1、 1 o f 3 08/20/99 PARACHUTE INDUSTRY ASSOCIATION PARACHUTE INDUSTRY ASSOCIATION SPECIFICATIONS COMMITTEE REVIEW PROCEDURE 1. Specification Status 1.1. Document Status . Where applicable, initially published PIA Specifications represent the latest version of the corresponding Military Specification i
2、nclusive of all approved amendments existing at the time of publication. 1.2 Document Date . The date on the PIA Document is the date of approval for publication. 2. Review Process - Change Proposal. 2.1 Change P roposals . Beneficial comments (recommendations, additions, deletions) and any pertinen
3、t data which may improve a specification shall be submitted to the PIA in writing by using the Change Proposal form. Anyone may submit a suggestion, but the sponsor shoul d be prepared to supply justification including supporting data and test samples which may be needed for evaluation of the propos
4、al. The Change Proposal shall be sent to the Parachute Industry Association for review, c/o Administrative Director, at the add ress listed in Section 8 at least 60 days prior to the next PIA Meeting. The Specifications Committee will send Change Proposals to members for review at least 45 days prio
5、r to the next meeting. 2.2 Change Proposal Review . Complete Change Proposals submit s shall be placed on the agenda of the PIA Specifications Committee for review on the next scheduled meeting date. 2.3 Review Process . The processing of Change Proposals is described in Section 4. 3. Review Process
6、 - Periodic Maintenance. 3.1 Periodic R eview . PIA Specification Documents will be periodically reviewed by the Specifications Committee with input from users, manufacturers, and other interested parties. At least every five years, specifications which have had no amendments or change proposal a ct
7、ivity during this time will be brought up for routine review by the PIA at the first meeting following the fifth anniversary of the document date. 3.2 Notification of Review . Documents to be routinely reviewed over the next PIA calendar year will be lis ted under the PIA Internet Home Page and in t
8、he Para NewsBrief 45 days prior to the next PIA meeting. 3.3 Mail Distribution List . The PIA Specifications Committee will develop a mailing list of interested parties who will receive advance notification of d ocuments for review 45 days prior to the next PIA meeting. To be included on the distrib
9、ution list, send a letter giving name, address, employer, and position to the PIA address in Section 8. TS - 124 2 o f 3 08/20/99 4. Specifications Committee Review Protocol: 4.1 First Meeti ng Agenda . Items to be considered for discussion at the PIA Winter Meeting (or first meeting of the calendar
10、 year) will include Change Proposals and Specifications for Periodic Review. 4.1.1 Change Proposals which are complete and properly formatted and which have been communicated to the Specifications Committee 45 days in advance will be brought up for discussion. Supporting information, data, and test
11、results may be presented. The committee may discuss the proposal and suggest if additional information is needed or is ready for an approval vote. Complete Change Proposals and any approvals for voting will become a part of the official minutes of the Committee and will be distributed to the recipie
12、nts of the Specifications Committee Mail Distribution List . Change Proposals which have been approved by vote of the Specifications Committee since the last meeting will be finalized editorially and prepared for publication and distribution. 4.1.2 Specifications for Routine Review for the calendar
13、year which hav e been previously publicized 45 days prior to the meeting will be noted individually with a brief discussion period. Any further suggestions for change must be submitted on a Change Proposal and cannot be formally presented until the next Committee meetin g. 4.1.3 Proceedings of the S
14、pecifications Committee will be published along with copies of complete Change Proposals and will be distributed to the Mail Distribution List. A brief of the Committee Proceedings will be posted on the PIA Internet Home Page a nd in the ParaNewsBriefs. 4.1.4 Response to Change Proposals is invited
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- PIATS1241999PARACHUTEINDUSTRYASSOCIATIONSPECIFICATIONSCOMMITTEEREVIEWPROCEDURE 降落伞 工业协会 规范 委员会 审查 程序

链接地址:http://www.mydoc123.com/p-1016653.html