1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 82 16.00 20 (August 2011)-Preparing Activity: NAVFAC SupersedingUFGS-02 82 16.00 20 (February 2010)UFGS-02 82 16.00 20 (April 2006)UFGS-13281N (August 2003)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2011*SECTION TAB
2、LE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 82 16.00 20ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS08/11PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.2.1 ACM1.2.2 Amended Water1.2.3 Area Sampling1.2.4 Asbestos1.2.5 Asbestos Control Area1.2.6 Asbestos Fibers1.2.7 Asbestos Permiss
3、ible Exposure Limit1.2.8 Background1.2.9 Contractor1.2.10 Competent Person1.2.11 Encapsulation1.2.12 Encapsulants1.2.13 Friable Asbestos Material1.2.14 Glovebag Technique1.2.15 HEPA Filter Equipment1.2.16 Navy Consultant (NC)1.2.17 Negative Pressure Enclosure (NPE)1.2.18 Nonfriable Asbestos Material
4、1.2.19 Personal Sampling1.2.20 Private Qualified Person (PQP)1.2.21 Qualified Person (QP)1.2.22 TEM1.2.23 Time Weighted Average (TWA)1.2.24 Wetting Agent1.3 REQUIREMENTS1.3.1 Description of Work1.3.1.1 Wallboard/Joint Compound1.3.2 Medical Requirements1.3.2.1 Medical Examinations1.3.2.2 Medical Reco
5、rdsSECTION 02 82 16.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.3.3 Employee Training1.3.4 Permits , Licenses, and Notifications1.3.5 Environment, Safety and Health Compliance1.3.6 Respiratory Protection Program1.3.6.1 Respirator Pr
6、ogram Records1.3.7 Asbestos Hazard Control Supervisor1.3.8 Hazard Communication1.3.9 Asbestos Hazard Abatement Plan1.3.10 Testing Laboratory1.3.11 Landfill Approval1.3.12 Medical Certification1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Private Qualified Person Documentation1.5.2 Competent Person Docume
7、ntation1.5.3 Workers License1.5.4 Contractors License1.5.5 Air Sampling Results1.5.6 Pressure Differential Recordings for Local Exhaust System1.5.7 Protective Clothing Decontamination Quality Control Records1.5.8 Protective Clothing Decontamination Facility Notification1.6 EQUIPMENT1.6.1 Rental Equi
8、pmentPART 2 PRODUCTS2.1 ENCAPSULANTS2.1.1 Removal Encapsulants2.1.2 Bridging Encapsulant2.1.3 Penetrating Encapsulant2.1.4 Lock-down EncapsulantPART 3 EXECUTION3.1 EQUIPMENT3.1.1 Respirators3.1.1.1 Respirators for Handling Asbestos3.1.2 Exterior Whole Body Protection3.1.2.1 Outer Protective Clothing
9、3.1.2.2 Work Clothing3.1.2.3 Personal Decontamination Unit3.1.2.4 Decontamination of Reusable Outer Protective Clothing3.1.2.5 Eye Protection3.1.3 Warning Signs and Labels3.1.3.1 Warning Sign3.1.3.2 Warning Labels3.1.4 Local Exhaust System3.1.5 Tools3.1.6 Rental Equipment3.1.7 Glovebags3.2 WORK PROC
10、EDURE3.2.1 Protection of Existing Work to Remain3.2.2 Furnishings3.2.3 Precleaning3.2.4 Asbestos Control Area Requirements3.2.4.1 Negative Pressure Enclosure3.2.4.2 Glovebag3.2.5 Removal Procedures3.2.5.1 Sealing Contaminated Items Designated for DisposalSECTION 02 82 16.00 20 Page 2Provided by IHSN
11、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.5.2 Exposed Pipe Insulation Edges3.2.6 Encapsulation Procedures3.2.6.1 Preparation of Test Patches3.2.6.2 Field Testing3.2.6.3 Large-Scale Application3.2.7 Air Sampling3.2.7.1 Sampling Prior to Asbestos Work3.2.7.2
12、 Sampling During Asbestos Work3.2.7.3 Sampling After Final Clean-Up (Clearance Sampling)3.2.8 Lock-Down3.2.9 Site Inspection3.3 CLEAN-UP AND DISPOSAL3.3.1 Housekeeping3.3.2 Title to Materials3.3.3 Disposal of Asbestos3.3.3.1 Procedure for Disposal3.3.3.2 Asbestos Disposal Quantity Report- End of Sec
13、tion Table of Contents -SECTION 02 82 16.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 82 16.00 20 (August 2011)-Preparing Activity: NAVFAC SupersedingUFGS-02 82 16.00 20 (February 2010)UFGS-02 82
14、 16.00 20 (April 2006)UFGS-13281N (August 2003)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2011*SECTION 02 82 16.00 20ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS08/11*NOTE: This guide specification covers the requirements for safety procedures and
15、 requirements for the demolition, removal, encapsulation, and disposal of asbestos containing materials (ACM).Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide s
16、pecification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions an
17、d recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: Federal regulations require EPA model accreditation plan training to edit this document. Furthermore, asbestos abatement designers must be accredited and licensed to desig
18、n asbestos work in the location of the construction.Nonfriable asbestos containing materials do not always require special handling. However, during demolition and removal of this material dust and airborne asbestos fibers will sometimes be released. If the project contains nonfriable asbestos which
19、 may release fibers when demolished and removed, the nonfriable asbestos shall be removed in the same way as friable asbestos.SECTION 02 82 16.00 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-OSHA regulations address worker protection, NES
20、HAPS (EPA) regulations address disposal requirements, and they have different definitions as to what constitutes ACM in wallboard/joint compound systems. Therefore, where wallboard/joint compound are suspected to contain ACM, analyze both discrete samples (separate samples from wallboard and joint c
21、ompound) to address worker protection and composite samples (wallboard system as a whole) to address disposal requirements. It is not unusual for the wallboard itself and the wallboard system (taken as a whole) to contain less than 1 percent asbestos, but the discrete joint compound samples to conta
22、in greater than 1 per cent asbestos. Problems can arise if these materials are not properly categorized in the design. Also, if the material is applied as an “add on” or “skim coat”, NESHAPS considers the layers separate and composite sampling is not appropriate.Asbestos operations do not always ind
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS02821600202011ENGINEERINGCONTROLOFASBESTOSCONTAININGMATERIALS 石棉 材料 工程 控制 PDF

链接地址:http://www.mydoc123.com/p-984698.html