1、*USACE / NAVFAC / AFCESA / NASA UFGS-00 73 02 (August 2008)-Preparing Activity: NAVFAC SupersedingUFGS-00 73 02 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION TABLE OF CONTENTSDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTSSECTION 00 73 02SUPPLEMENTARY CONDITIONS FOR ICELAND PROJ
2、ECTS08/08PART 1 GENERAL1.1 NO CURRENCY ADJUSTMENTS TO CONTRACT PRICE (Nov 2002)1.2 PRICE ESCALATION1.3 USE OF FOREIGN CURRENCY1.4 ICELANDIC TAXES1.5 PRICE VARIATION (AUG 1996)1.6 ICELANDIC TAX RELIEF (MAY 1996)1.7 COMPLIANCE WITH APPLICABLE LAWS1.8 AUTOMOBILE INSURANCE IN ICELAND1.9 RETURN OF CONTRA
3、CTOR PERSONNEL1.10 CONDUCT OF CONTRACTOR PERSONNEL1.11 LABOR STATISTICS1.12 SALE OF JOB-PRODUCED MATERIALS1.13 SALE OF CONTRACTOR INVENTORY1.14 DAMAGE TO WORK DUE TO FLOOD OR EARTHQUAKEPART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -DOCUMENT 00 73 02 Page 1Provided by IHSNot for R
4、esaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-00 73 02 (August 2008)-Preparing Activity: NAVFAC SupersedingUFGS-00 73 02 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION 00 73 02SUPPLEMENTARY CONDITIONS FOR ICELAND PROJECTS0
5、8/08*NOTE: This guide specification covers the requirements for specialrequirements for projects located in Iceland.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information
6、.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their org
7、anization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 NO CURRENCY ADJUSTMENTS TO CONTRACT PRICE (Nov 2002)This will be a firm fixed price contract awarded under competitive procedures. Th
8、ere will be no adjustments to the contract price other than necessary changes to the work itself. Therefore, the contractor is encouraged to consider the length of time to perform the contract and the estimated amount of locally bought materials expected to be used. This, in conjunction with histori
9、cal exchange rate data obtainable, for example, from the Central Bank of Iceland, should be utilized when constructing a bid to compensate for any perceived future currency fluctuations during the term of the contract.1.2 PRICE ESCALATIONa. The Contractor warrants that the price set forth in the con
10、tract does not include allowance for contingency to cover increased costs of performance resulting from increase in Contractors rates DOCUMENT 00 73 02 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-of pay set forth in the “Wage Rate Schedule“
11、 included in the contract specifications. The Contractor shall submit to the Contracting Officer within 30 days after receipt of a notice to proceed a schedule of proposed labor distribution for the project, listing trade categories, type, and wage category level. The submission of the labor distrib
12、ution schedule is mandatory to effect equitable adjustments if wage increases occur during the completion time specified for the project.b. If at any time during the time set forth for completion of the work in the contract documents there is an increase or decrease in the rates of pay as set forth
13、in the “Wage Rate Schedule,“ the Contractor shall notify the Contracting Officer of the changes within 60 days of such increase or decrease or within such further period as may be approved in writing by the Contracting Officer; but in any event no later than final payment under the contract. Such no
14、tice shall include the Contractors proposal for an equitable adjustment in the contract price to be negotiated in accordance with subparagraph c below and shall be accompanied by data, in such form as the Contracting Officer may require explaining (1) the causes, (2) the effective date, and (3) the
15、amount, both of the increase or decrease and of the Contractors proposal for an equitable adjustment.c. Promptly upon receipt of notice and data described in subparagraph b above, the Contractor and the Contracting Officer will negotiate an equitable adjustment, and the effective date thereof, in th
16、e contract price to effect any change in the cost of performance of the contract due to the increase or decrease in rates of pay as set forth in the “Wage Rate Schedule“; provided however, that such negotiations may be postponed by the Contracting Officer until an accumulation of such increases and
17、decreases results in an adjustment allowable under subparagraph d. The equitable adjustment, and the effective date thereof, will be set forth in a modification to the contract. Such modification will also revise the rates of pay as set forth in the “Wage Rate Schedule“ to reflect the increase or de
18、crease therein. Failure of the parties to agree to an adjustment under this clause shall be deemed to be a dispute concerning a question of fact within the meaning of the General Conditions Clause entitled “Disputes.“ Pending agreement on, or determination of, any such adjustment and its effective d
19、ate, the Contractor shall continue performance.d. Notwithstanding other provisions of this clause, price adjustments under this clause shall be subject to the following limitations:There shall be no adjustment other than for increases or decreases in the rates of pay as set forth in the “Wage Rate S
20、chedule.“e. The final invoice submitted under this contract shall include a certification that the Contractor has not experienced a decrease in rates of pay for labor set forth in the “Wage Rate Schedule“ or that the Contractor has given notice of such decreases in compliance with subparagraph b abo
21、ve.f. The equitable adjustment, and the effective date thereof, will be set forth in a modification to the contract. Such modification will also revise the rates of pay for labor set forth in the “Wage Rate Schedule“ to reflect the increases. Failure of the parties DOCUMENT 00 73 02 Page 3Provided b
22、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-to agree to an adjustment under this clause shall be deemed to be a dispute concerning a question of fact within the meaning of the General Conditions Clause entitled “Disputes.“ Pending agreement on, or determin
23、ation of, any such adjustment and its effective date, the Contractor shall continue performance.g. The Contracting Officer may examine the Contractors books and other supporting data relevant to the cost of labor during reasonable times until 3 years after final payment under the contract.1.3 USE OF
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0073022008SUPPLEMENTARYCONDITIONSFORICELANDPROJECTS 冰岛 项目 补充 条件 PDF

链接地址:http://www.mydoc123.com/p-984677.html