1、*USACE / NAVFAC / AFCESA / NASA UFGS-00 73 04 (April 2008)-Preparing Activity: NAVFAC Superseding UFGS-00 73 04 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTSSEC
2、TION 00 73 04SPECIAL CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA04/08PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 PUBLIC RELEASE OF INFORMATION1.3.1 Prohibition1.3.2 Subcontracts and Purchase Orders1.4 ENGLISH SPEAKING REPRESENTATIVE1.5 NORMS AND LAWS1.6 INDUSTRY STANDARDS1.7 PROHIBITED ITEMS1.8
3、PROPRIETARY NAMES1.9 SUBMITTAL OF PROOF OF QUALIFICATIONS AND EXPERIENCE1.10 ORAL MODIFICATION1.11 NO WAIVER BY GOVERNMENT1.12 PRODUCTS SPECIFIED USING USA STANDARDS1.12.1 Local Products Specified Using United States of America (USA) Standards1.12.2 USA Manufactured Products Specified Using USA Stan
4、dards1.12.3 Consignment, Marking, and Customs Clearance1.12.4 Excess1.13 FINAL GOVERNING STANDARDS (FGS)1.14 SECURITY REQUIREMENTS1.14.1 Contractor Employee Base Access Pass:1.14.2 Contractor Employee Base Access Pass:1.14.3 Responsibility for Physical Security1.14.4 Access to Operational Areas1.14.
5、5 Employment1.14.6 Compliance1.15 ANTI-MAFIA LAW1.15.1 Pre-Award Effect of Anti-Mafia Procedures1.15.2 Termination Under Italian Law No. 646 (Anti-Mafia)1.15.3 Application of Italian Law No. 646 (Anti-Mafia) to Subcontractors1.15.4 Documentation Requirements1.16 CERTIFICATION OF COMPLIANCE WITH ITAL
6、IAN LAWSDOCUMENT 00 73 04 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.16.1 Certification1.16.2 Static Load and Final Testing1.16.3 Other Tests1.17 CULTURAL RESOURCES1.18 UNEXPLODED ORDNANCE1.19 EXCLUSION OF PRICE REVISION LAWS1.20 OPTIONA
7、L PURCHASE1.21 SECURITY REQUIREMENTSPART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -DOCUMENT 00 73 04 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-00 73 04 (April 2008)-Preparing Activi
8、ty: NAVFAC Superseding UFGS-00 73 04 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 00 73 04SPECIAL CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA04/08*NOTE: This guide specification covers the requirements for special requirements fo
9、r projects located in the area of responsibility of Naval Engineering Field Activity Mediterranean.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove informati
10、on and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designa
11、tion and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for AVIANO (Aviano Air Base, Italy). Selection or deselection of a tailoring option will include or exclude that opti
12、on in the section, but editing the resulting section to fit the project is still required.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and liste
13、d in this paragraph by organization, designation, date, DOCUMENT 00 73 04 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article t
14、o automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the p
15、ublish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ITALIAN LAWS AND DECREES (D.M.)LAW No. 1086 (May 11, 1971) Norms for Works in Reinforced Concrete and Steel a
16、nd Application InstructionsLaw No. 373 (April 30, 1976) Norms for the containment of energy consumption for thermal uses in buildings.Law No. 46 (March 5, 1990) Safety Norms for Technological Systems1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROC
17、EDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked wi
18、th a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects,
19、 a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other orga
20、nization in the District Office); “AO“ for Area Office; “RO“ for DOCUMENT 00 73 04 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force,
21、 and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0073042008SUPPLEMENTARYCONDITIONSFORPROJECTSINMEDITERRANEANAREA 地中海 地区 项目 补充 条件 PDF

链接地址:http://www.mydoc123.com/p-984679.html