NAVY UFGS-26 11 16-2010 SECONDARY UNIT SUBSTATIONS《辅助单位变电站》.pdf
《NAVY UFGS-26 11 16-2010 SECONDARY UNIT SUBSTATIONS《辅助单位变电站》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-26 11 16-2010 SECONDARY UNIT SUBSTATIONS《辅助单位变电站》.pdf(45页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-26 11 16 (February 2010)-Preparing Activity: NAVFAC Superseding UFGS-26 11 16 (April 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 26 - ELECTRICALSECTION 26 11 16SECONDARY UNI
2、T SUBSTATIONS02/10PART 1 GENERAL1.1 REFERENCES1.2 RELATED REQUIREMENTS1.3 DEFINITIONS1.4 SUBMITTALS1.4.1 Coordinated Submittal Reviews1.5 QUALITY ASSURANCE1.5.1 Drawing Requirements1.5.1.1 Unit Substation Drawings1.5.1.2 Transformer Drawings1.5.2 Paint Coating System1.5.3 Transformer Losses1.5.4 Sub
3、station Product Data1.5.5 Test Reports1.5.6 Regulatory Requirements1.5.7 Standard Products1.5.7.1 Alternative Qualifications1.5.7.2 Material and Equipment Manufacturing Date1.6 MAINTENANCE1.6.1 Assembled Operation and Maintenance Manuals1.6.2 Operation and Maintenance Data1.7 WARRANTYPART 2 PRODUCTS
4、2.1 PRODUCT COORDINATION2.2 SECONDARY UNIT SUBSTATION2.2.1 Incoming Sections2.2.1.1 Incoming Section Enclosure2.2.1.2 Cable Terminations2.2.1.3 Surge Arresters2.2.1.4 Load Interrupter Switch2.2.1.5 Primary Protective Device Connection2.2.2 Transformer (Liquid-Filled) Sections2.2.2.1 Transformer Rati
5、ngsSECTION 26 11 16 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.2.2 Transformer Accessories2.2.2.3 Specified Transformer Losses2.2.2.4 Insulating Liquid2.2.3 Transformer (Dry-Type) Sections2.2.3.1 Transformer Ratings2.2.3.2 Specified Tr
6、ansformer Losses2.2.4 Outgoing Section2.2.4.1 Outgoing Section Enclosure2.2.5 Watthour and Digital Meters2.2.5.1 Electronic Watthour Meter2.2.5.2 Electro-Mechanical Watthour Meters2.2.5.3 Digital Meters2.2.6 Instruments2.2.6.1 Ac Ammeters2.2.6.2 Ac Voltmeters2.2.6.3 Instrument Control Switches2.2.7
7、Current Transformers2.2.8 Control Power Transformers2.2.9 Meter Fusing2.2.10 Heaters2.2.11 Insulated Barriers2.2.12 Terminal Boards2.2.13 Wire Marking2.2.14 Grounding and Bonding2.2.15 Padlocks2.2.16 Cast-in-Place Concrete2.3 MANUFACTURERS NAMEPLATES2.4 FIELD FABRICATED NAMEPLATES2.5 WARNING SIGNS2.
8、6 SOURCE QUALITY CONTROL2.6.1 Equipment Test Schedule2.6.2 Load Interrupter Switch Production Tests2.6.3 Transformer Design Tests (Liquid-Filled)2.6.4 Transformer Routine and Other Tests (Liquid-Filled)2.6.5 Transformer Design Tests (Dry-Type)2.6.6 Transformer Routine and Other Tests (Dry-Type)PART
9、3 EXECUTION3.1 INSTALLATION3.2 GROUNDING3.2.1 Grounding Electrodes3.2.2 Substation Grounding3.2.3 Connections3.2.4 Grounding and Bonding Equipment3.3 INSTALLATION OF EQUIPMENT AND ASSEMBLIES3.3.1 Interrupter Switchgear3.3.2 Meters and Instrument Transformers3.3.3 Field Applied Painting3.3.4 Field Fa
10、bricated Nameplate Mounting3.3.5 Warning Sign Mounting3.3.6 Galvanizing Repair3.4 FOUNDATION FOR EQUIPMENT AND ASSEMBLIES3.4.1 Exterior Location3.4.2 Interior Location3.4.3 Cast-in-Place Concrete3.5 Padlocks3.6 FIELD QUALITY CONTROL3.6.1 Performance of Acceptance Checks and TestsSECTION 26 11 16 Pag
11、e 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.6.1.1 Interrupter Switchgear (Air Switches)3.6.1.2 Transformers (Liquid-Filled)3.6.1.3 Transformers - (Dry-Type)3.6.1.4 Current Transformers3.6.1.5 Metering and Instrumentation3.6.1.6 Grounding Sys
12、tem3.6.2 Protective Relays3.6.3 Pre-Energization Services3.6.4 Follow-Up Verification- End of Section Table of Contents -SECTION 26 11 16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-26 11 16 (February 20
13、10)-Preparing Activity: NAVFAC Superseding UFGS-26 11 16 (April 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 26 11 16SECONDARY UNIT SUBSTATIONS02/10*NOTE:1. This guide specification covers the requirements for three phase secondary unit
14、substations for step-down operation at primary voltages of 601 volts through 38 kilovolts, and secondary voltages, of 600 volts or less.2. When feasible, provide a separate liquid-filled pad-mounted transformer outside of the facility and a separately erected switchboard/switchgear assembly inside t
15、he respective facility in lieu of a secondary unit substation. For LANTNAVFACENGCOM projects, do not use secondary unit substations with secondary current greater than 5000 amperes.3. For LANTNAVFACENGCOM projects, where the available fault current is less than 12,000 amperes rms symmetrical, provid
16、e pad-mounted switchgear with a fault interrupting switch-way as the transformer primary protection device in lieu of a load interrupting switch. Clearly indicate requirements for identifying signage at switch-ways and at the transformer.USE THE FOLLOWING RELATED GUIDE SPECIFICATIONS FOR POWER DISTR
17、IBUTION EQUIPMENT:-Section 26 08 00 APPARATUS INSPECTION AND TESTING-Section 26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS-Section 26 12 19.20 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS-Section 26 11 14.00 10 MAIN ELECTRIC SUPPLY STATION AND SUBSTATION-Section 26 13 00.00 20 SF6 INSULATED PAD-MOUNTED
18、SWITCHGEAR-Section 26 11 13.00 20 PRIMARY UNIT SUBSTATIONS-Section 26 22 00.00 10 480-VOLT STATION SERVICE SWITCHGEAR AND TRANSFORMERSSECTION 26 11 16 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Section 26 23 00 SWITCHBOARDS AND SWITCHGEAR-
19、Section 26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS-Section 33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND-Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTIONEdit this guide specification for project specific requirements by adding, deleting, or revising text.
20、For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestion on this specification are welcome and should be directed to the technical proponent of
21、 the specification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*NOTE: This section utilizes the following energy cost and loss value tables.
22、Graphics/Tables files contain all graphics/tables for the specification. NOTE: TO DOWNLOAD UFGS GRAPHICSGo to http:/www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.Do not include list of tables, or tables themselves, in project specifications. Use tables to obtain values required in Part 2 of the specificati
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS2611162010SECONDARYUNITSUBSTATIONS 辅助 单位 变电站 PDF

链接地址:http://www.mydoc123.com/p-984819.html