1、*USACE / NAVFAC / AFCESA / NASA UFGS-26 13 00.00 20 (August 2011)-Preparing Activity: NAVFAC SupersedingUFGS-26 13 00.00 20 (April 2006) UFGS-16341N (February 2003)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2011*SECTION TABLE OF CONTENTSDIVISION 26 - ELEC
2、TRICALSECTION 26 13 00.00 20SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR08/11PART 1 GENERAL1.1 REFERENCES1.2 RELATED REQUIREMENTS1.3 DEFINITIONS1.3.1 Switched Way1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Switchgear Drawings1.5.2 Paint Coating System1.5.3 Electronic Overcurrent Control C
3、urves1.6 MAINTENANCE1.6.1 SF6/High-Firepoint Fluid Insulated Pad-mounted Switchgear Operation and Maintenance DataPART 2 PRODUCTS2.1 SF6/HIGH-FIREPOINT FLUID INSULATED PAD-MOUNTED SWITCHGEAR2.1.1 Ratings and Test Requirements2.1.2 Switchgear Construction2.1.2.1 Pad-mounting Provisions2.1.3 Load Inte
4、rrupting Switched Ways2.1.4 Fault Interrupting Switched Ways2.1.5 Automatic Switch Controls2.1.6 Low Voltage Test Pins2.1.7 Key Interlock2.1.8 Dead-Front High-Voltage Bushings2.2 Insulated High-Voltage Connectors2.3 Surge Arresters2.4 SF6 Refill Cylinders2.5 SOURCE QUALITY CONTROL2.5.1 Switchgear De
5、sign and Production TestsPART 3 EXECUTIONSECTION 26 13 00.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1 INSTALLATION3.2 GROUNDING3.2.1 Grounding Electrodes3.2.2 Switchgear Grounding3.2.3 Connections3.2.4 Grounding and Bonding Equipm
6、ent3.3 FOUNDATION FOR EQUIPMENT AND ASSEMBLIES3.4 FIELD QUALITY CONTROL3.4.1 Performance of Acceptance Checks and Tests3.4.1.1 Switchgear3.4.1.2 Grounding System3.4.2 Follow-Up Verification- End of Section Table of Contents -SECTION 26 13 00.00 20 Page 2Provided by IHSNot for ResaleNo reproduction o
7、r networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-26 13 00.00 20 (August 2011)-Preparing Activity: NAVFAC SupersedingUFGS-26 13 00.00 20 (April 2006) UFGS-16341N (February 2003)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated J
8、uly 2011*SECTION 26 13 00.00 20SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR08/11*NOTE: This guide specification covers the requirements for SF6 or high-firepoint biodegradable fluid insulated, dead-front, enclosed and non-enclosed, pad-mounted switchgear with load and fault interruptin
9、g switched ways, with maximum ratings of 600 amperes and 38 kV, 60 Hz.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requir
10、ements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide spe
11、cification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: This guide specification can be used for subsurface (vault) applications with appropriate modifications.Use the following related guide specifications for power distribution equipment:-Section 26 08 00 APPARATUS
12、 INSPECTION AND TESTING-Section 26 11 16 SECONDARY UNIT SUBSTATIONS-Section 26 11 13.00 20 PRIMARY UNIT SUBSTATION-Section 26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS-Section 26 12 19.20 SINGLE-PHASE PAD-MOUNTED TRANSFORMERSSECTION 26 13 00.00 20 Page 3Provided by IHSNot for ResaleNo reproducti
13、on or networking permitted without license from IHS-,-,-Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION-Section 33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION*NOTE: The following information shall be indicated on the project drawings:1. Site Plan showing location, space available, and de
14、sired arrangement of switchgear.2. Single-line diagram showing: nominal system voltage; number and configuration of switched ways; type, number, and size of conductors for each circuit; and method of power cable termination (600 ampere deadbreak connectors). Individually identify each switched way a
15、s load or fault interrupter and single-pole or three-pole tripping.3. Grounding Detail with ground rods, ground loop and interconnecting cables when interconnecting with other grounding systems or if multiple switches are provided.4. Special conditions, such as altitude, temperature and humidity, ex
16、posure to fumes, vapors, dust, and gases.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation,
17、 date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the t
18、ext will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the bas
19、ic designation only.SECTION 26 13 00.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM INTERNATIONAL (ASTM)ASTM A167 (1999; R 2009) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and StripAS
20、TM D 1535 (2008e1) Specifying Color by the Munsell SystemASTM D 2472 (2000; R 2006) Standard Specification for Sulphur HexafluorideASTM D6871 (2003; R 2008) Standard Specification for Natural (Vegetable Oil) Ester Fluids Used in Electrical ApparatusINSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (
21、IEEE)IEEE 386 (2006) Standard for Separable Insulated Connector Systems for Power Distribution Systems Above 600VIEEE C2 (2012) National Electrical Safety CodeIEEE C37.60 (2003; CORR 1 2004) Standard Requirements for Overhead, Pad Mounted, Dry Vault and Submersible Automatic Circuit Reclosers and Fa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS26130000202011SF6HIGHFIREPOINTFLUIDSINSULATEDPADMOUNTEDSWITCHGEARSF6 着火点 液体 绝缘 安装 衬垫 开关设备 PDF

链接地址:http://www.mydoc123.com/p-984822.html