NAVY UFGS-26 08 00-2008 APPARATUS INSPECTION AND TESTING《设备检验和测试》.pdf
《NAVY UFGS-26 08 00-2008 APPARATUS INSPECTION AND TESTING《设备检验和测试》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-26 08 00-2008 APPARATUS INSPECTION AND TESTING《设备检验和测试》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-26 08 00 (April 2006)-Preparing Activity: NAVFAC Superseding UFGS-26 08 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 26 - ELECTRICALSECTION 26 08 00APPARATUS INSPECTI
2、ON AND TESTING08/08PART 1 GENERAL1.1 REFERENCES1.2 RELATED REQUIREMENTS1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Qualifications1.4.2 Acceptance Tests and Inspections Reports1.4.3 Acceptance Test and Inspections ProcedurePART 2 PRODUCTSPART 3 EXECUTION3.1 ACCEPTANCE TESTS AND INSPECTIONS3.2 SYSTEM ACC
3、EPTANCE3.3 PLACING EQUIPMENT IN SERVICE- End of Section Table of Contents -SECTION 26 08 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-26 08 00 (April 2006)-Preparing Activity: NAVFAC Superseding UFGS-2
4、6 08 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 26 08 00APPARATUS INSPECTION AND TESTING08/08*NOTE: This guide specification covers the requirements for electrical inspection and testing.Edit this guide specification for projec
5、t specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specific
6、ation are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*NOTE: U
7、se this specification on project specifications where NETA testing is required.The following sections reference NETA for power distribution services and equipment.-Section 26 32 13.00 20 SINGLE OPERATION GENERATOR SETS-Section 26 12 19.20 THREE-PHASE PAD-MOUNTED TRANSFORMERS-Section 26 12 19.20 SING
8、LE-PHASE PAD-MOUNTED TRANSFORMERS-Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION-Section 33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION-Section 26 13 00.00 20 PAD-MOUNTED SF6 INSULATED SECTION 26 08 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without li
9、cense from IHS-,-,-INTERRUPTER-Section 26 11 16 SECONDARY UNIT SUBSTATIONS-Section 26 11 13.00 20 PRIMARY UNIT SUBSTATIONS-Section 26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES-Section 26 23 00 SWITCHBOARDS AND SWITCHGEARThis section shall also be used for specification sections containing low-voltage
10、or medium voltage generator control switchboards or switchgear, pad-mounted air switches, and medium voltage circuit breakers. Provide the section numbers and titles in this section, and add NETA testing requirements to the applicable section.Coordinate the sections in your contract documents with t
11、his list and with paragraph entitled “Acceptance Tests and Inspection“ in PART 3 of this specification.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation o
12、nly and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference
13、feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent reference
14、d. The publications are referred to within the text by the basic designation only.INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)NETA ATS (2003) Acceptance Testing Specifications1.2 RELATED REQUIREMENTSSection 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS applies to this section with add
15、itions and modifications specified herein.SECTION 26 08 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list t
16、o reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G
17、” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters wi
18、thin the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “A
19、O“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government ap
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS2608002008APPARATUSINSPECTIONANDTESTING 设备 检验 测试 PDF

链接地址:http://www.mydoc123.com/p-984818.html