1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 85 00.00 20 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-02 85 00.00 20 (November 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 8
2、5 00.00 20MOLD REMEDIATION05/11PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.2.1 AIHA1.2.2 AFU1.2.3 Categories of Water1.2.4 Certified Industrial Hygienist (CIH)1.2.5 Complete Interior Building Demolition (Complete Gut)1.2.6 Containment1.2.6.1 Source Containment1.2.6.2 Limited Containment1.2.6.3 Full
3、 Containment1.2.6.4 Unoccupied Building Containment1.2.6.5 Cleaning Containment1.2.7 Decontamination Unit (Airlock)1.2.8 Dehumidifier1.2.9 Detergent1.2.10 Disinfectants or Biocide Sanitizing Solutions1.2.11 EPA1.2.12 Fungicidal Agents, (EPA)1.2.13 HEPA Filter1.2.14 HVAC1.2.15 Industrial Hygienist (I
4、H)1.2.16 Microbial Remediation Supervisor1.2.17 Non-Porous Material1.2.18 Occupied Spaces (Areas)1.2.19 Personal Protective Equipment (PPE)1.2.20 Poly1.2.21 Porous Material1.2.22 Pressure Differential Measuring Instrument1.2.23 Semi-porous Material1.2.24 Ventilation System Mold Remediator Qualificat
5、ions (VSMR)1.2.25 Work Area1.3 REQUIREMENTS1.3.1 Description of Work1.3.2 Security RequirementsSECTION 02 85 00.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.4 SUBMITTALS1.4.1 Preconstruction Submittals1.4.1.1 Preliminary Visual Asses
6、sment Report1.4.1.2 Microbial Remediation Plan1.4.1.3 Respiratory Protection Program1.4.1.4 Worker Records1.4.1.5 Certified Industrial Hygienist (CIH)/Industrial Hygienist (IH) Qualifications1.4.1.6 Microbial Remediation Supervisor Qualifications1.4.2 Product Data1.4.3 Daily Reports1.4.4 Submittals
7、at Completion of Remediation Work1.5 RECORD KEEPING1.5.1 Daily LogPART 2 PRODUCTS2.1 DISINFECTANTS, BIOCIDES, SANITIZING SOLUTIONS AND FUNGICIDAL AGENTS, (EPA)PART 3 EXECUTION3.1 EQUIPMENT3.1.1 Respirators3.1.2 Protective Clothing3.1.3 Warning Signs and Labels3.1.4 Dehumidifiers3.1.5 Air Filtration
8、Units (AFU)3.1.6 Vacuum Cleaners Equipped with HEPA Filters3.2 GENERAL REQUIREMENTS3.2.1 Pre-Microbial Remediation Work Conference3.2.2 Containment Entry / Exit Procedure3.3 REMOVAL PROCEDURES3.3.1 Protection of Existing Work Areas3.3.2 Remediation of Fungally Contaminated Building Materials3.3.3 Re
9、mediation Procedures3.3.3.1 Remediation of Non-Porous Materials3.3.3.2 Semi-Porous Materials (Unfinished Wood)3.3.3.3 Semi-Porous Materials3.3.3.4 Porous Materials3.4 DETAILED SEQUENCE OF WORK FOR MOLD REMOVAL UNDER CONTAINMENT3.4.1 Preparation for Remediation Work3.4.2 Demolition3.4.3 Post-Demoliti
10、on Inspection3.4.4 Cleaning after Demolition, and Cleaning of Settled Spores from Porous / Non-Porous Materials3.5 DUCT AND HVAC SYSTEM CLEANING3.5.1 Contractor Qualifications3.5.2 Inspection3.6 FIRE PROTECTION3.7 CONSTRUCTION BARRIERS3.8 QUALITY ASSURANCE / QUALITY CONTROL REQUIREMENTS3.8.1 Contrac
11、tor Qualifications3.8.2 Waste Management and Removal3.8.3 Post-Remediation Inspection3.8.3.1 Clearance3.9 CLEAN-UP AND DISPOSAL3.9.1 Disposal of Material3.9.2 Material PackagingSECTION 02 85 00.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
12、,-,-3.9.3 Building Exit (Waste Disposal)3.9.4 Hazardous Material3.10 Appendices- End of Section Table of Contents -SECTION 02 85 00.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 85 00.00 20 (May 2
13、011)-Preparing Activity: NAVFAC SupersedingUFGS-02 85 00.00 20 (November 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 02 85 00.00 20MOLD REMEDIATION05/11*NOTE: This section covers the requirements for the demolition, cleaning, removal, an
14、d disposal of mold contaminated materials.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting,
15、or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.TO DOWNLOAD UFGS GRAPHICSGo to http:/www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.Comments, sugges
16、tions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: The Contracting Officer shall furnish the Contractor, in the contract documents, an initial Microbial Assessment Survey with containment categories and remediation
17、 methods specified for each work area and material within the work area.The Contracting Officers initial Microbial Assessment Survey specified below shall be furnished and certified by a qualified assessor authorized by the Contracting Officer to do such work. The initial survey shall be included in
18、 the solicitation documents at the end of this specification section.The Contracting Officer shall ensure that in the initial survey a cost analysis that identifies the SECTION 02 85 00.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-pote
19、ntial for replacement of the contaminated items versus remediation is provided. This information shall not be shared with the contractor.The Contracting Officer must require that the microbial assessor provide documentation proving that the assessor meets at least one of the following criteria:1. Ba
20、chelors degree from an accredited university or college with a major in engineering, architecture, building construction, occupational health, microbiology, occupational safety, or a related natural or physical science. Additionally, two years experience in conducting microbial investigations is req
21、uired.2. Associates degree from an accredited university or college with a concentration in environmental, natural or physical sciences. Additionally, four years experience in conducting microbial investigations is required.3. Certification as an industrial hygienist (CIH) as certified by the Americ
22、an Board of Industrial Hygienists, safety professional (CSP) as certified by the Board of Certified Safety Professionals or engineer (PE). Additionally, one year experience in conducting microbial investigations is required.4. Certification by the American Council for Accredited Certification (ACAC)
23、 as a Council-Certified Indoor Environmental Consultant (CIEC), Council-Certified Indoor Environmentalist (CIE), Council-Certified Mold Consultant (CMC), Council-Certified Microbial Investigator (CMI), Council-Certified Residential Mold Inspector (CRMI), Council-Certified Mold Remediation Supervisor
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS02850000202011MOLDREMEDIATION 矫正 PDF

链接地址:http://www.mydoc123.com/p-984701.html