NAVY UFGS-23 84 16 00 20-2008 DESICCANT DEHUMIDIFICATION EQUIPMENT《干燥剂除湿设备》.pdf
《NAVY UFGS-23 84 16 00 20-2008 DESICCANT DEHUMIDIFICATION EQUIPMENT《干燥剂除湿设备》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-23 84 16 00 20-2008 DESICCANT DEHUMIDIFICATION EQUIPMENT《干燥剂除湿设备》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 84 16.00 20 (November 2008)-Preparing Activity: NAVFAC SupersedingeUFGS-23 84 16.00 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND
2、AIR CONDITIONINGSECTION 23 84 16.00 20DESICCANT DEHUMIDIFICATION EQUIPMENT11/08PART 1 GENERAL1.1 REFERENCES1.2 RELATED REQUIREMENTS1.3 SUBMITTALSPART 2 PRODUCTS2.1 DESICCANT DEHUMIDIFICATION UNIT2.1.1 Air Handling Components2.1.2 Hot Water Heater2.1.3 Sensible Heat Recovery Devices2.1.3.1 Rotary Whe
3、el2.1.3.2 Heat Pipe2.1.4 Desiccant Wheel2.1.5 Evaporative ChillerPART 3 EXECUTION3.1 PREPARATION3.2 INSTALLATION3.3 FIELD QUALITY CONTROL3.3.1 Preliminary Tests3.3.2 Testing and Balancing3.4 FIELD TRAINING- End of Section Table of Contents -SECTION 23 84 16.00 20 Page 1Provided by IHSNot for ResaleN
4、o reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 84 16.00 20 (November 2008)-Preparing Activity: NAVFAC SupersedingeUFGS-23 84 16.00 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 20
5、08*SECTION 23 84 16.00 20DESICCANT DEHUMIDIFICATION EQUIPMENT11/08*NOTE: This guide specification covers the requirements for natural gas or waste heat fired rotary wheel type dehumidifier utilizing an adsorbing material for a desiccant.Edit this guide specification for project specific requirements
6、 by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and s
7、hould be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*NOTE: Desiccant dehumidifiers
8、are delivered from the manufacturer as a complete air handling unit consisting of the casing, fan, sensible heat recovery device and a desiccant wheel. The unit may or may not also include heating and/or cooling coils, evaporative cooling pad, etc. This guide specification covers all components that
9、 may make up a complete desiccant dehumidification unit.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the SECTION 23 84 16.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-publications cited in the text of the guide sp
10、ecification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the ref
11、erence in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The pub
12、lications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)ASHRAE 15 (2007; Errata 2007) Safety Code for Refrigerat
13、ionASHRAE 84 (2008) Method of Testing Air-to-Air Heat ExchangersNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2007; AMD 1 2008) National Electrical Code - 2008 EditionNFPA 90A (2008) Standard for the Installation of Air Conditioning and Ventilating Systems1.2 RELATED REQUIREMENTSSection 15050,
14、 “Basic Mechanical Materials and Methods, applies to this section with the addition and modifications specified herein.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for t
15、he project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and c
16、an be reviewed through the Contractors SECTION 23 84 16.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals
17、requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for Dist
18、rict Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and
19、NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designatio
20、n identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product Data*Note: Indicate sound ratings or loudness level of equipment in the Equipment Schedule on the drawings.*Desiccant Deh
21、umidification UnitSD-06 Test ReportsFilter sectionsPreliminary testsDampers leakage testSD-07 CertificatesDesiccant dehumidification unitSD-10 Operation and Maintenance DataDesiccant dehumidification unit, Data Package 5Submit in accordance with Section 01 78 23 OPERATION MAINTENANCE DATA.SECTION 23
22、 84 16.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 2 PRODUCTS2.1 DESICCANT DEHUMIDIFICATION UNIT2.1.1 Air Handling ComponentsAll air handling components of the desiccant dehumidification unit (casing, dampers, fans vibration isol
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS23841600202008DESICCANTDEHUMIDIFICATIONEQUIPMENT 干燥剂 除湿 设备 PDF

链接地址:http://www.mydoc123.com/p-984817.html