NEMA PRP 5-2015 Installation Guidelines for Surface Nonmetallic Raceway.pdf
《NEMA PRP 5-2015 Installation Guidelines for Surface Nonmetallic Raceway.pdf》由会员分享,可在线阅读,更多相关《NEMA PRP 5-2015 Installation Guidelines for Surface Nonmetallic Raceway.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、NEMA Standards PublicationNational Electrical Manufacturers AssociationNEMA PRP 5-2015Installation Guidelinesfor Surface NonmetallicRacewayNEMA Standards Publication PRP 5-2015 Installation Guidelines for Surface Nonmetallic Raceway Published by National Electrical Manufacturers Association 1300 Nor
2、th 17th Street, Suite 900 Rosslyn, VA 22209 www.nema.org 2015 National Electrical Manufacturers Association. All rights, including translation into other languages, reserved under the Universal Copyright Convention, the Berne Convention for the Protection of Literary and Artistic Works, and the Inte
3、rnational and Pan American copyright conventions. 2015 National Electrical Manufacturers Association NOTICE AND DISCLAIMER The information in this publication was considered technically sound by the consensus of persons engaged in the development and approval of the document at the time it was devel
4、oped. Consensus does not necessarily mean that there is unanimous agreement among every person participating in the development of this document. NEMA standards and guideline publications, of which the document contained herein is one, are developed through a voluntary consensus standards developmen
5、t process. This process brings together volunteers and/or seeks out the views of persons who have an interest in the topic covered by this publication. While NEMA administers the process and establishes rules to promote fairness in the development of consensus, it does not write the document and it
6、does not independently test, evaluate, or verify the accuracy or completeness of any information or the soundness of any judgments contained in its standards and guideline publications. NEMA disclaims liability for any personal injury, property, or other damages of any nature whatsoever, whether spe
7、cial, indirect, consequential, or compensatory, directly or indirectly resulting from the publication, use of, application, or reliance on this document. NEMA disclaims and makes no guaranty or warranty, expressed or implied, as to the accuracy or completeness of any information published herein, an
8、d disclaims and makes no warranty that the information in this document will fulfill any of your particular purposes or needs. NEMA does not undertake to guarantee the performance of any individual manufacturer or sellers products or services by virtue of this standard or guide. In publishing and ma
9、king this document available, NEMA is not undertaking to render professional or other services for or on behalf of any person or entity, nor is NEMA undertaking to perform any duty owed by any person or entity to someone else. Anyone using this document should rely on his or her own independent judg
10、ment or, as appropriate, seek the advice of a competent professional in determining the exercise of reasonable care in any given circumstances. Information and other standards on the topic covered by this publication may be available from other sources, which the user may wish to consult for additio
11、nal views or information not covered by this publication. NEMA has no power, nor does it undertake to police or enforce compliance with the contents of this document. NEMA does not certify, test, or inspect products, designs, or installations for safety or health purposes. Any certification or other
12、 statement of compliance with any health- or safety-related information in this document shall not be attributable to NEMA and is solely the responsibility of the certifier or maker of the statement. NEMA PRP 5-2015 Page i 2015 National Electrical Manufacturers Association Foreword The purpose of th
13、ese guidelines is to describe the procedures and recommended practices for properly installing surface nonmetallic raceway (SNR) and SNR fittings. These guidelines are in no way intended to assume or replace any responsibilities of engineers, customer representatives, owners, or other persons in est
14、ablishing engineering design practices and procedures best suited to individual job conditions. The NEMA Polymer Raceway Products Section, through its members, works closely with such organizations as the National Electrical Contractors Association and others in the periodic review and revision of i
15、ts standards for any changes necessary to keep them up to date with evolving technology. Proposed or recommended revisions should be submitted to: Vice President, Industry Operations National Electrical Manufacturers Association 1300 North 17th Street, Suite 900 Rosslyn, Virginia 22209 These guideli
16、nes were developed and approved by the NEMA Polymer Raceway Section. At the time of approval, the Polymer Raceway Section consisted of the following members: Anamet Electrical, Inc http:/ Mattoon, IL AFC Cable Systems, a part of Atkore International New Bedford, MA Allied Tube and Conduit, a part of
17、 Atkore International Harvey, IL Champion Fiberglass, Inc. Spring, TX FRE Composites (2005) I St. Andre-dArgenteuil, PQ, Canada Hubbell Incorporated Shelton, CT IPEX Management Inc. Mississauga, ON, Canada Legrand North Americawww.legrand.us West Hartford, CT Panduit Corporation Tinley Park, IL Roya
18、l Building Products ShelbyTownship, MI Southern Pipe, Inc. www.southern-New London, NC Thomas it is recommended that the work described be performed by qualified persons familiar with standard electrical construction practices, electrical equipment, and safety of electrical wiring systems. 6.2 CUTTI
19、NG RACEWAY AND COVER SNRs insulative nature slows the dissipation of heat built up at the cutting interface. This can lead to localized melting or warping if excessive heat develops. Care must be taken to balance the feed rate with the cutting speed to avoid localized melting. Clearance in the cutti
20、ng area is also helpful in reducing heat NEMA PRP 5-2015 Page 3 2015 National Electrical Manufacturers Association build-up. The use of carbide-tipped blades is recommended because they last longer and produce more uniform cuts. For larger raceway sizes and large quantities of cuts, the following me
21、thods are suggested: a) Band saws: use a 0.020-0.025 inchthick blade having 14 teeth per inch (V-tooth edge). The blade material should be a hardened or tempered material. The saw should be operated at 4000-4500 feet per minute. The feed rate must compensate for the blade speed to avoid overheating.
22、 If localized melting occurs, either feed faster or slow the blade speed, if possible. Watch for dulling of the blade teeth. b) Table and circular saws: a blade with a diameter of 10-14 inches with a thickness of 0.110-0.120 inches is convenient for straight cuts. The blade should have 80-100 teeth
23、and a kerf of 0.125 in. For smaller raceway sizes, a hand-held cutting tool is recommended that typically can be obtained through a raceway manufacturer. A fine-tooth handsaw can also be used. 6.3 BENDING RACEWAY 1) Slide an 18-30inch section of the appropriate profile size raceway into a pipe heati
24、ng blanket (not offered by the raceway manufacturer) as shown in Figure 1. A recommended blanket size is one that is designed for bending a Trade Size -1 conduit. 2) Allow the raceway section to heat approximately 2-3 minutes, as shown in Figure 2. The raceway will be become soft and pliable but sho
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NEMAPRP52015INSTALLATIONGUIDELINESFORSURFACENONMETALLICRACEWAYPDF

链接地址:http://www.mydoc123.com/p-994390.html