REG NASA-LLIS-0970-2001 Lessons Learned Planning for Transition of Project Management Responsibilities.pdf
《REG NASA-LLIS-0970-2001 Lessons Learned Planning for Transition of Project Management Responsibilities.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0970-2001 Lessons Learned Planning for Transition of Project Management Responsibilities.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0970Lesson Info:a71 Lesson Number: 0970a71 Lesson Date: 2001-07-26a71 Submitting Organization: HQa71 Submitted by: Wilson HarkinsSubject: Planning for Transition of Project Management Responsibilities Description of Driving Event: In the 1995-1996 timeframe the Office of Safet
2、y and Mission Assurance (OSMA) began development of a distance learning capability under the umbrella of the Professional Development Initiative (PDI). This distance learning capability eventually evolved from a Safety and Mission Assurance discipline system into the Site for Online Learning and Res
3、ources (SOLAR) (http:/solar.msfc.nasa.gov), currently one of NASAs primary distance learning resources. The intent of the initial development effort was to design and implement a prototype system for the Safety and Mission Assurance discipline. OSMA managed the project and the Training and Developme
4、nt Division at NASA Headquarters (Hereafter referred to as the Sponsor) provided the funding. The only stipulation that the Sponsor made was that whatever capability was developed it needed to be adaptable for use across all of the Agencys functional disciplines. The prototype distance learning syst
5、em was successful and did evolve into SOLAR which is a multi-discipline Agencywide distance learning system.As part of the decision to release SOLAR, OSMA and the Sponsor agreed that since the training materials were no longer limited to just the Safety and Mission Assurance discipline, that at some
6、 point in time the Sponsor would assume responsibility from OSMA for day-to-day management of the overall system. OSMA and the other functional discipline areas would retain responsibility for their individual discipline segments of the system including their specific course materials. No milestone
7、was established for the transition of responsibility and no planning was conducted to prepare for the transition. Both the OSMA Project Team and the Sponsor assumed that there would be adequate opportunity to plan and prepare for the transition of responsibility.Unfortunately, changing needs within
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS09702001LESSONSLEARNEDPLANNINGFORTRANSITIONOFPROJECTMANAGEMENTRESPONSIBILITIESPDF

链接地址:http://www.mydoc123.com/p-1018615.html