1、Lessons Learned Entry: 1193Lesson Info:a71 Lesson Number: 1193a71 Lesson Date: 2001-08-16a71 Submitting Organization: GSFCa71 Submitted by: Del Jenstrom/R.J. McGlynnSubject: Formulation Phase SEB - Proposal Review Process Improvement Recommendations Description of Driving Event: A number of process
2、improvement observations/recommendations were made following the Geostationary Operational Environmental Satellite (GOES) Advance Baseline Imager (ABI) Formulation Phase Source Evaluation Board Proposal review process. The lessons learned recommendations (2) were formulated through direct GOES ABI S
3、EB experience. These recommendations (lessons learned format) are aimed at minimizing biases and facilitating a more uniform and equitable approach within the proposal review process.Lesson(s) Learned: The potential for inherent (and understandable) biases within the SEB Proposal Review process to i
4、nfluence this process is well known . These biases are tied to individual experiences with varying contractors, programs, hardware, biases established due to the iterative nature of proposal development and evaluation, past proposal review experience, etc. In order to better control the influences o
5、f these biases and provide a uniform and equitable review of the submitted proposals the SEB team should consider the following recommendations prior to commencing with the applicable activities.Recommendation(s): 1. Upon receipt of the proposals, scan through them and start the evaluation process w
6、ith what you think will be a nominal proposal, rather than starting with the best or worst, or arbitrarily doing them alphabetically or some other order. Beginning with a nominal one will calibrate the team, encourage everyone to fairly look for strengths (which seems to be a harder concept for peop
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS11932001LESSONSLEARNEDFORMULATIONPHASESEBPROPOSALREVIEWPROCESSIMPROVEMENTRECOMMENDATIONSPDF

链接地址:http://www.mydoc123.com/p-1018832.html