1、Lessons Learned Entry: 0907Lesson Info:a71 Lesson Number: 0907a71 Lesson Date: 2000-08-01a71 Submitting Organization: GSFCa71 Submitted by: Mark BrumfieldSubject: Core Competency of Subcontractors Description of Driving Event: The POES Program made a decision to embellish an instrument by incorporat
2、ing a new scanner design. This new design was to replace a weak motor with a stronger one that would have the same operational performance. In doing this, the motor and the drive electronics had to be replaced. The Prime Instrument contractor always subcontracts out the build of the motors, and this
3、 time the decision was made to allow the motor vendor to build the control electronics as well as the motor. The build of the control electronics was a new venue for the motor vendor and made an equitable offer to the Prime for both the motor and the control electronics. The vendor was never able to
4、 produce the control electronics and that activity had to be brought back in-house by the Prime. As a consequence, the modification experienced a significant over-run and substantial delays in the delivery of the units.Lesson(s) Learned: If an offer seems too good to be true, it probably is. By exte
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS09072000LESSONSLEARNEDCORECOMPETENCYOFSUBCONTRACTORSPDF

链接地址:http://www.mydoc123.com/p-1018552.html