NAVY UFGS-23 05 93-2009 TESTING ADJUSTING AND BALANCING FOR HVAC《HVAC的测试 调整和平衡》.pdf
《NAVY UFGS-23 05 93-2009 TESTING ADJUSTING AND BALANCING FOR HVAC《HVAC的测试 调整和平衡》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-23 05 93-2009 TESTING ADJUSTING AND BALANCING FOR HVAC《HVAC的测试 调整和平衡》.pdf(61页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 05 93 (August 2009)-Preparing Activity: NAVFAC SupersedingUFGS-23 05 93 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONIN
2、GSECTION 23 05 93TESTING, ADJUSTING, AND BALANCING FOR HVAC08/09PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.2.1 Similar Terms1.3 WORK DESCRIPTION1.3.1 Air Distribution Systems1.3.2 Water Distribution Systems1.3.3 TAB SCHEMATIC DRAWINGS1.3.4 Related Requirements1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5
3、.1 Independent Tab Agency and Personnel Qualifications1.5.2 Tab Standard1.5.3 Sustainability1.5.4 Qualifications1.5.4.1 TAB Firm1.5.4.2 TAB Specialist1.5.4.3 TAB Specialist Responsibilities1.5.4.4 Tab Related HVAC Submittals1.5.5 Responsibilities1.5.5.1 Contractor1.5.5.2 TAB Agency1.5.5.3 TAB Team S
4、upervisor1.5.5.4 TAB Team Field Leader1.5.6 Test Reports1.5.6.1 Data from DALT Field Work1.5.6.2 Certified TAB Reports1.6 PROJECT/SITE CONDITIONS1.6.1 DALT and TAB Services to Obtain Existing Conditions1.7 SEQUENCING AND SCHEDULING1.7.1 DALT and TAB Submittal and Work Schedule1.7.2 Projects with Pha
5、sed Construction1.7.2.1 Phasing of Work1.7.3 DALT and TAB Submittal and Work Schedule1.7.3.1 Design Review ReportSECTION 23 05 93 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.7.3.2 Pre-Field DALT Preliminary Notification1.7.3.3 Pre-Field T
6、AB Engineering Report1.8 SUBCONTRACTOR SPECIAL REQUIREMENTS1.9 WARRANTYPART 2 PRODUCTSPART 3 EXECUTION3.1 WORK DESCRIPTIONS OF PARTICIPANTS3.2 PRE-DALT/TAB MEETING3.3 DALT PROCEDURES3.3.1 Instruments, Consumables and Personnel3.3.2 Advance Notice of Pre-Final DALT Field Work3.3.3 Ductwork To Be DALT
7、d3.3.4 DALT Testing3.3.5 Pre-final DALT Report3.3.6 Quality Assurance - COTR DALT Field Acceptance Testing3.3.7 Additional COTR Field Acceptance Testing3.3.8 Certified Final DALT Report3.3.9 Prerequisite for TAB Field Work3.4 TAB PROCEDURES3.4.1 TAB Field Work3.4.2 Preliminary Procedures3.4.3 TAB Ai
8、r Distribution Systems3.4.3.1 Units With Coils3.4.3.2 Air Handling Units3.4.3.3 Rooftop Air Conditioning3.4.3.4 Heating and Ventilating Units3.4.3.5 Makeup Air Units3.4.3.6 Return Air Fans3.4.3.7 Fan Coils3.4.3.8 Exhaust Fans3.4.3.9 Cabinet Heaters3.4.3.10 Cooling Units3.4.3.11 Door Heaters3.4.3.12
9、Unit Heaters3.4.4 TAB Water Distribution Systems3.4.4.1 Chilled Water3.4.4.2 Heating Hot Water3.4.4.3 Dual Temperature Water3.4.5 Sound Measurement Work3.4.5.1 Areas To Be Sound Measured3.4.5.2 Procedure3.4.5.3 Timing3.4.5.4 Meters3.4.5.5 Calibration3.4.5.6 Background Noise Correction3.4.6 TAB Work
10、on Performance Tests Without Seasonal Limitations3.4.6.1 Performance Tests3.4.6.2 Ambient Temperatures3.4.6.3 Sound Measurements3.4.6.4 Water Chillers3.4.6.5 Refrigeration Units3.4.6.6 Coils3.4.7 TAB Work on Performance Tests With Seasonal Limitations3.4.7.1 Performance Tests3.4.7.2 Season Of Maximu
11、m LoadSECTION 23 05 93 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.7.3 Ambient Temperatures3.4.7.4 Sound Measurements3.4.7.5 Water Chillers3.4.7.6 Refrigeration Units3.4.7.7 Coils3.4.8 Workmanship3.4.9 Deficiencies3.4.10 TAB Reports3.4.
12、11 Quality Assurance - COTR TAB Field Acceptance Testing3.4.11.1 TAB Field Acceptance Testing3.4.11.2 Additional COTR TAB Field Acceptance Testing3.4.11.3 Prerequisite for Approval3.5 MARKING OF SETTINGS3.6 MARKING OF TEST PORTS3.7 APPENDICES- End of Section Table of Contents -SECTION 23 05 93 Page
13、3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 05 93 (August 2009)-Preparing Activity: NAVFAC SupersedingUFGS-23 05 93 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UM
14、RL dated July 2009*SECTION 23 05 93TESTING, ADJUSTING, AND BALANCING FOR HVAC08/09*NOTE: This guide specification covers the requirements for testing, adjusting, and balancing (TAB) of heating, ventilating, and air-conditioning (HVAC) air and water distribution systems.Edit this guide specification
15、for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guid
16、e specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR
17、).This guide specification includes tailoring options for NASA, NAVFAC, and USACE. Selection or deselection of a tailoring option will include or exclude that option in the section, but editing the resulting section to fit the project is still required.*NOTE: Show the following information on the pr
18、oject drawings:1. A unique number or mark for each piece of equipment or terminal.2. Air quantities at air terminals.3. Air quantities and temperatures in air handling SECTION 23 05 93 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-unit schedu
19、les.4. Water quantities and temperatures in thermal energy transfer equipment schedules.5. Water quantities and heads in pump schedules.6. Water flow measurement fittings and balancing fittings.7. Ductwork Construction and Leakage Testing Table that defines the DALT test requirements, including each
20、 applicable HVAC duct system ID or mark, duct pressure class, duct seal class, and duct leakage test pressure. This table is included in the file for Graphics for Unified Facilities Guide Specifications: http:/www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf at the end of this section as Appendix D REQUIREMEN
21、TS FOR DUCT AIR LEAK TESTING.8. When applicable, provide notes on the drawings specifying and completely describing any special or out of the ordinary TAB work to be performed. If required, provide special coordinating paragraphs in this section to compliment the special TAB notes on the design draw
22、ings.*PART 1 GENERAL*NOTE: Use this specification for all projects which include new HVAC systems or modifications to existing HVAC systems.The “Design Agents Representative“ must be a member of the HVAC design team, from the AE or Engineering Division and must actively participate in the process, i
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS2305932009TESTINGADJUSTINGANDBALANCINGFORHVACHVAC 测试 调整 平衡 PDF

链接地址:http://www.mydoc123.com/p-984797.html