1、*USACE / NAVFAC / AFCESA / NASA UFGS-00 73 03 (April 2008)-Preparing Activity: NAVFAC Superseding UFGS-00 73 03 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSUse for NAVFAC ATLANTIC projects onlyReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 00 - PROC
2、UREMENT AND CONTRACTING REQUIREMENTSSECTION 00 73 03SPECIAL CONDITIONS FOR AZORES PROJECTS04/08PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 PHYSICAL DATA1.4 LEGAL HOLIDAYS1.5 GOVERNMENT FURNISHED SURFACE TRANSPORTATION1.5.1 Scheduling and Administration of Government Furnished Transportation1.5.2 C
3、ontractor Packaged Containers for Shipment1.5.3 Government Packaged Containers for Shipment1.5.4 Arrival of Cargo at Lajes Field, Azores1.5.5 Retrograde Shipment1.5.6 Packing, Marking and Documentation of Material and Equipment1.5.6.1 Shipping Status Reports1.5.7 Loss or Damage of Contractor Propert
4、y During Shipment/Handling by Government Carriers1.6 SERVICES AVAILABLE TO CONTRACTORS FORCES1.7 CONDUCT OF CONTRACTOR PERSONNEL1.8 TURN-IN OF U.S. GOVERNMENT-OWNED MATERIAL AND EQUIPMENT1.9 EMPLOYEE RECRUITING (PORTUGUESE NATIONALS)1.10 SURPLUS PROPERTY DISPOSAL OF MATERIALS OF NON-PORTUGUESE ORIGI
5、N1.11 INVESTIGATION OF DAMAGE OR INJURY1.12 PROCESSING OF CONTRACTORS PERSONNEL AND PROPERTY1.13 VISAS-DIPLOMATIC CLEARANCES1.14 REGISTRATION AND VEHICLE AND DRIVING PRIVILEGES1.15 RADIO FREQUENCIES FOR MOBILE AND PORTABLE RADIOS1.16 SPECIAL REQUIREMENTS FOR OUTDOOR SIGNS1.17 WRITTEN CORRESPONDENCE1
6、.18 PORTUGUESE EQUIVALENT1.19 SOURCE REQUIREMENTS CLAUSE (01 MAY 86)DOCUMENT 00 73 03 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -DOCUMENT 00 73 03 Page 2Provided by IHSNot
7、for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-00 73 03 (April 2008)-Preparing Activity: NAVFAC Superseding UFGS-00 73 03 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSUse for NAVFAC ATLANTIC projects onlyReferences are in a
8、greement with UMRL dated March 2008*SECTION 00 73 03SPECIAL CONDITIONS FOR AZORES PROJECTS04/08*NOTE: This guide specification covers special administrative requirements for projects located in the Azores.Edit this guide specification for project specific requirements by adding, deleting, or revisin
9、g text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technic
10、al proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to l
11、ist the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature DOCUMENT 00 73 03 Page 3Provided by I
12、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References
13、 not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within t
14、he text by the basic designation only.U.S. DEPARTMENT OF DEFENSE (DOD)DOD 4500.9-R (2007) Defense Transportation Regulation - Part II: Cargo Movement1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only
15、 the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submi
16、ttal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submi
17、ttal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Of
18、fice; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is requ
19、ired for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control DOCUMENT 00 73 03 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-approval.for information only. When used, a designation fol
20、lowing the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with 01 33 00 SUBMITTAL PROCEDURES:SD-06 Test ReportsShipping Status Reports; G; G, _1.3 PHYSICAL DATAData referred to below is furnished for the Contrac
21、tors information. However, it is expressly understood that the Government will not be responsible for interpretation or conclusion drawn therefrom by the Contractor.a. The physical conditions indicated on the drawings and in the specifications are the result of site investigations.b. Geographic Cond
22、itions(1) The Azores are comprised of a group of nine small islands, politically an integral part of Portugal, lying in the North Atlantic, about 2,300 miles east of New York and about 980 miles west of Lisbon, Portugal. The islands have a total area of 1,581 square miles with a total population of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0073032008SUPPLEMENTARYCONDITIONSFORAZORESPROJECTS 亚速尔 项目 补充 条件 PDF

链接地址:http://www.mydoc123.com/p-984678.html