1、 CHANGE 3 June 2012 NAVFAC P-307 DECEMBER 2009 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NAVFAC P-307 can be downloaded from http:/portal.navfac.navy.mil/ncc. To order printed copies, visit https:/nll.ahf.nmci.navy.mil (PKI digital certificate
2、required) or contact Naval Inventory Control Point ATTN: NAVICP 03334 Room 3200 700 Robbins Avenue Philadelphia, PA 19111-5098 Phone: (215) 697-2626 DSN: 442-2626 Fax: (215) 697-5914 Stock Number - 0525-LP-109-7546 Due to increased DoD security requirements, a System Authorization Access Request (SA
3、AR) must be submitted in order to gain access to the Naval Logistics Library. Contact the Naval Inventory Control Point helpdesk above for information on the SAAR process and forms. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot f
4、or ResaleNo reproduction or networking permitted without license from IHS-,-,-ii ACKNOWLEDGMENTS Permission to reprint specific portions of the following documents has been granted by the American Society of Mechanical Engineers. ASME B30.2, Overhead and Gantry Cranes (Top Running Bridge, Single or
5、Multiple Girder, Top Running Trolley Hoist) ASME B30.4, Portal, Tower and Pillar Cranes ASME B30.5, Mobile and Locomotive Cranes ASME B30.6, Derricks ASME B30.9, Slings ASME B30.22, Articulating Boom Cranes Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS
6、-,-,-iii CHANGE RECORD This page is provided for recording of future changes to this version of P-307. Change No. Date Title or Brief Description Entered By 1 2 3 3/31/2011 8/11/2011 6/20/2012 NDT Periodicity; Mobile Crane Test; Complex Lift Rules for Ordnance Handling; and OSHA Rules Update for Nav
7、y Cranes Used in Construction Changes. Cranes Owned by Other Services and Operated at Navy Activities; New Crane Procurement and Overhaul; Other Policy Clarifications. Complex Lift Rules for Ordnance Handling; Correction of Mistake in Table 5-1, Equipment History File. Navy Crane Center Navy Crane C
8、enter Navy Crane Center CHANGE 3 June 2012Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-iv CHANGE SYNOPSIS This change synopsis is provided to assist the user in determining the changes to the previous version of NAVFAC P-307. Changes in the text a
9、re indicated by change bars in the left and right margins. Page number only changes are not identified by change bars but are noted in the change synopsis. Table 5-1 Item (9)Corrected inadvertent deletion of this item in Change 2 publication on Navy Crane Center Web Site. Paragraph 10.4.aClarified c
10、omplex lift requirements for cranes handling ordnance. Paragraph 10.4.1.dExempted category 3 cranes lifting ordnance from the complex crane lift requirement due to lifts above 80% of capacity. Paragraph 10.4.1.2Clarified supervisor briefing rules for complex lift requirements for cranes handling ord
11、nance. Paragraph 10.4.1.2.aNoted exemption in paragraph 10.4.1.d. CHANGE 3 June 2012 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-iv CHANGE SYNOPSIS This change synopsis is provided to assist the user in determining the changes to the previous ver
12、sion of NAVFAC P-307. Changes in the text are indicated by change bars in the left and right margins. Page number only changes are not identified by change bars but are noted in the change synopsis. Paragraph 1.1 Clarified that Navy activities on joint bases and other bases must follow P-307 regardl
13、ess of who owns their WHE. Added references for acquisition and overhaul of WHE. Page 1-2 Page number change only. Paragraph 1.3.3 Clarified that SSP OD and NAVSEA ordnance handling equipment exempt from this publication applies to ordnance handling equipment (section 14 type equipment and not crane
14、s). This is a clarification not a change. Pages 1-4, 1-5, 1-6, and 1-7 Page number change only. Paragraph 1.7.2.e Corrected previous typographical error; changed “or” to “of” in first sentence. Pages 1-9 and 1-10 Page number change only. Paragraph 1.7.3 Expanded paragraph outlining requirements for
15、WHE operated by Navy personnel at Navy activities but not owned by the Navy. Clarified requirements for operation of cranes owned by other military services and agencies. Paragraph 1.8 Clarified requirements for joint bases where Navy activities are the tenant and not the crane service provider. Thi
16、s clarification incorporates the requirements of expanded paragraph 1.7.3. Requirements for joint bases where Navy is the service provider remain the same. Paragraph 1.9 Relocated and renumbered paragraph to clarify requirements for Navy personnel performing inspection, maintenance, testing, or cert
17、ification of non-Navy owned and operated WHE. Paragraphs 1.10, 1.11, 1.12, and 1.13, Paragraph number change only. CHANGE 2 August 2011 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-v CHANGE SYNOPSIS This change synopsis is provided to assist the u
18、ser in determining the changes to the previous version of NAVFAC P-307. Changes in the text are indicated by change bars in the left and right margins. Page number only changes are not identified by change bars but are noted in the change synopsis. Paragraph 1.4.kAdded new OSHA definition of “constr
19、uction” to special definitions. Paragraph 1.7.1Revised to reflect new test load for mobile cranes. Page 1-7Page number change only. Paragraph 1.7.2.cAdded requirement for operators of cranes used in construction. Paragraph 1.7.2.gUpdated OSHA references. Paragraph 1.7.2.jAdded signal person requirem
20、ent for cranes used in construction. Paragraph 1.7.2.1Added requirement for tower cranes used in construction. Page 1-11Page number change only. Page 1-12Page number change only. Page 1-13Page number change only. Page 1-14 Page number change only. Paragraph 3.3Revised for clarity. Supplemental Certi
21、fication Sheet now required for mobile cranes. Paragraph 3.5.3.hNew paragraph cross referencing new additional requirements for assembly/disassembly of cranes. Paragraph 3.5.3.1.1Revised for clarity. Paragraph 3.5.3.1.2Revised for clarity. Paragraph 3.5.7Revised to reflect new test load for mobile c
22、ranes. Paragraph 3.7.1Revised to reflect new test load for mobile cranes. Paragraph 3.7.1.1Clarified that water bag type test weights cannot be used on category 4 cranes. CHANGE 1 March 2011 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-vi Paragrap
23、h 3.8.2 Revised to reflect new test load for mobile cranes. Paragraph 3.8.3 Added requirement for barges used to support mobile cranes used in construction. Page 3-12 Page number change only. Figure 3-1 Revised to reflect new mobile crane test. Figure 3-2 Revised to reflect new mobile crane test. Ta
24、ble 5-1 Item (2) Additional requirements for cranes used in construction. Item (6) Revised for clarity. Item (33) New item to keep track of hook material type for new NDT requirements. Paragraph 6.1.2 New requirements for contractors operating Navy cranes used in construction. Paragraph 6.1.3 Paragr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYNAVP3072009MANAGEMENTOFWEIGHTHANDLINGEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-984253.html