1、*USACE / NAVFAC / AFCESA / NASA UFGS-00 73 01 (August 2008)-Preparing Activity: NAVFAC SupersedingUFGS-00 73 01 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTSSEC
2、TION 00 73 01SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY PROJECTS08/08PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 INFORMATIONAL DATA1.3.1 Work Force1.3.1.1 Entry Approval for Employees1.3.1.2 Identification of Employees1.3.1.3 Waiver for Workers Compensation1.3.1.4 Local Labor1.3.1.5 Management Pe
3、rsonnel1.3.1.6 Work outside Regular Hours1.3.2 Storage of Materials1.3.3 Access Roads1.3.4 Availability and Cost of Government Materials and Services1.3.4.1 List of Government Equipment1.3.5 Ocean Freight1.3.6 Medical and Dental Services1.3.7 Post Exchange and Commissary Privilege and Recreation Fac
4、ilities1.3.8 On-Base Transportation1.3.9 Laundry and Dry Cleaning1.3.10 Government Utilities1.3.11 Port-a-let, Refuse Collection and Sanitary Sewage Trucking Service1.3.12 Transportation of Personnel1.3.13 Food Facilities1.3.14 Petroleum Products1.3.15 Purchases From the Government1.3.16 Private Air
5、craft1.3.17 Contractor Debts1.3.18 Energy Conservation1.3.19 Drug Abuse by Contract Employees1.3.20 Available Living Quarters1.3.20.1 Crew Berthing1.3.20.2 Contractor Management/Supervisory Housing1.3.21 Electronic InvoicesDOCUMENT 00 73 01 Page 1Provided by IHSNot for ResaleNo reproduction or netwo
6、rking permitted without license from IHS-,-,-1.3.22 E-mail and InternetPART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -DOCUMENT 00 73 01 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-00
7、73 01 (August 2008)-Preparing Activity: NAVFAC SupersedingUFGS-00 73 01 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 00 73 01SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY PROJECTS08/08*NOTE: This guide specification covers the requir
8、ements for special requirements for projects located at Guantanamo Bay, Cuba.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements no
9、t required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone num
10、ber, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designa
11、tion only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Refe
12、rence feature to update the issue dates.DOCUMENT 00 73 01 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile
13、references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.INSTRUCTIONS AND STANDARDS FOR NAVBASE GUANTANAMO BAY CUBA (COMNAVBASEGTMOINST)11300.3 Bas
14、e Energy Conservation Regulations1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality con
15、trol.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the s
16、ubmittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects usi
17、ng the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy
18、, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Contr
19、ol approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:DOCUMENT 00 73 01 Page 4Provided by IHSNot for R
20、esaleNo reproduction or networking permitted without license from IHS-,-,-SD-01 Preconstruction SubmittalsEntry Approval for Employees; G; G, _1.3 INFORMATIONAL DATA1.3.1 Work ForceDue to the sensitive locale of the U.S. Naval Base, Guantanamo Bay, Cuba, foreign nationals from dissident political ar
21、eas may be excluded and denied entry approval. In general, foreign nationals may be used. The Contractor agrees to dismiss from the site, when directed by the Contracting Officer, any individual whose continued employment is deemed to be contrary to the public interest or inconsistent with the best
22、interest of the national security.1.3.1.1 Entry Approval for EmployeesNo employee or representative of the Contractor will be admitted to the U.S. Naval Base, Guantanamo Bay, Cuba without prior entry approval. The background of Contractor personnel will be screened prior to entry to the U.S. Naval B
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0073012008SUPPLEMENTARYCONDITIONSFORGUANTANAMOBAYPROJECTS GUANTANAMO 项目 辅助 条件 PDF

链接地址:http://www.mydoc123.com/p-984676.html