NAVY UFGS-26 13 01-2013 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR.pdf
《NAVY UFGS-26 13 01-2013 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-26 13 01-2013 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCEC / NASA UFGS-26 13 01 (August 2013)-Preparing Activity: NAVFAC NEWUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2013*SECTION TABLE OF CONTENTSDIVISION 26 - ELECTRICALSECTION 26 13 01PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR08/13P
2、ART 1 GENERAL1.1 REFERENCES1.2 RELATED REQUIREMENTS1.3 DEFINITIONS1.3.1 Switched Way1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Switchgear Drawings1.5.2 Paint Coating System1.5.3 Fuse Time-Current Characteristic Curves1.6 MAINTENANCE1.6.1 Air Insulated Pad-mounted Switchgear Operation and Maintenance D
3、ataPART 2 PRODUCTS2.1 AIR INSULATED PAD-MOUNTED SWITCHGEAR2.1.1 Ratings and Test Requirements2.1.2 Switchgear Construction2.1.2.1 Pad-mounting Provisions2.1.2.2 Pad/Vault-mounting Provisions2.1.3 Load Interrupting Switched Ways2.1.4 Fused Ways2.1.4.1 Fuses2.1.5 Key Interlock2.1.6 Dead-Front High-Vol
4、tage Bushings2.2 Insulated High-Voltage Connectors2.3 Surge Arresters2.4 Grounding Provisions2.5 Fault Indicators2.6 SOURCE QUALITY CONTROL2.6.1 Switchgear Design and Production TestsPART 3 EXECUTION3.1 INSTALLATIONSECTION 26 13 01 Page 1Provided by IHSNot for ResaleNo reproduction or networking per
5、mitted without license from IHS-,-,-3.2 GROUNDING3.2.1 Grounding Electrodes3.2.2 Switchgear Grounding3.2.3 Connections3.2.4 Grounding and Bonding Equipment3.3 FOUNDATION FOR EQUIPMENT AND ASSEMBLIES3.4 FIELD QUALITY CONTROL3.4.1 Performance of Acceptance Checks and Tests3.4.1.1 Switchgear3.4.1.2 Gro
6、unding System3.4.2 Follow-Up Verification3.5 FIELD APPLIED PAINTING- End of Section Table of Contents -SECTION 26 13 01 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCEC / NASA UFGS-26 13 01 (August 2013)-Preparing Activit
7、y: NAVFAC NEWUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2013*SECTION 26 13 01PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR08/13*NOTE: This guide specification covers the requirements for air insulated, dead-front, enclosed and non-enclosed, dead-front p
8、ad-mounted switchgear. This guide specification is not intended for Navy installations and will be used when specified for Army and Air Force projects.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project
9、specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brac
10、kets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: Use the following related guide specifications for power distribution equipment:-Section 26 08 00 APPARATUS INSPECTION AND TESTING
11、-Section 26 11 16 SECONDARY UNIT SUBSTATIONS-Section 26 11 13.00 20 PRIMARY UNIT SUBSTATIONS-Section 26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS-Section 26 12 19.20 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS-Section 26 28 01.00 10 COORDINATED POWER SYSTEMS PROTECTION-Section 33 70 02.00 10 ELECTRICA
12、L DISTRIBUTION SYSTEM, UNDERGROUND-Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTIONSECTION 26 13 01 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Section 33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION*NOTE: Show the following infor
13、mation on the project drawings:1. Site Plan showing location, space available, and desired arrangement of switchgear.2. Single-line diagram showing: nominal system voltage; number and configuration of switched ways; type, number, and size of conductors for each circuit; and method of power cable ter
14、mination (600 ampere deadbreak connectors). Individually identify each switched way as load or fault interrupter and single-pole or three-pole tripping.3. Grounding Detail with ground rods, ground loop and interconnecting cables when interconnecting with other grounding systems or if multiple switch
15、es are provided.4. Special conditions, such as altitude, temperature and humidity, exposure to fumes, vapors, dust, and gases.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text
16、 by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference W
17、izards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification
18、to the extent referenced. The publications are referred to within the text by the basic designation only.SECTION 26 13 01 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM INTERNATIONAL (ASTM)ASTM A167 (1999; R 2009) Standard Specification f
19、or Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and StripASTM D1535 (2013) Specifying Color by the Munsell SystemINSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)IEEE 386 (2006; INT 1 2011) Standard for Separable Insulated Connector Systems for Power Distribution Systems A
20、bove 600VIEEE C2 (2012; Errata 2012; INT 1-4 2012; INT 5 2013) National Electrical Safety CodeIEEE C37.74 (2003; Int 1 2004) Standard Requirements for Subsurface, Vault, and Pad-Mounted Load-Interrupter Switchgear and Fused Load-Interrupter Switchgear for Alternating Current Systems Up to 38 kVIEEE
21、C57.12.28 (2005; INT 3 2011) Standard for Pad-Mounted Equipment - Enclosure IntegrityIEEE C57.12.29 (2005) Standard for Pad-Mounted Equipment - Enclosure Integrity for Coastal EnvironmentsIEEE C62.11 (2012) Standard for Metal-Oxide Surge Arresters for Alternating Current Power Circuits (1kV)INTERNAT
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS2613012013PADMOUNTEDDEADFRONTAIRINSULATEDSWITCHGEARPDF

链接地址:http://www.mydoc123.com/p-984823.html