NFPA 1006 AMD 1-2013 Standard for Technical Rescuer Professional Qualifications (Effective Date 11 11 2013).pdf
《NFPA 1006 AMD 1-2013 Standard for Technical Rescuer Professional Qualifications (Effective Date 11 11 2013).pdf》由会员分享,可在线阅读,更多相关《NFPA 1006 AMD 1-2013 Standard for Technical Rescuer Professional Qualifications (Effective Date 11 11 2013).pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、 Tentative Interim Amendment NFPA1006 Standard for Technical Rescuer Professional Qualifications 2013 Edition Reference: 7.1, 8.1, 9.1, 10.1, 16.1, 17.1.1, 18.1, and A.6.1.2 TIA 13-1 (SC 13-10-8/TIA Log #1103) Pursuant to Section 5 of the NFPA Regulations Governing the Development of NFPA Standards,
2、 the National Fire Protection Association has issued the following Tentative Interim Amendment to NFPA 1006, Standard for Technical Rescuer Professional Qualifications, 2013 edition. The TIA was processed by the Technical Committee on Rescue Technician Professional Qualification and the Correlating
3、Committee on Professional Qualifications, and was issued by the Standards Council on October 22, 2013, with an effective date of November 11, 2013. A Tentative Interim Amendment is tentative because it has not been processed through the entire standards-making procedures. It is interim because it is
4、 effective only between editions of the standard. A TIA automatically becomes a public input of the proponent for the next edition of the standard; as such, it then is subject to all of the procedures of the standards-making process. 1. Revise subsections 7.1, 8.1, 9.1, 10.1, 16.1, 17.1.1 and 18.1 t
5、o read as follows: 7.1 Level I General Requirements. The job performance requirements defined in 6.1.1 and 6.1.2 and in 7.1.1 through 7.1.5 shall be met prior to Level I qualification in confined space rescue. 8.1 Level I General Requirements. The job performance requirements defined in 6.1.1 and 6.
6、1.2 and in 8.1.1 through 8.1.7 shall be met prior to Level I qualification in trench rescue. 9.1 Level I General Requirements. The job performance requirements defined in 6.1.1 and 6.1.2 and in 9.1.1 through 9.1.13 shall be met prior to Level I qualification in structural collapse rescue. 10.1 Level
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NFPA1006AMD12013STANDARDFORTECHNICALRESCUERPROFESSIONALQUALIFICATIONSEFFECTIVEDATE11112013PDF
链接地址:http://www.mydoc123.com/p-1008163.html