1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 30 00 (November 2011)-Preparing Activity: NAVFAC Superseding UFGS-01 30 00 (May 2011)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 30 00ADMI
2、NISTRATIVE REQUIREMENTS11/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 COLOR BOARDS FOR AIR FORCE PROJECTS1.4 VIEW LOCATION MAP1.5 PROGRESS AND COMPLETION PICTURES1.6 MINIMUM INSURANCE REQUIREMENTS1.7 CONTRACTOR SPECIAL REQUIREMENTS1.7.1 Asbestos Containing Material1.7.2 Space Temperature Control
3、, HVAC TAB, and Apparatus Inspection1.8 SUPERVISION1.9 SUPERVISION1.10 PRECONSTRUCTION CONFERENCE1.11 FACILITY TURNOVER PLANNING MEETINGS (NAVFAC Red Zone - NRZ)1.12 EXPORT LICENSES FOR OVERSEAS PROJECTS1.13 WAIVER FOR WORKERS COMPENSATION1.14 PARTNERING1.14.1 Formal Partnering1.14.2 Informal Partne
4、ring1.15 AVAILABILITY OF CADD DRAWING FILES1.16 ELECTRONIC MAIL (E-MAIL) ADDRESSPART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -SECTION 01 30 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA
5、UFGS-01 30 00 (November 2011)-Preparing Activity: NAVFAC Superseding UFGS-01 30 00 (May 2011)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION 01 30 00ADMINISTRATIVE REQUIREMENTS11/11*NOTE: This guide specification covers the requirements for gen
6、eral administrative paragraphs.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising
7、 text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be su
8、bmitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: Issue (date) of references included in project specifications need not be more current than provided by the latest guide specification. Use of SpecsIntact automated reference checking is recommended for projects based on
9、older guide specifications.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)15 CFR 772 Definition of TermsSECTION 01 30 00
10、Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-15 CFR 773 Special Licensing Procedures1.2 SUBMITTALS*NOTE: Submittals must be limited to those necessary for adequate quality control. The importance of an item in the project should be one of th
11、e primary factors in determining if a submittal for the item should be required.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be revie
12、wed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ d
13、esignation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“
14、for Project Office. Codes following the “G“ typically are not used for Navy projects.Submittal items not designated with a “G“ are considered as being for information only for Army projects and for Contractor Quality Control approval for Navy projects.*Government approval is required for submittals
15、with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accord
16、ance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsView location map; G; G, _Progress and completion pictures; G; G, _SD-04 Samples*NOTE: Use this paragraph only for Air Force projects. Do not use this paragraph in Design-Build projects.*SECTION 01 30 00 Page 3Provided b
17、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Color boards; G; G, _1.3 COLOR BOARDS FOR AIR FORCE PROJECTSSubmit five sets of color boards within 90 calendar days after Contract Award. Each set of boards shall include samples of colors and finishes of interi
18、or surfaces, such as walls, floors, and ceilings. The samples shall be presented on 200 by 270 mm 8 by 10-1/2 inches boards (modules) with a maximum spread of 600 by 810 mm 24 by 31-1/2 inches for foldouts. Modules shall be designed to fit in a standard loose-leaf, three-ring binder. Where special f
19、inishes such as architectural concrete, carpet, or prefinished textured metal panels are required, samples not less than 300 mm12 inches square shall be submitted with the board. If more space is needed, more than one board per set may be submitted. The Contractor shall certify that he has reviewed
20、the color samples in detail and that the color samples are in strict accordance with contract drawings and specifications, except as may be otherwise explicitly stated. Submittal of color samples shall not relieve the Contractor of the responsibility to submit samples required elsewhere herein.1.4 V
21、IEW LOCATION MAPSubmit to the Contracting Officer, prior to or with the first slide digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.1.5 PROGRESS AND COMPLETION PICTURES*NOTE: Digital photographs greatly
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0130002011ADMINISTRATIVEREQUIREMENTS 行政 要求 PDF

链接地址:http://www.mydoc123.com/p-984684.html