NAVY UFGS-01 32 17 00 20-2010 NETWORK ANALYSIS SCHEDULES (NAS)《网络分析进度(NAS)》.pdf
《NAVY UFGS-01 32 17 00 20-2010 NETWORK ANALYSIS SCHEDULES (NAS)《网络分析进度(NAS)》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-01 32 17 00 20-2010 NETWORK ANALYSIS SCHEDULES (NAS)《网络分析进度(NAS)》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 32 17.00 20 (August 2010)-Preparing Activity: NAVFAC SupersedingUFGS-01 32 17.00 20 (December 2009)UFGS-01 32 17.00 20 (November 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 32 17.00 20NETWO
2、RK ANALYSIS SCHEDULES (NAS)08/10PART 1 GENERAL1.1 DESCRIPTION1.2 SUBMITTALS1.3 SCHEDULE ACCEPTANCE PRIOR TO START OF WORK1.4 SOFTWARE1.5 QUALIFICATIONS1.6 NETWORK SYSTEM FORMAT1.6.1 Diagrams1.6.2 Schedule Activity Properties and Level of Detail1.6.2.1 Activity Categories1.6.2.2 Contract Milestones a
3、nd Constraints1.6.2.3 Activity Code1.6.2.4 Anticipated Weather Delays1.6.2.5 Cost Loading1.6.3 Schedule Software Settings and Restrictions1.6.4 Required Tabular Reports1.7 SUBMISSION AND ACCEPTANCE1.7.1 Monthly Network Analysis Updates1.7.2 As-Built Schedule1.8 CONTRACT MODIFICATION1.9 PROJECT FLOAT
4、1.10 THREE-WEEK LOOK AHEAD SCHEDULEPART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -SECTION 01 32 17.00 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 32 17.00 20 (August 2010)-Prepa
5、ring Activity: NAVFAC SupersedingUFGS-01 32 17.00 20 (December 2009)UFGS-01 32 17.00 20 (November 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION 01 32 17.00 20NETWORK ANALYSIS SCHEDULES (NAS)08/10*NOTE: This guide specification covers the preparation and use of Design-Bid-Build Network Analysi
6、s Schedule.Insert this guide specification when a fixed-price construction contract is contemplated and the contract amount is expected to exceed $750,000, and the contract duration is expected to exceed 6 months. Insert this guide specification in such contracts when the contract amount is expected
7、 to be less than $750,000 and the contract duration is expected to be less than 6 months, when there is a known critical completion date for the Supported Command. Consult the Administering FEAD/ROICC Office on all construction contracts under the stated threshold values to determine if insertion of
8、 this guide specification is required.Insert this guide specification on all NAVFAC Pacific Marianas, Hawaii and Diego Garcia projects.This section shall be reviewed and approved by the administering FEAD/ROICC prior to completion of the Invitation For Bids (IFB).Coordination is required with Sectio
9、n 01 20 00.00 20, PRICE AND PAYMENT PROCEDURES, when cost loaded Network Analysis Schedules is specified.Comments and suggestions on this specification are welcome and should be directed to the NAVFAC technical proponent of the specification. A listing of Technical Proponents, including their organi
10、zation designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).Use of electronic communication is encouraged.SECTION 01 32 17.00 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without lic
11、ense from IHS-,-,-Brackets are used in the text to indicate designer/FEAD/ROICC choices or locations where text must be supplied by the designer/FEAD/ROICC.*PART 1 GENERAL1.1 DESCRIPTIONThe Contractor is responsible for scheduling procurement, Contractor quality control and construction, acceptance
12、testing and training. Refer to Specification Section 01 33 00 SUBMITTAL PROCEDURES to determine if any items require Government approval prior to construction; If any are required, that submittal review time shall be included in the schedule.The schedule is a tool to manage the project, both for Con
13、tractor and Government activities. It will also be used to report progress and evaluate time extensions. If cost-loaded, it will provide the basis for progress payments.The Contractor shall use the Critical Path Method (CPM) and the Precedence Diagram Method (PDM) to satisfy time and cost applicatio
14、ns. For consistency, when scheduling software terminology is used in this specification, the terms in Primaveras scheduling programs are used.1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES. Edit the following list to reflect only the submi
15、ttals required for the project. Keep submittals to the minimum required for adequate quality management and Government construction management activities.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only de
16、lete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.*The use of a “G“ following a submittal indicates that a Government approval ac
17、tion is required. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES, except as modified in this contract.SD-01 Preconstruction SubmittalsQualifications; GBaseline Network Analysis Schedule (NAS); GSD-07 CertificatesMonthly Network Analysis Schedule Update; GSECTION 01 32
18、17.00 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SD-11 Closeout SubmittalsAs-Built Schedule; G1.3 SCHEDULE ACCEPTANCE PRIOR TO START OF WORKThe Contracting Officer and Contractor shall participate in a preliminary meeting(s) to discuss
19、the proposed schedule and requirements of this section prior to the Contractor preparing the Project Baseline Schedule.Government review comments on the Contractors schedule(s) shall not relieve the Contractor from compliance with requirements of the Contract Documents.Only bonds shall be paid prior
20、 to acceptance of the Baseline Network Analysis Schedule (NAS).The acceptance of a Baseline NAS is a condition precedent to:1. The Contractor starting work on the demolition or construction stage(s) of the contract.2. Processing Contractors pay request(s) for construction activities/items of work.3.
21、 Review of any schedule updates.Submittal of the Baseline Network Analysis Schedule, and subsequent schedule updates, shall be understood to be the Contractors certification that the submitted schedule meets all of the requirements of the Contract Documents, represents the Contractors plan on how th
22、e work shall be accomplished, and accurately reflects the work that has been accomplished and how it was sequenced (as-built logic).1.4 SOFTWAREProject schedules must be prepared and maintained using Primavera P3, Primavera SureTrak or current mandated scheduling program. Save files in Concentric P3
23、 or current mandated scheduling program file format, compatible with the Governments version of the scheduling program. Importing data into P3/SureTrak/current mandated scheduling program using data conversion techniques or third party software will be cause for rejection of the submitted schedule.1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS01321700202010NETWORKANALYSISSCHEDULESNAS 网络分析 进度 NASPDF

链接地址:http://www.mydoc123.com/p-984686.html