欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0060-1985 Lessons Learned - Effective Tagout and Lockout Compliance Upper Limit Switches Utilized as Operational Stops Momentary Switches Wire Rope Spooling System Ac.pdf

    • 资源ID:1017714       资源大小:14.64KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0060-1985 Lessons Learned - Effective Tagout and Lockout Compliance Upper Limit Switches Utilized as Operational Stops Momentary Switches Wire Rope Spooling System Ac.pdf

    1、Lessons Learned Entry: 0060Lesson Info:a71 Lesson Number: 0060a71 Lesson Date: 1985-02-20a71 Submitting Organization: KSCa71 Submitted by: David PenningtonSubject: Effective Tagout and Lockout Compliance; Upper Limit Switches Utilized as Operational Stops; Momentary Switches; Wire Rope Spooling Syst

    2、em; Access Platform Load Rating; Telescoping Tubes of the OPF Access Platform System; Commonality Between High Bay 1 and High Bay 2 Payload Bay Access Platforms Description of Driving Event: During final closeout operations of the space shuttle orbiter in High Bay 2 of the Orbiter Processing Facilit

    3、y (OPF), a payload bay access platform fell from its stowed position, damaging the orbiters left payload bay door and injuring a technician. The platforms hoisting cable was previously weakened when technicians used the platform system while it was tagout/lockout. The weakened cable continued to str

    4、etch and break, even though the technicians returned it to its stowed position.Lesson(s) Learned: 1. Use of an inadequate tagout or lockout device may allow improper restoration of a system previously tagged as hazardous.2. Upper limit switches being used as operational stops can not be relied upon

    5、to stop the operation during an emergency.3. Momentary switches that stick in the “on“ position may damage equipment and endanger personnel.4. Hoist systems (as used in the OPF) can release excessive lengths of cable from the spool.5. Operations in the orbiter processing facility are limited by acce

    6、ss platforms that are limited to loads of 500 pounds or less.6. Telescopic tubes have experienced binding as they were lowered, indicated by a tube descending suddenly to its proper position after becoming free.7. Servicing operations utilizing payload bay access platforms have shown that a common s

    7、peed mode for both east and west platforms is undesirable.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Recommendation(s): 1. Design positive lockout devices that will ensure compliance with lockout/tagout directives.2. Install operational stopping

    8、 devices that will permit stowing of the platform vertically without the use of the upper limit switch.3. Momentary switches utilized in control systems should have a manual release capability designed in.4. Design the wire rope spooling systems to include stops that will prevent excessive amounts o

    9、f wire rope from being released.5. Enhance the hoist system of the OPF access platforms to support heavier loads (up to 1500 pounds).6. Provide a device in the wire rope system that will sense excessive loads and stop the hoist when a safe load is exceeded or the cable is slack.7. Change the High Ba

    10、y 1 access platform to operate the same way as High Bay 2, where both east and west platforms have independent speed modes.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Facilitiesa71 Ground Operationsa71 Grou

    11、nd Equipmenta71 Hardwarea71 Hazardous/Toxic Waste/Materialsa71 Industrial Operationsa71 Safety & Mission AssuranceAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 1994-06-02a71 Approval Name: James G. Klinea71 Approval Organization: KSC/HEIa71 Approval Phone Number: 407-867-7614Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0060-1985 Lessons Learned - Effective Tagout and Lockout Compliance Upper Limit Switches Utilized as Operational Stops Momentary Switches Wire Rope Spooling System Ac.pdf)为本站会员(lawfemale396)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开