《REG NASA-LLIS-1201-2002 Lessons Learned Flight Hardware Damage Due to Inadequate Test Planning and Insufficient QA Involvement (2001).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1201-2002 Lessons Learned Flight Hardware Damage Due to Inadequate Test Planning and Insufficient QA Involvement (2001).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1201Lesson Info:a71 Lesson Number: 1201a71 Lesson Date: 2002-01-01a71 Submitting Organization: JPLa71 Submitted by: Jim NewellSubject: Flight Hardware Damage Due to Inadequate Test Planning and Insufficient QA Involvement (2001) Abstract: Encoder channels on 44 MER motors were
2、 damaged during test due to an improperly inspected cable, lack of safe-to-mate provisions, inadequate test coverage by QA, and failure to verify encoder function following the first of the 44 tests.Recommendations included the need for approved test plans, completion of operational safety action it
3、ems, first item witnessing by QA, and comprehensive functional checks after testing of the first item. Description of Driving Event: During dynamometer testing of Mars Exploration Rover (MER) motors, position indication circuitry (within the encoder portion of the motor) was damaged. A test cable co
4、nnector used to supply power to the motor brush leads was damaged prior to the first motor test. Its use resulted in inadvertent and improper powering of the encoders. Ultimately, damage occurred to at least one encoder channel on each of the first 44 motor assemblies that were tested. These commerc
5、ial motors are used on MER for such purposes as Airbag Retraction Actuators, and they are long lead-time acquisition items. Several errors contributed to the test failure: a71 A special GSE power supply/monitor had been subjected to failure modes and effects analysis (FMEA) and approved for use on t
6、he motors. However, it was intentionally not used during dynamometer testing in order to avoid powering the encoder. Instead, an auxiliary power supply was directly connected with a two-wire cable.a71 The two-wire power cable had one connector with an improperly crimped shell. The cable Provided by
7、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-was not properly inspected and tested prior to use on this critical hardware.a71 There was no test plan or test procedure written for the dynamometer test operations. Results of the Operational Safety Survey (OSS)
8、required an approved test procedure and Assembly Instruction Data Sheets (AIDS) prior to test commencement. Although step-by-step AIDS were prepared and approved by QA, they contained no safe-to-mate provisions for attachment of the power connector.a71 Although QA witnessed some of the dynamometer t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS12012002LESSONSLEARNEDFLIGHTHARDWAREDAMAGEDUETOINADEQUATETESTPLANNINGANDINSUFFICIENTQAINVOLVEMENT2001PDF

链接地址:http://www.mydoc123.com/p-1018840.html