NAVY UFGS-23 35 19 00 20-2010 INDUSTRIAL VENTILATION AND EXHAUST《工业通风和排气》.pdf
《NAVY UFGS-23 35 19 00 20-2010 INDUSTRIAL VENTILATION AND EXHAUST《工业通风和排气》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-23 35 19 00 20-2010 INDUSTRIAL VENTILATION AND EXHAUST《工业通风和排气》.pdf(51页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 35 19.00 20 (February 2010)-Preparing Activity: NAVFAC Superseding UFGS-23 35 19.00 20 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR
2、 CONDITIONINGSECTION 23 35 19.00 20INDUSTRIAL VENTILATION AND EXHAUST02/10PART 1 GENERAL1.1 REFERENCES1.2 GENERAL REQUIREMENTS1.2.1 SMACNA Duct Construction Manuals1.2.2 Fan Data1.2.3 Natural Ventilation1.2.4 Industrial Ventilation and Exhaust Systems1.2.5 Start-Up Tests1.2.6 Related Requirements1.3
3、 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Welders Identification1.4.2 Fiberglass Fan Servicer Experience Information1.4.3 Qualified Personnel1.4.4 Qualification of Welders1.4.5 TAB Requirements1.5 ENVIRONMENTAL REQUIREMENTS1.6 POSTED OPERATING INSTRUCTIONS1.7 SAFETY PRECAUTIONS1.7.1 Guards and Screens1.
4、7.2 Welding1.8 SUSTAINABLE DESIGN REQUIREMENTS1.8.1 Local/Regional MaterialsPART 2 PRODUCTS2.1 FANS, GENERAL REQUIREMENTS FOR2.1.1 General Performance, Component, and Other Requirements2.1.2 Bearings and Lubrication2.1.2.1 Anti-friction Bearings2.1.2.2 Sleeve Bearings2.1.3 Motors and Motor Starters2
5、.1.4 Guards and Screens2.1.5 Power Transmission Components2.1.5.1 Fan DrivesSECTION 23 35 19.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.5.2 Sheaves2.1.6 Special Construction for Hazardous Areas2.1.6.1 Spark-Resistant2.1.6.2 Explo
6、sion Proof2.1.7 Protective Coating for Fans2.2 CENTRIFUGAL FANS2.2.1 General Requirements for Centrifugal Fans2.2.2 Industrial Exhausters2.2.3 Utility Sets2.2.4 In-line Centrifugal Fans2.2.5 Fiberglass Centrifugal Fans2.3 VANEAXIAL TUBEAXIAL FANS2.3.1 Fan Impeller Blades2.3.2 Fan Casings2.4 BATHROOM
7、 AND KITCHEN FANS2.5 BASIC MATERIALS2.5.1 Coated and Uncoated Carbon Steel Sheets, Plates, and Shapes2.5.1.1 Mill Galvanized Steel Sheet2.5.1.2 Mill Galvanized Steel Shapes2.5.1.3 Uncoated (Black) Carbon Steel Sheet2.5.1.4 Uncoated (Black) Carbon Steel Plates and Shapes2.5.2 Corrosion Resistant (Sta
8、inless) Steel2.5.3 Corrosion Protection2.6 HEAT RECOVERY SYSTEMS2.6.1 Unit Casing2.6.2 Heat Exchanger Section2.6.2.1 Enthalpy Wheel2.6.2.2 Heat Pipe2.6.2.3 Run-around Coil2.6.2.4 Sensible Heat Recovery Unit2.6.3 Defrost Control Damper Section2.6.4 Angle Filter Box2.7 FIRE DAMPERS2.8 MISCELLANEOUS MA
9、TERIALS2.8.1 Filler Metal, Welding2.8.2 Flashing Materials2.8.3 Flexible Connectors2.8.3.1 General Service2.8.3.2 Acoustic Service2.8.3.3 Fume Dust Collection Service2.8.3.4 High Temperature Service2.8.4 Flexible Duct2.8.4.1 Metallic Type2.8.4.2 Wire Reinforced Fabric Type2.8.4.3 Ball Joints2.8.4.4
10、Slip Joints2.8.5 Gaskets2.8.5.1 Elastomer Buna N2.8.5.2 Elastomer Chloroprene2.8.5.3 Rubber2.8.6 Protective Coating Materials2.8.6.1 Baked Unmodified Phenolic2.8.6.2 Epoxy Coating2.8.6.3 Inorganic Zinc Coating2.8.6.4 Galvanizing Repair Paint2.8.7 Sealants2.8.7.1 Elastomeric2.8.7.2 Heat Shrinking ove
11、r Round Exterior Duct2.8.7.3 Hard Cast Caulking for Exterior DuctsSECTION 23 35 19.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.8.7.4 Caulking of Building Surface Penetration2.9 SPECIALTIES2.9.1 Access Ports, Test2.9.2 Damper Regulat
12、ors2.9.3 Blast Gates2.9.4 Cast Iron Access Door2.10 SUPPORTS AND HANGERS2.10.1 General Requirements for Supporting Elements2.10.2 Vertical Attachments2.10.3 Horizontal Attachments2.10.4 Supplementary Steel2.10.5 Vibration Isolators2.11 DUCTWORK, DUST AND FUME COLLECTION2.11.1 General Requirements fo
13、r Dust and Fume Collection Ductwork2.11.2 Fabrication of Dust and Fume Collection Ductwork2.11.3 Radius Elbows2.11.4 Flanged Joints2.11.5 Access Doors2.11.6 Flexible Connectors2.12 PROTECTIVELY COATED STEEL DUCTS2.12.1 General Requirements for Protectively Coated Steel Ductwork2.12.2 Protective Coat
14、ing2.12.3 Fabrication of Protectively Coated Ductwork2.12.4 Radius Elbows2.12.5 Flanged Joints2.12.6 Access and Cleanout Door Openings2.13 THERMOPLASTIC DUCTWORK2.13.1 Ductwork2.13.2 Product Requirements2.13.3 Basic Ductwork Materials2.13.4 Fasteners2.13.5 Joint Gaskets2.13.6 Fabrication2.13.6.1 Fla
15、nges2.13.6.2 Access Plates2.14 FIBERGLASS DUCTWORK2.14.1 Fiberglass Ductwork2.14.2 Basic Ductwork Materials2.14.3 Fasteners2.14.4 Joint Gaskets2.14.5 Fabrication2.14.5.1 Flanges2.14.5.2 Access Plates2.15 VEHICLE TAIL PIPE EXHAUST SYSTEM2.15.1 General Requirements for Vehicle Tail Pipe Exhaust System
16、2.15.2 Ductwork2.15.2.1 Suction Side Ductwork2.15.2.2 Discharge Side Ductwork2.15.3 Fan2.15.4 Flexible Tail Pipe Exhaust Tubing and Connectors2.15.5 Supporting Elements2.16 WELDING FUME EXHAUST SYSTEM2.16.1 General Requirements for Welding Fume Exhaust System2.16.2 Ductwork2.16.2.1 Suction Side Duct
17、work2.16.2.2 Discharge Side Ductwork2.16.3 Fan2.16.4 Flexible Welding Fume Exhaust Tubing and Connectors2.16.5 Supporting ElementsSECTION 23 35 19.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.17 STACKHEADSPART 3 EXECUTION3.1 INSTALLA
18、TION3.1.1 Installation Requirements3.1.1.1 Wood Facilities3.1.1.2 Aluminum Facilities3.1.2 Electrical Ground Continuity3.1.3 Special Installation Requirements3.1.4 Special Requirements for Installation of Thermoplastic Ductwork3.1.4.1 Slope3.1.4.2 Drains3.1.4.3 Duct Supports3.1.5 Special Requirement
19、s for Installation of Fiberglass Ductwork3.1.5.1 Slope3.1.5.2 Drains3.1.5.3 Duct Supports3.1.6 Miscellaneous Sheet Metal Work3.1.7 Building Penetrations3.1.7.1 General Penetration Requirements3.1.7.2 Framed Opening3.1.7.3 Clearances3.1.7.4 Tightness3.1.7.5 Sealants3.1.7.6 Closure Collars3.1.8 Instal
20、lation of Fire Dampers3.1.9 Installation of Flexible Connectors3.1.10 Installation of Supports3.1.10.1 Selection3.1.10.2 General Requirement for Supports3.1.10.3 Methods of Attachment3.1.11 Welding3.1.12 Test Ports3.1.13 Ductwork Cleaning3.1.14 Protective Coating Work3.1.14.1 General Requirements fo
21、r Protective Coating Work3.1.14.2 Baked, Unmodified Phenolic System3.1.14.3 Inorganic Zinc Coating System3.1.14.4 Field Inspection of Protective Coating Work3.1.15 Factory and Field Painting and Finishing3.1.15.1 Factory Work3.1.15.2 Field Work3.2 TESTING, ADJUSTING, AND BALANCING3.2.1 Ductwork Stru
22、ctural Integrity and Leakage Testing3.2.2 Power Transmission Components Adjustment3.2.3 Preliminary Tests3.2.4 Testing, Adjusting, and Balancing Work3.2.5 Systems Volume Acceptance Criteria3.2.6 Sound Level Tests3.3 SYSTEMS OPERATION DEMONSTRATION3.4 WASTE MANAGEMENT3.5 SCHEDULE- End of Section Tabl
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS23351900202010INDUSTRIALVENTILATIONANDEXHAUST 工业 通风 排气 PDF

链接地址:http://www.mydoc123.com/p-984801.html