NAVY UFGS-32 13 43-2011 PERVIOUS CONCRETE PAVING《可渗透混凝土路面》.pdf
《NAVY UFGS-32 13 43-2011 PERVIOUS CONCRETE PAVING《可渗透混凝土路面》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-32 13 43-2011 PERVIOUS CONCRETE PAVING《可渗透混凝土路面》.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 13 43 (October 2011)-Preparing Activity: NAVFAC NEWUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 13 43PERVIOUS CONCRETE PAVING11/11PART 1 G
2、ENERAL1.1 REFERENCES1.2 RELATED SECTIONS1.3 SUBMITTALS1.4 DELIVERY AND STORAGE1.5 QUALITY ASSURANCE1.5.1 Ready-mixed Concrete Plant Certification1.5.2 Contractor Qualifications1.5.3 Required Information1.5.4 Batch Tickets1.5.5 Field-Constructed Mock Up1.6 SUSTAINABLE DESIGN REQUIREMENTS1.6.1 Local/R
3、egional MaterialsPART 2 PRODUCTS2.1 MATERIALS2.1.1 Cementitious Materials2.1.1.1 Cement2.1.1.2 Fly Ash and Pozzolan2.1.1.3 Slag2.1.2 Water2.1.3 Aggregate Tests2.1.3.1 Alkali Reactivity Test2.1.3.2 Fine Aggregates2.1.3.3 Coarse Aggregates2.1.4 Admixtures2.1.5 Curing Materials2.1.5.1 Polyethylene Shee
4、t2.1.6 Edge Restraints2.2 CONCRETE PAVEMENT2.2.1 Albedo2.3 CONTRACTOR-FURNISHED MIX DESIGNPART 3 EXECUTIONSECTION 32 13 43 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1 PREPARATION FOR PERVIOUS SYSTEMS3.2 FORMS3.2.1 Construction3.2.2 Coat
5、ing3.2.3 Grade and Alignment3.3 MEASURING, MIXING, CONVEYING, AND PLACING CONCRETE3.3.1 Measuring3.3.2 Mixing3.3.3 Conveying3.3.4 Placing3.3.5 Cold Weather3.3.6 Hot Weather3.4 PAVING3.4.1 Consolidation3.4.2 Operation3.4.3 Required Results3.4.4 Fixed Form Paving3.4.5 Slip Form Paving3.5 FINISHING CON
6、CRETE3.5.1 Side Form Finishing3.5.1.1 Equipment Operation3.5.1.2 Joint Finish3.5.1.3 Hand Finishing3.5.1.4 Longitudinal Floating3.5.2 Edging3.5.3 Jointing3.5.3.1 Joint Layout Drawings3.6 CURING AND PROTECTION3.6.1 White-Polyethylene Sheet3.7 FIELD QUALITY CONTROL3.7.1 Sampling3.7.2 Consistency Tests
7、3.7.3 Sample Cores3.7.4 Surface Testing3.7.4.1 Surface Smoothness Requirements3.7.4.2 Surface Smoothness Testing Method3.7.5 Plan Grade Testing and Conformance3.7.6 OPEN TO TRAFFIC3.8 WASTE MANAGEMENT- End of Section Table of Contents -SECTION 32 13 43 Page 2Provided by IHSNot for ResaleNo reproduct
8、ion or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 13 43 (October 2011)-Preparing Activity: NAVFAC NEWUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION 32 13 43PERVIOUS CONCRETE PAVING11/11*NOTE: This
9、 guide specification covers the requirements for pervious Pervious Portland cement concrete paving jobs such as roads, streets, sidewalks, and parking lots.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable it
10、ems(s) or insert appropriate information.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, o
11、r revising text. For bracketed items, choose applicable items(s) or insert appropriate information. Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and s
12、hould be submitted as a Criteria Change Request (CCR)*NOTE: The extent and location of the work to be accomplished should be indicated on the project drawings, or included in the project specifications. Precast structural concrete and portland cement pavements for airports are not included in this s
13、pecifications.Porous PCCP should not be used in areas with extensive winter maintenance and in areas where high wind is common (material can be wind blown and clog the pavement pores). Additionally, this pavement should not be used where there is heavy truck traffic.SECTION 32 13 43 Page 3Provided b
14、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed
15、in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to upda
16、te the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publicat
17、ions are referred to within the text by the basic designation only.AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)ACI 305R (2010) Specification for Hot Weather ConcretingACI 306.1 (1990; R 2002) Standard Specification for Cold Weather ConcretingACI 522.1 (2008) Specification For Pervious Concrete Pa
18、vementASTM INTERNATIONAL (ASTM)ASTM C1077 (2011b) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory EvaluationASTM C1157/C1157M (2010) Standard Specification for Hydraulic CementASTM C1260 (2007) Standard Test Method for P
19、otential Alkali Reactivity of Aggregates (Mortar-Bar Method)ASTM C140 (2011) Standard Test Methods for Sampling and Testing Concrete Masonry Units and Related UnitsSECTION 32 13 43 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM C150/C150M
20、 (2011) Standard Specification for Portland CementASTM C1567 (2008) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)ASTM C1602/C1602M (2006) Standard Specification for Mixing Water Used in Production o
21、f Hydraulic Cement ConcreteASTM C1688/C1688M (2010a) Standard Test Method For Density And Void Content Of Freshly Mixed Pervious ConcreteASTM C171 (2007) Standard Specification for Sheet Materials for Curing ConcreteASTM C172 (2010) Standard Practice for Sampling Freshly Mixed ConcreteASTM C174/C174
22、M (2006) Standard Test Method for Measuring Thickness of Concrete Elements Using Drilled Concrete CoresASTM C260/C260M (2010a) Standard Specification for Air-Entraining Admixtures for ConcreteASTM C33/C33M (2011) Standard Specification for Concrete AggregatesASTM C42/C42M (2010a) Standard Test Metho
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS3213432011PERVIOUSCONCRETEPAVING 渗透 混凝土 路面 PDF

链接地址:http://www.mydoc123.com/p-984850.html