NAVY UFGS-32 84 24-2011 IRRIGATION SPRINKLER SYSTEMS《灌溉洒水器系统》.pdf
《NAVY UFGS-32 84 24-2011 IRRIGATION SPRINKLER SYSTEMS《灌溉洒水器系统》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-32 84 24-2011 IRRIGATION SPRINKLER SYSTEMS《灌溉洒水器系统》.pdf(36页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 84 24 (August 2011)-Preparing Activity: NAVFAC SupersedingUFGS-32 84 24 (May 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2011*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 84 24IRRIGATI
2、ON SPRINKLER SYSTEMS08/11PART 1 GENERAL1.1 REFERENCES1.2 RELATED REQUIREMENTS1.3 SYSTEM DESCRIPTION1.4 SUBMITTALS1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Delivery1.5.2 Storage1.5.3 Handling1.6 EXTRA STOCK1.7 QUALITY ASSURANCE1.7.1 Required TestPART 2 PRODUCTS2.1 PIPING MATERIALS2.1.1 Copper Tubing a
3、nd Associated Fittings2.1.1.1 Tubing2.1.1.2 Fittings2.1.2 Red Brass Pipe and Associated Fittings2.1.2.1 Pipe2.1.2.2 Fittings2.1.3 Galvanized Steel Pipe and Associated Fittings2.1.3.1 Pipe2.1.3.2 Fittings2.1.4 Polyvinyl Chloride (PVC) Pipe, Fittings and Solvent Cement2.1.4.1 Pipe2.1.4.2 Fittings2.1.4
4、.3 Solvent Cement2.1.5 Polyethylene (PE) Plastic Piping2.1.5.1 Pipe2.1.5.2 Fittings2.1.6 Dielectric Fittings2.1.7 Drip Irrigation Tubing2.1.8 Pipe SleevingSECTION 32 84 24 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2 IRRIGATION AND DRIP
5、SPRINKLER HEADS2.2.1 Fixed Riser Irrigation Heads2.2.1.1 Stream Rotors, Full or Part Circle2.2.1.2 Gear Rotor Irrigation Head, Full or Part Circle2.2.1.3 Impact Irrigation Head2.2.1.4 Spray Irrigation Heads, Full or Part Circle2.2.1.5 Adjustable Flood Bubbler Head2.2.1.6 Pressure Compensating Flood
6、Bubbler Head2.2.2 Pop-Up Irrigation Head2.2.2.1 Stream Rotor Irrigation Head, Full or Part Circle2.2.2.2 Gear Rotor Irrigation Head, Full or Part Circle2.2.2.3 Impact Irrigation Head2.2.2.4 Spray Irrigation Head, Full or Part Circle2.2.3 Bubbler Irrigation Head2.2.3.1 Adjustable Flood Bubbler2.2.3.2
7、 Pressure Compensating Flood Bubbler2.2.4 Fixed Drip Head2.2.4.1 Multi-Port Outlet Device2.2.4.2 Single Outlet Pressure Compensating Emission Device2.2.4.3 Microspray Device2.2.4.4 In-Line Tubing Device2.2.5 Pop-Up Drip Head2.3 VALVES2.3.1 Isolation Valve2.3.1.1 Ball Valves, Less than 75 mm 3 Inches
8、2.3.1.2 Gate Valves, 75 mm 3 Inches and Larger2.3.2 Control Valves2.3.2.1 Pressure Regulating Master Control Valve2.3.2.2 Remote Control Valve, Electrical2.3.2.3 Manual Angle Control Valve, Manual Globe Control Valve2.3.3 Quick Coupling Valves2.3.4 Hose Bib2.3.5 Drain Valves2.3.5.1 Manual2.3.5.2 Aut
9、omatic2.3.6 Backflow Preventers2.3.6.1 Reduced Pressure Type Backflow Preventers2.3.6.2 Pressure Type Vacuum Breaker2.3.6.3 Atmospheric Vacuum Breaker2.4 ACCESSORIES AND APPURTENANCES2.4.1 Tapping Tee2.4.2 Water Meter2.4.3 Drip Head Accessories2.4.3.1 Strainer2.4.3.2 Riser Adapters2.4.3.3 Tubing Sta
10、kes2.4.3.4 Bug Cap2.4.3.5 Subterranean Drip Box and Cover2.4.3.6 Line Flushing Valve2.4.3.7 Valve Boxes2.4.4 Backflow Preventer Accessories2.4.4.1 Pressure Gages2.4.4.2 Water Hammer Arresters2.4.4.3 Backflow Preventer Enclosure2.4.4.4 Concrete Pads2.4.5 Moisture Sensing Device2.4.5.1 Automatic Rain
11、Shut-Off Device2.4.5.2 Automatic Freeze Shut-Off Device2.4.5.3 Soil Moisture Sensor DeviceSECTION 32 84 24 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.4.6 Air/Vacuum Relief2.4.7 Water Booster Package2.4.7.1 Pump2.4.7.2 Motor2.4.7.3 Piping
12、 and Fittings2.4.7.4 Gages2.4.7.5 Butterfly Valve2.4.7.6 Check Valves2.4.7.7 Pump Control Panels2.4.8 Flow Meter2.5 Automatic Controller Electrical Solar Battery2.5.1 Controller Features2.6 ELECTRICAL CIRCUITS2.6.1 Control Wiring for Electrically Operated Valves2.6.2 Conduit2.7 CONCRETE MATERIALSPAR
13、T 3 EXECUTION3.1 INSTALLATION3.1.1 Trenching3.1.2 Piping System3.1.2.1 Clearances3.1.2.2 Minimum Pitch3.1.2.3 Thrust Blocks3.1.2.4 Minimum Backfill Cover3.1.2.5 Restoration3.1.2.6 Sterilization3.1.3 Piping Installation3.1.3.1 Polyvinyl Chloride (PVC) Pipe3.1.3.2 Soldered Copper Tubing3.1.3.3 Threade
14、d Brass or Galvanized Steel Pipe3.1.3.4 Polyethylene (PE) Pipe and Drip Tubing3.1.3.5 Dielectric Protection3.1.4 Irrigation Heads3.1.4.1 Fixed Riser Irrigation Heads3.1.4.2 Pop-Up Irrigation Head3.1.4.3 Drip Heads3.1.5 Valves3.1.5.1 Isolation Valves3.1.5.2 Control Valves3.1.5.3 Quick Coupling Valves
15、3.1.5.4 Hose Bibb3.1.5.5 Drain Valves3.1.6 Backflow Preventers3.1.6.1 Reduced Pressure Backflow Preventer3.1.6.2 Pressure Vacuum Breaker3.1.6.3 Atmospheric Vacuum Breaker3.1.7 Accessories3.1.7.1 Connection To Existing Water Supply Systems (Tapping Tee)3.1.7.2 Water Meter3.1.7.3 Valve Boxes and Lids3
16、.1.7.4 Backflow Preventer Enclosure3.1.7.5 Rain and Freeze Shut-Off Devices3.1.7.6 Soil Moisture Sensing Device3.1.7.7 Air/Vacuum Relief Valve3.1.8 Electrical Circuits3.1.8.1 Loops3.1.8.2 Expansion and ContractionSECTION 32 84 24 Page 3Provided by IHSNot for ResaleNo reproduction or networking permi
17、tted without license from IHS-,-,-3.1.8.3 Splices3.1.9 Automatic Controller3.1.10 Flushing3.1.11 Adjustment3.1.12 Sterilization3.2 FIELD QUALITY CONTROL3.2.1 Pressure Test3.2.1.1 Duration3.2.1.2 Leaks3.2.1.3 Retest3.2.2 Operation Test3.2.2.1 Accessories3.2.2.2 Acceptance3.2.3 Controller Charts- End
18、of Section Table of Contents -SECTION 32 84 24 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 84 24 (August 2011)-Preparing Activity: NAVFAC SupersedingUFGS-32 84 24 (May 2010) UNIFIED FACILITIES GUIDE S
19、PECIFICATIONSReferences are in agreement with UMRL dated July 2011*SECTION 32 84 24IRRIGATION SPRINKLER SYSTEMS08/11*NOTE: This guide specification covers the requirements for irrigation sprinkler systems.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when edit
20、ing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements n
21、ot required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: Some paragraphs may need to be supplemented to meet project requirements.*PA
22、RT 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards C
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS3284242011IRRIGATIONSPRINKLERSYSTEMS 灌溉 洒水 系统 PDF

链接地址:http://www.mydoc123.com/p-984851.html