NAVY UFGS-21 13 13 00 20-2008 WET PIPE SPRINKLER SYSTEM FIRE PROTECTION《消防用湿式喷水系统》.pdf
《NAVY UFGS-21 13 13 00 20-2008 WET PIPE SPRINKLER SYSTEM FIRE PROTECTION《消防用湿式喷水系统》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-21 13 13 00 20-2008 WET PIPE SPRINKLER SYSTEM FIRE PROTECTION《消防用湿式喷水系统》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-21 13 13.00 20 (April 2008)-Preparing Activity: NAVFAC SupersedingUFGS-21 13 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated 01 March 2008*SECTION TABLE OF CONTENTSDIVISION 21 - FIRE SUPPRESSIONSECTION 21 1
2、3 13.00 20WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION04/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SPRINKLER SYSTEM DESIGN1.3.1 Location of Sprinklers1.3.2 Water Distribution1.3.3 Density of Application of Water1.3.4 Sprinkler Discharge Area1.3.5 Outside Hose Allowances1.3.6 Water Supply
3、1.4 SUBMITTALS1.5 QUALIFICATIONS1.5.1 Fire Protection Engineer1.5.2 Sprinkler System Installer1.6 QUALITY ASSURANCE1.6.1 Material and Equipment Qualifications1.6.2 Alternative Qualifications1.6.3 Manufacturers Nameplate1.6.4 Field Fabricated Nameplates1.7 ACCESSIBILITY1.8 DELIVERY, STORAGE AND HANDL
4、INGPART 2 PRODUCTS2.1 UNDERGROUND PIPING COMPONENTS2.1.1 Pipe2.1.2 Gate Valve and Indicator Posts2.1.3 Valve Boxes2.1.4 Buried Utility Warning and Identification Tape2.2 ABOVEGROUND PIPING COMPONENTS2.2.1 Steel Pipe2.2.2 Grooved Mechanical Joints and FittingsSECTION 21 13 13.00 20 Page 1Provided by
5、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.3 Flexible Sprinkler Hose2.2.4 Plastic Pipe and Fittings2.2.5 Sprinklers2.2.6 Valves2.2.7 Pipe Supports2.2.8 Alarm Valves2.2.9 Water Motor Alarms2.2.10 Fire Department Connections2.2.11 Backflow Prevention Asse
6、mbly2.2.12 Excess Pressure Pump2.3 ALARM INITIATING AND SUPERVISORY DEVICES2.3.1 Sprinkler Alarm Switches2.3.2 Valve Supervisory (Tamper) Switch2.4 ACCESSORIES2.4.1 Sprinkler Cabinet2.4.2 Pipe EscutcheonPART 3 EXECUTION3.1 INSPECTION BY FIRE PROTECTION ENGINEER3.2 UNDERGROUND PIPING INSTALLATION3.3
7、ABOVEGROUND PIPING INSTALLATION3.3.1 Piping in Finished Areas3.3.2 Pendent Sprinklers3.3.3 Pipe Joints3.3.4 Reducers3.3.5 Pipe Penetrations3.3.6 Inspectors Test Connection3.3.7 Backflow Preventer Test Connection3.3.8 Drains3.3.9 Installation of Fire Department Connection3.3.10 Identification Signs3.
8、4 ELECTRICAL WORK3.5 PIPE PAINTING AND COLOR CODE MARKING3.6 PRELIMINARY TESTS3.6.1 Underground Piping3.6.1.1 Flushing3.6.1.2 Hydrostatic Testing3.6.2 Aboveground Piping3.6.2.1 Hydrostatic Testing3.6.2.2 Backflow Prevention Assembly Forward Flow Test3.7 FINAL ACCEPTANCE TEST3.8 ON-SITE TRAINING- End
9、 of Section Table of Contents -SECTION 21 13 13.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-21 13 13.00 20 (April 2008)-Preparing Activity: NAVFAC SupersedingUFGS-21 13 00.00 20 (April 2006) UNIFIE
10、D FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated 01 March 2008*SECTION 21 13 13.00 20WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION04/08*NOTE: This guide specification covers the requirements for wet pipe fire protection sprinkler systems.Comments and suggestions on this guid
11、e specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR
12、).Use of electronic communication is encouraged.Brackets are used in the text to indicate designer choices or locations where text must be supplied by the designer.*PART 1 GENERAL*NOTE: The Designer will edit this section for either a performance-designed system or a fully designed system as applica
13、ble.This section is primarily intended for performance designed systems, i.e., systems where the size, layout, and support of branch lines and cross mains, and the layout of sprinklers will be designed by the Contractor.The Designer will provide the following information in the contract documents fo
14、r performance designed systems. This information will be in accordance with UFC 3-600-01. For NAVFAC projects, also SECTION 21 13 13.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-include requirements of UFC 3-600-10N.(1) Show the layout
15、 and size of all piping and equipment from the point of connection to the water supply, to the sprinkler cross mains. The contract drawings must include a detailed sprinkler riser diagram. (2) Show location and size of service mains, interior feed mains, control valves, sprinkler risers, drain lines
16、, sectional valves, and inspectors test valves and switches on the drawings.(3) Specify waterflow data including hydrant flow results, including the location where the hydrant flow test was conducted, the location and size of existing mains and new water supply lines that will serve the sprinkler sy
17、stem (including all supervisory valves), and the location and size of all risers.(4) Highlight or clearly indicate the area(s) to be protected by sprinklers on the drawings.(5) Specify waterflow requirements including the design density, design area, the hose stream demand (including location of the
18、 hose stream demand), the duration of supply, and sprinkler spacing and area of coverage in this section.(6) Show the location of the backflow preventer (including provisions for a drain and access for maintenance) where the potable water supply system is at risk of contamination by the sprinkler sy
19、stem on the drawings.(7) Show all provisions necessary for forward flow testing of the backflow preventer at system demand, as required by NFPA 13 on the drawings. Indicate location of all components and required items, including test ports, for pressure measurements both upstream and downstream of
20、the backflow preventer, a drain to the building exterior, and appropriate, permanent means of disposing of the large quantity of water that will be involved in the initial test and subsequent annual tests.(8) Highlight all concealed spaces on the drawings that require sprinkler protection, such as s
21、paces above suspended ceilings that are built of combustible material or that can contain combustible materials, such as storage, and communication cabling that is not fire-rated.(9) Provide details on the drawings of pipe restraints for underground piping. This includes details of pipe clamps, tie
22、rods, mechanical retainer glands, and thrust blocks. Include size of wall or floor sleeve if required to meet earthquake SECTION 21 13 13.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-requirements. When connecting to an existing water d
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS21131300202008WETPIPESPRINKLERSYSTEMFIREPROTECTION 消防 用湿式 喷水 系统 PDF

链接地址:http://www.mydoc123.com/p-984784.html