REG NASA-LLIS-0619-1999 Lessons Learned Management& Planning Production Fabrication Development.pdf
《REG NASA-LLIS-0619-1999 Lessons Learned Management& Planning Production Fabrication Development.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0619-1999 Lessons Learned Management& Planning Production Fabrication Development.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0619Lesson Info:a71 Lesson Number: 0619a71 Lesson Date: 1999-04-09a71 Submitting Organization: GSFCa71 Submitted by: Don Margolies/Elizabeth SmithSubject: Management & Planning, Production/Fabrication/Development Description of Driving Event: The primary objective of the Advan
2、ced Composition Explorer (ACE) Project was to determine and compare the elemental and isotopic composition of several distinct samples of matter, including the solar corona, the interplanetary medium, the local interstellar medium, and galactic matter. The Goddard Space Flight Center (GSFC) and the
3、National Aeronautics and Space Administration (NASA) Headquarters Office of Space Science (OSS) undertook the ACE mission development including the execution phase. The GSFC agreed to launch ACE no later than December 1997 on a not-to-exceed cost basis. The end result was that the missions actual co
4、st was considerably less than the limit and the launch date was earlier than projected.Lesson(s) Learned: The ACE project approach was to stick to design where “good is good enough“ and not allow hardware changes just for the sake of “improvement“. A reasonable schedule with key milestones was estab
5、lished with heavy emphasis on maintaining it. The ability to reallocate funds as needed was crucial to keeping the mission on target. The management arrangement was innovative and resulted in a 3-way nexus of centers, the GSFC for project management, the California Institute of Technology (CIT) for
6、the payload development and the Johns Hopkins University JHU Applied Physics Laboratory (APL) for the spacecraft development. Each center had enough power and independence that aided in reaching solutions and working out difficult situations.Specific techniques used during the execution of ACE inclu
7、ded:1. Maintain full and open communications with all project peers in up, down and sideways directions. Foster team approaches by being open, honest and frank in discussions with team members.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2. Place
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS06191999LESSONSLEARNEDMANAGEMENTPLANNINGPRODUCTIONFABRICATIONDEVELOPMENTPDF

链接地址:http://www.mydoc123.com/p-1018266.html