews.a71 Obtain demonstrat

    6、ion versions of COTS products.a71 Obtain customer references from vendors.a71 Select a product appropriately sized for your application.a71 Choose a product closely aligned with your projects requirements.a71 Select a vendor whose size will permit a working relationship.a71 Use vendor tutorials, doc

    7、umentation, and vendor contacts during COTS evaluation period.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2. Test and prototype COTS products in the lab. The prototyping and test phase of the COTS evaluation allows problems to be identified as th

    8、e system design to matures. These problems can be mitigated (often with the help and cooperation of the COTS vendor) well before the field-testing phase at which time it may be too costly or impossible to retrofit a solution. The following lessons were learned in the prototyping and test phase of th

    9、e SAFS/CSAFS development.a71 Prototype your systems hardware and software in a lab setting as similar to the field environment as possible; simulate how the product will work on various customer platforms; model the field operations; develop in stages with ongoing integration and testinga71 Pass per

    10、tinent information on to your customersa71 Accommodate your customers, where possible, by building in alternative optionsa71 Dont approve all requests for additional options by customers or new projects that come on line.a71 Select the best COTS components for product performance even if they are fr

    11、om multiple vendors.a71 Consider the expansion capability of any COTS producta71 Determine if the vendors support is adequate for your requirements3. Install, operate and maintain the COTS field and lab components. The following lessons were learned in the installation and operation phase of the SAF

    12、S/CSAFS development.a71 Personally perform on-site installations whenever possible.a71 Have support/maintenance contracts for hardware and software through development, deployment, and first year of operationa71 Create visual representations of system interactions where possible.a71 Obtain feedback

    13、from end usersa71 Maintain the prototype system after deployment.a71 Select COTS products with the ability to do internal logginga71 Recommendation(s): 1. Match COTS tools to project requirements. Recommendation: It is essential to conduct a thorough evaluation of project requirements and to compare

    14、 these requirements against COTS features and vendor capabilities.2. Test and prototype COTS products in the lab. Recommendation: Prototype COTS hardware and software in a lab setting as similar to the field environment as possible. Develop the prototype system in stages in the lab environment with

    15、on-going integration and testing through the designs maturity.3. Install, operate and maintain the COTS field and lab components. Recommendation: It is essential to be physically present when performing on-site installations, and that support/maintenance contracts be in place for COTS hardware and s

    16、oftware. It is also recommended Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-that a lab-based prototype system be maintained and staffed to permit the test of enhancements, upgrades and configuration changes to COTS software prior to field deliver

    17、y of these upgrades.4. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Sciencea71 Space Operationsa71 Exploration SystemsAdditional Key Phrase(s): a71 Administration/Organizationa71 Communication Systemsa71 Computersa71 Ground Equipmenta71

    18、 Ground Operationsa71 Information Technology/Systemsa71 Softwarea71 Test & VerificationAdditional Info: Approval Info: a71 Approval Date: 2003-07-28a71 Approval Name: Al Galloa71 Approval Organization: GSFCa71 Approval Phone Number: 301-286-3756Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1346-2003 Lessons Learned ADEOS-II NASA Ground Network (NGN) Development and Early Operations -- Central Standard Autonomous File Server (CSAFS SAFS) Lessons Learned.pdf)为本站会员(cleanass300)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开