NAVY MIL-T-85512-1982 TOW BAR& BRIDLE ASSEMBLY TARGET BANNER AERIAL TDU-32 SERIES《TDU-32系列空中标旗牵引杆和拖索组件》.pdf
《NAVY MIL-T-85512-1982 TOW BAR& BRIDLE ASSEMBLY TARGET BANNER AERIAL TDU-32 SERIES《TDU-32系列空中标旗牵引杆和拖索组件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-85512-1982 TOW BAR& BRIDLE ASSEMBLY TARGET BANNER AERIAL TDU-32 SERIES《TDU-32系列空中标旗牵引杆和拖索组件》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、5 March 1982 SUPJZRSEDING MILITARY SPECIFICATION TOW BAR AND BRIDLE ASSEMBLY, TARGET, BANNER, AERIAL, TDU-32 SERIES This specification is approved for use by Naval Air Systems Command, Department of the Navy, and is available for: use by all Departments and Agencies of the Department of Defense. 1.
2、SCOPE 1.1 Scope. This specification establishes the requirements for the manu- facture and acceptance of the Tow Bar and Bridle Assembly which is used with the TDU-32 series aerial banner target. 2. APPLICABLE DOCUMENTS. 2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. Unles
3、s otherwise speei- fied, the following specifications, standards, and handbooks of the issue listed in that issue of the Department of Defense Index af Specifications and Standards (DoDISS) specified in the solicitation form a part of this specifi- cation to the extent specified herein. Beneficial c
4、omments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Air Engineering Center, Engineering Specifications and Standards Department (ESSD) Code 93, Lakehurst, New Jersey 08733, by using th
5、e self-addressed Standardiza- tion Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. 334T&93:3 .L- PAGES- FSC 6920 P Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-T-85512 b7 m 777790b 0407507 2 m
6、 MIL-T-85512(AS) SPECIFICATIONS FEDERAL UU-T- 106 Tape, Pressure-Sensitive Adhesive, Masking, Paper. MILITARY MIL-W-4088 Webbing, Textile Woven Nylon. MIL- S - 5 6 2 6 Steel: Chrome-Molybdenum (4140) Bars, Rods, and Re- forging Stock (For Aircraft Applications). MIL-S-6049 Steel, Chrome-Nickel-Molyb
7、denum (8740) Bars, and Re- forging Stock (Aircraft Quality). MIL-T-6736 Tubing, Chrome-Molybdenum, 4130 Steel, Seamless and Welded, Aircraft Quality. MIL-H-6875 Heat Treatment of Steels (Aerospace Practice, Process for). STANDARDS MIL I TARY . MIL-STD-105 Sampling Procedures and Tables for Inspectio
8、n by Attributes. MIL-STD-129 Marking for Shipment and Storage. MIL-STD-794 Parts and Equipment, Procedures for Packaging and Packing of. 2.1.2 Other Government documents, drawings, and publications. The follow- ing other Government documents, drawings, and publications form a part of this specificat
9、ion to the extent specified herein. DRAWINGS MILITARY NAVAL AIR SYSTEMS COMMAND (Code Ident 30003) DL 96hAS8005 Tow Bar and Bridle Assembly. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking
10、permitted without license from IHS-,-,-MIL-T-55L2 67 W 7777706 0407507 b 9 - MIL-T-85512(AS) 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the con- tract or purchase order, the contractor is responsible for the performance of all inspection requirem
11、ents as specified herein. Except as otherwise speci- fied in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government re- serves the right
12、to perform any of the inspections set forth in the specifi- cation where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Classification of inspections. The inspection requirements specified herein are classified as foiows: a. First articl
13、e inspection (see 4.4). b. Quality conformance inspection (see 4.5). 4.3 Inspection conditions. Unless otherwise specified, all inspections shall be conducted under the following standard atmospheric conditions: a. Room temperature: t59OF to t95OF (+15OC to +35OC). b. Humidity: Up to 98 percent rela
14、tive. c. Altitude: 23 to 30 inches of mercury (Hg). 4.4 First article inspection. Unless otherwise specified in the contract or purchase order (see 6.2.1), the tow bar and bridle assembly shall be sub- jected to the tests specified herein at the contractors facilities or at a testing activity design
15、ated in the contract or purchase order (see 6.2.1). Acceptance of the first article by the procuring activity shall be based upon no defects in the first article. Prior to assembling the tow bar and bridle assembly, each individual component or part listed on DL 966AS8005 shall be inspected by the c
16、ontractor to assure that the requirements and tolerances specified on each drawing will be met. article test report for review and approval by the procuring activity. The contractor shall prepare a first 4.4.1 First article inspection procedures. The procedures for conducting the first article inspe
17、ction shall be prepared by the contractor for procur- ing activity review and approval (see 6.2.2). procuring activity or Government representative to modify or require addi- tional inspections or tests necessary to determine compliance with the speci- fication or contract (see 6.2.2). The right is
18、reserved by the 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.5 Qualification conformance inspection. The contractor shall prepare quality conformance inspection procedures for review and approval by the procuring activity. Unless otherwise spe
19、cified herein, the contractor shall perform all quality conformance inspections. The contractor shall conduct and show evidence of a detailed visual examination to demonstrate that the tow bar and bridle assembly is capable of being manufactured and assembled in accordance with the tolerances specif
20、ied on DL 966AS8005 and as specified herein. 4.5.1 Examination of the tow bar and bridle assembly. The tow bar and bridle assembly shall be examined for conformance to all the requirements specified herein, and for conformance to the applicable drawings in respect to completeness of detail and parts
21、. 4.5.1.1 Individual parts. Individual parts that comprise the tow bar.and bridle assembly shall be examined to assure that workmanship requirements have been met and that dimensions are within the tolerances specified on the drawings. 4.5.1.2 Classification of characteristics. The tow bar and bridl
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT855121982TOWBARBRIDLEASSEMBLYTARGETBANNERAERIALTDU32SERIESTDU32 系列 中标 牵引 组件 PDF

链接地址:http://www.mydoc123.com/p-982965.html