NAVY UFGS-32 05 33-2010 LANDSCAPE ESTABLISHMENT《景观的建立》.pdf
《NAVY UFGS-32 05 33-2010 LANDSCAPE ESTABLISHMENT《景观的建立》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-32 05 33-2010 LANDSCAPE ESTABLISHMENT《景观的建立》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 05 33 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-32 05 33 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 05 33LANDS
2、CAPE ESTABLISHMENT02/10PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.2.1 Pesticide1.2.2 Stand of Turf1.2.3 Planter Beds1.3 RELATED REQUIREMENTS1.4 SUBMITTALS1.5 DELIVERY, STORAGE AND HANDLING1.5.1 Delivery1.5.2 Storage1.5.2.1 Fertilizer, Lime, Iron, Mulch Storage1.5.2.2 Antidessicants Storage1.5.3 Ha
3、ndling1.6 SUSTAINABLE DESIGN REQUIREMENTS1.6.1 Local/Regional Materials1.7 MAINTENANCEPART 2 PRODUCTS2.1 POST-PLANT FERTILIZER2.1.1 Granular Fertilizer2.2 WATER2.2.1 Hose2.3 MULCHES TOPDRESSING2.3.1 Inert Mulch Materials2.3.2 Organic Mulch Materials2.3.3 Recycled Organic Mulch2.4 PESTICIDESPART 3 EX
4、ECUTION3.1 EXTENT OF WORK3.1.1 Policing3.1.2 Drainage System MaintenanceSECTION 32 05 33 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2 IRRIGATION ESTABLISHMENT PERIOD3.2.1 Maintenance During the Irrigation Establishment Period3.2.2 Water
5、Restrictions3.2.3 Fire Hydrants3.2.4 Final Acceptance3.2.5 Controller Charts3.3 GROUNDCOVER ESTABLISHMENT PERIOD3.3.1 Frequency of Maintenance3.3.2 Promotion of Growth3.3.3 Mowing3.3.3.1 Turf3.3.3.2 Native Grasses3.3.3.3 Wildflowers3.3.4 Turf Edging and Trimming3.3.5 Post-Fertilizer Application3.3.6
6、 Turf Watering3.3.7 Turf Aeration3.3.8 Turf Clearance Area3.3.9 Replanting3.3.10 Final Inspection and Acceptance3.3.11 Unsatisfactory Work3.4 EXTERIOR PLANT ESTABLISHMENT PERIOD3.4.1 Frequency of Maintenance3.4.2 Promotion of Plant Growth and Vigor3.4.3 Planter Bed Maintenance3.4.3.1 Shrub Selective
7、 Maintenance3.4.3.2 Tree Maintenance3.4.4 Slope Erosion Control Maintenance3.4.5 Removal of Dying or Dead Plants3.4.6 Tracking of Unhealthy Plants3.4.7 Final Inspection3.4.7.1 Total Plants on Site3.4.7.2 Mulching and Weeding3.4.7.3 Tree Supports3.4.7.4 Remedial Work3.4.8 Unsatisfactory Work3.5 FIELD
8、 QUALITY CONTROL3.5.1 Maintenance Inspection Report3.5.2 Plant Quantities3.5.3 Tree Staking and Guying Removal- End of Section Table of Contents -SECTION 32 05 33 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA U
9、FGS-32 05 33 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-32 05 33 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 32 05 33LANDSCAPE ESTABLISHMENT02/10*NOTE: This guide specification covers the requirements for plant mate
10、rial and irrigation during the establishment period.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective
11、project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.R
12、ecommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in t
13、his paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update t
14、he issue dates.SECTION 32 05 33 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish
15、print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM D 2103 (2008) Standard Specification for Polyethylene Film and SheetingASTM D 5851 (19
16、95; R 2006) Planning and Implementing a Water Monitoring ProgramASTM D 6155 (2006) Nontraditional Coarse Aggregate for Bituminous Paving MixturesTREE CARE INDUSTRY ASSOCIATION (TCIA)TCIA Z133.1 (2006) American National Standard for Arboricultural Operations - Pruning, Repairing, Maintaining, and Rem
17、oving Trees, and Cutting Brush - Safety RequirementsU.S. GREEN BUILDING COUNCIL (USGBC)LEED (2002; R 2005) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)1.2 DEFINITIONS1.2.1 PesticideAny substance or mixture of substances, including biol
18、ogical control agents, that may prevent, destroy, repel, or mitigate pests and are specifically labeled for use by the U.S. Environmental Protection Agency (EPA). Also, any substance used as a plant regulator, defoliant, disinfectant, or biocide. Examples of pesticides include fumigants, herbicides,
19、 insecticides, fungicides, nematicides, molluscicides and rodenticides.1.2.2 Stand of Turf100 95 percent ground cover of the established species.1.2.3 Planter BedsA planter bed is defined as an area containing one or a combination of the following plant types: shrubs, vines, wildflowers, annuals, pe
20、rennials, ground cover, and a mulch topdressing excluding turf. Trees may also be found in planter beds.SECTION 32 05 33 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.3 RELATED REQUIREMENTSSection 32 84 24 IRRIGATION SPRINKLER SYSTEM applie
21、s to this section for installation of irrigation equipment requirements, with additions and modifications herein.Section 32 92 19 SEEDINGSection 32 92 23 SODDINGSection 32 92 26 SPRIGGING applies to this section for installation of seedsodsprigging requirements, with additions and modifications here
22、in.Section 32 93 00 EXTERIOR PLANTS applies to this section for installation of trees, shrubs, ground cover, vines, and wildflower, with additions and modifications herein.Section 32 96 00 TRANSPLANTING EXTERIOR PLANTS applies to this section for transplanting of trees, shrubs, ground cover, vines,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS3205332010LANDSCAPEESTABLISHMENT 景观 建立 PDF

链接地址:http://www.mydoc123.com/p-984842.html