NAVY UFGS-01 11 00-2011 SUMMARY OF WORK《工作总结》.pdf
《NAVY UFGS-01 11 00-2011 SUMMARY OF WORK《工作总结》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-01 11 00-2011 SUMMARY OF WORK《工作总结》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 11 00 (August 2011)-Preparing Activity: NAVFAC SupersedingUFGS-01 11 00 (January 2008) UFGS-01 11 00 (July 2007)UFGS-01 11 00.00 40 (June 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2011*SECTION TABLE OF CONTENT
2、SDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 11 00SUMMARY OF WORK08/11PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.3 SUBMITTALS1.4 WORK COVERED BY CONTRACT DOCUMENTS1.4.1 Project Description1.4.2 Location1.5 CONTRACT DRAWINGS1.6 WORK RESCHEDULING1.7 PROJECT ENVIRONMENTAL GOALS1.7.1 Independent Veri
3、fication1.7.1.1 US Green Building Council (USGBC) - LEED(tm) Rating System1.7.1.2 Green Globes US1.7.1.3 EPA Energy Performance Rating1.8 OCCUPANCY OF PREMISES1.9 EXISTING WORK1.10 ON-SITE PERMITS1.10.1 Utility Outage Requests and Utility Connection Requests1.10.2 Borrow, Excavation, Welding, and Bu
4、rning Permits1.11 LOCATION OF UNDERGROUND FACILITIES1.11.1 Notification Prior to Excavation1.12 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT1.12.1 Delivery Schedule1.12.2 Delivery Location1.13 GOVERNMENT-INSTALLED WORK1.14 Navy and Marine Corps (NMCI) Coordination Requirements1.14.1 NMCI Contractor A
5、ccess1.15 SALVAGE MATERIAL AND EQUIPMENTPART 2 PRODUCTSPART 3 EXECUTIONSECTION 01 11 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- End of Section Table of Contents -SECTION 01 11 00 Page 2Provided by IHSNot for ResaleNo reproduction or ne
6、tworking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 11 00 (August 2011)-Preparing Activity: NAVFAC SupersedingUFGS-01 11 00 (January 2008) UFGS-01 11 00 (July 2007)UFGS-01 11 00.00 40 (June 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement wi
7、th UMRL dated July 2011*SECTION 01 11 00SUMMARY OF WORK08/11*NOTE: This guide specification covers the requirements for a description of work covered in this contract and is required for use in all projects.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when ed
8、iting this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements
9、 not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: When using this section, a Project Information Form should be filled out f
10、or the Contract Specialist. This form is available from the Construction Criteria Base website at http:/www.wbdg.org/ccb. The form is found in the Specification Library, NAVFAC Specifications Category, Project Information Form.*NOTE: Include on the drawing:1. Location of project.2. Limits of contrac
11、tors work area.SECTION 01 11 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3. Location of Government-furnished work.4. Location of Government installed work.5. Contractors on-base route to site.*NOTE: See “FAC 5252.211-9301, Phased Constru
12、ction Schedule.“*PART 1 GENERAL1.1 REFERENCES*NOTE: Issue (date) of references included in project specifications need not be more current than provided by the latest guide specification. Use of SpecsIntact automated reference checking is recommended for projects based on older guide specifications.
13、*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM E 2114 (2008) Standard Terminology for Sustainability Relative to the Performance of BuildingsGREEN
14、BUILDING INITIATIVE (GBI)Green Globes (2004) Green Globes(tm) US Green Building Rating SystemU.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling SystemU.S. GREEN BUILDING COUNCIL (USGBC)LEED (2002; R 2005) Leadership in Energy and Environmental
15、 Design(tm) Green Building Rating System for New Construction (LEED-NC)1.2 DEFINITIONSDefinitions pertaining to sustainable development are as defined in ASTM E 2114, Section 01 35 40.00 20 ENVIRONMENTAL MANAGEMENTSection 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and as specified.a. “Environmentally
16、preferable products“ have a lesser or reduced effect SECTION 01 11 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition
17、, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.b. “Indoor environmental quality“ is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal
18、comfort, daylighting, and views.c. “Operational performance“ is the functional behavior of the building as a whole or of the building components.d. “Sustainability“ is the balance of environmental, economic, and societal considerations.1.3 SUBMITTALS*NOTE: Submittals must be limited to those necessa
19、ry for adequate quality control. The importance of an item in the project should be one of the primary factors in determining if a submittal for the item should be required.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked
20、with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army project
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0111002011SUMMARYOFWORK 工作总结 PDF