1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 81 23.00 20 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-23 81 23.00 20 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR
2、CONDITIONINGSECTION 23 81 23.00 20COMPUTER ROOM AIR CONDITIONING UNITS02/10PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 OZONE DEPLETION FACTOR1.5 ENVIRONMENTAL REQUIREMENTS1.6 SUSTAINABLE DESIGN REQUIREMENTS1.6.1 Local/Regional Materials1.6.2 Environmental DataPART 2 PRODUCTS2
3、.1 COMPUTER ROOM AIR CONDITIONING UNITS (CRACU)2.1.1 Cabinet and Frame2.1.1.1 Unit Cabinet2.1.1.2 Cabinet Interiors Sound Attenuation2.1.2 Fan Section2.1.3 Cooling Coil2.1.4 Filters2.1.5 Reheat Coil2.1.6 Humidifier2.1.7 Refrigeration System2.1.7.1 Compressors2.1.7.2 Refrigerant Tubing2.1.8 Condenser
4、2.1.8.1 Air-cooled Condenser2.1.8.2 Liquid-cooled Condenser2.1.8.3 Dry Coolers2.1.9 Space Temperature Control System2.1.10 Alarm Panel System2.1.11 Air Return and Delivery Orientation2.1.12 Floorstand2.2 Corrosion Protection For Coastal Installations2.2.1 Polyelastomer Finish Coating System2.2.1.1 H
5、eat Exchanger Coil (Including Evaporator Coil) SurfacesSECTION 23 81 23.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.1.2 Uninsulated Interior Surfaces and Exterior Surfaces2.2.1.3 Insulated Interior Surfaces2.2.2 Phenolic Finish Co
6、ating System2.2.2.1 Heat Exchanger Coil (Including Evaporator Coil) Surfaces2.2.2.2 Uninsulated Interior Surfaces and Exterior Surfaces2.2.2.3 Insulated Interior Surfaces2.3 ELECTRICAL2.3.1 Electrical Motors, Controllers, Contactors, and Disconnects2.3.2 Electrical Control Wiring2.4 HVAC WATER PIPIN
7、G AND METAL DUCTWORK2.5 FIRE PROTECTION DEVICES2.6 SOURCE QUALITY CONTROL2.6.1 Manufacturers Factory Test Plans2.6.1.1 Test Procedure2.6.1.2 Performance Variables2.6.1.3 Test Configuration2.6.1.4 Tested Variables2.6.1.5 Thermal Testing2.6.1.6 Specialized Components2.6.1.7 Factory Test For Sound Pres
8、sure Level2.6.1.8 Factory Tests Reporting Forms2.6.2 CRACU Production Schedule and Factory Test Schedule2.6.3 Factory Tests2.6.4 Deficiency Resolution2.6.5 Factory Test ReportsPART 3 EXECUTION3.1 INSTALLATION3.1.1 CRACU System3.1.2 Installation Instructions3.1.3 Connections to Existing Systems3.2 FI
9、ELD QUALITY CONTROL3.3 FIELD TESTING3.3.1 Manufacturers Field Test Plans3.3.1.1 Coordinated Testing3.3.1.2 Prerequisite Testing3.3.1.3 Test Procedure3.3.1.4 Performance Variables3.3.1.5 Test Configuration3.3.1.6 Tested Variables3.3.1.7 Thermal Testing3.3.1.8 Specialized Components3.3.1.9 Field Test
10、Reporting Forms3.3.2 Field Test Schedule3.3.3 Manufacturers Test Representative3.3.4 Field Tests3.3.5 Deficiency Resolution3.3.6 Field Test Reports3.4 WASTE MANAGEMENT- End of Section Table of Contents -SECTION 23 81 23.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted
11、 without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 81 23.00 20 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-23 81 23.00 20 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 23 81 23.00 20COMPUTER ROOM AIR
12、 CONDITIONING UNITS02/10*NOTE: This guide specification covers the requirements for heating, ventilating, and cooling (HVAC) equipment for computer room air conditioning Units (CRACUs).Edit this guide specification for project specific requirements by adding, deleting, or revising text. For brackete
13、d items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the
14、specification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*NOTE: Equipment includes cooling equipment less than211 KW 720,000 Btuh, and heati
15、ng equipment less than117 KW 400,000 Btuh.Use the most efficient, competitively available CRACU for which there are at least two products available for the indicated ranges of comparability. Design parameters for each item of equipment shall be indicated on the drawings including capacity, efficienc
16、y, sound ratings, motor speeds, electrical characteristics, and special features.System requirements must conform to UFC 3-410-02N, “Heating, Ventilating, Air Conditioning and Dehumidifying Systems“.SECTION 23 81 23.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted wit
17、hout license from IHS-,-,-*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and titl
18、e.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automa
19、tically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation
20、only.AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)AHRI 410 (2001; Addendum 2002) Forced-Circulation Air-Cooling and Air-Heating CoilsAMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)ANSI/ASHRAE 15 Std 15 Errata 2007, 2009, Std 34 Errata 2007, 2008, Add
21、enda a-v, x-ae) ANSI/ASHRAE Standard 15-Safety Standard for Refrigeration Systems and ANSI/ASHRAE Standard 34-Designation and Safety Classification of RefrigerantsASHRAE 52.2 (2007; Addenda B 2008; Errata 2009) Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Part
22、icle SizeASHRAE 55 (2004; Errata 2007; Addendum a, b Addenda a, b, e, f and h 2008; Errata 2009) Ventilation for Acceptable Indoor Air QualitySECTION 23 81 23.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASHRAE 90.1 - IP (2007; Supplem
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS23812300202010COMPUTERROOMAIRCONDITIONINGUNITS 计算机 机房 空气调节 装置 PDF

链接地址:http://www.mydoc123.com/p-984814.html