REG NASA-LLIS-0060-1985 Lessons Learned - Effective Tagout and Lockout Compliance Upper Limit Switches Utilized as Operational Stops Momentary Switches Wire Rope Spooling System Ac.pdf
《REG NASA-LLIS-0060-1985 Lessons Learned - Effective Tagout and Lockout Compliance Upper Limit Switches Utilized as Operational Stops Momentary Switches Wire Rope Spooling System Ac.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0060-1985 Lessons Learned - Effective Tagout and Lockout Compliance Upper Limit Switches Utilized as Operational Stops Momentary Switches Wire Rope Spooling System Ac.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0060Lesson Info:a71 Lesson Number: 0060a71 Lesson Date: 1985-02-20a71 Submitting Organization: KSCa71 Submitted by: David PenningtonSubject: Effective Tagout and Lockout Compliance; Upper Limit Switches Utilized as Operational Stops; Momentary Switches; Wire Rope Spooling Syst
2、em; Access Platform Load Rating; Telescoping Tubes of the OPF Access Platform System; Commonality Between High Bay 1 and High Bay 2 Payload Bay Access Platforms Description of Driving Event: During final closeout operations of the space shuttle orbiter in High Bay 2 of the Orbiter Processing Facilit
3、y (OPF), a payload bay access platform fell from its stowed position, damaging the orbiters left payload bay door and injuring a technician. The platforms hoisting cable was previously weakened when technicians used the platform system while it was tagout/lockout. The weakened cable continued to str
4、etch and break, even though the technicians returned it to its stowed position.Lesson(s) Learned: 1. Use of an inadequate tagout or lockout device may allow improper restoration of a system previously tagged as hazardous.2. Upper limit switches being used as operational stops can not be relied upon
5、to stop the operation during an emergency.3. Momentary switches that stick in the “on“ position may damage equipment and endanger personnel.4. Hoist systems (as used in the OPF) can release excessive lengths of cable from the spool.5. Operations in the orbiter processing facility are limited by acce
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS00601985LESSONSLEARNEDEFFECTIVETAGOUTANDLOCKOUTCOMPLIANCEUPPERLIMITSWITCHESUTILIZEDASOPERATIONALSTOPSMOMENTARYSWITCHESWIREROPESPOOLINGSYSTEMACPDF

链接地址:http://www.mydoc123.com/p-1017714.html