NAVY MIL-T-46583 C-1992 THRUSTER CARTRIDGE ACTUATED M3A3 METAL PARTS ASSEMBLY《M3A3金属零件集合发动弹药筒推进器》.pdf
《NAVY MIL-T-46583 C-1992 THRUSTER CARTRIDGE ACTUATED M3A3 METAL PARTS ASSEMBLY《M3A3金属零件集合发动弹药筒推进器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-46583 C-1992 THRUSTER CARTRIDGE ACTUATED M3A3 METAL PARTS ASSEMBLY《M3A3金属零件集合发动弹药筒推进器》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、INCH-POUND MIL-T-46583C 21 September 1992 SUPERSEDING 11 August 1969 MIL-T46583B(MU) MILITARY SPECIFICATION THRUSTER, CARTRIDGE ACTUATED, M3A3 METAL PARTS ASSEMBLY is specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specificatio
2、n covers the requirements for the M3A3 Cartridge Actuated Thruster Metal Parts Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this document to the extent specified herein. Unless othe
3、rwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification For STANDARDS MI
4、LITARY MIL-STD-105 MIL-STD-109 MIL-STD-413 Sampling Procedures And Tables For Inspection By Attributes Quality Assurance Terms And Definitions Visual Inspection Guide for Elastomeric O-rings Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in imp
5、roving this document should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Standardization Branch (Code 3730), 101 Strauss Avenue, Indian Head, MD 20640-5035, by using the Standardization Document Improvement Proposal D Form 1426) appearing at the end of this docutne
6、nt or by sending a letter. AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-4b583C W 9999906 LLi90192 041 MIL-T-465 83 C (Unless otherwise indica
7、ted, copies of federal and military specifications and standards are available from Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 191 11-5094.) 2.1.2 Other Government documents, drawings, and publications. The following Government drawings form a part of this s
8、pecification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DRAWINGS NAVAL ORDNANCE STATION (CAGE Codes 19200 and 19203) 1052263 1 Thruster, Cartridge Actuated, M3A3 Metal Parts Assembly 87967 19 Box, Fiberboard (Inner), Packing,
9、 Ammunition, For Thruster, Cartridge Actuated, M3A3 8797270 Box, Packing, Ammunition, For Thruster, Cartridge Actuated, M3A3 92 17573 Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Thruster, Cartridge Actuated, M3A3 U.S. Air Force TPO 00-953-5567 Thruster, Cartridge Actuated, M3A3 (Ap
10、plication for copies should be addressed to: Commanding Officer, Naval Ordnance Station, Data Control Branch (Code 3720), Indian Head, MD 20640-5035,) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document take
11、s precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected to the first article inspection (see 4
12、.3 and 6.3). 3.2 Materials. All materials used in the manufacture of the thrusters shall conform to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufact
13、ure. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.2.1 Raw material, The contractor shall be responsible for selecting from the classification list contained in the raw material specification the su
14、rface and physical condition of the raw material intended for use in manufacture. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-4bS83C m 9999906 1490193 T88 m MIL-T-465 83 C 3.3 Hardness and other physical properties. Hardness and other phy
15、sical properties required by the drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts shall be achieved by quenching and tempering. 3.4 Hydrostatic pressure. The body and end cap shall withstand a hydrostatic pressure of 8, pounds per squar
16、e inch (psi) for 15 seconds, minimum, without leaking, deformation, or mechanical failure (see 6.4.1). 3.5 Structural strength. The assembled thruster shall withstand a static tensile force of 800 pounds, minimum, for 15 seconds, minimum, between mounting points without unlocking and without mechani
17、cal failure (see 6.4.1). 3.6 Shear pin strength. The shear pin, after application of protective finish, shall shear when a load of 41 f 5 pounds is applied at the steady rate of 0.125 inch per minute. 3.7 Metal parts assembly. Parts shall be combined to produce an assembly which conforms to the requ
18、irements of the metal parts assembly drawing. All threaded joints shall be assembled handtight. 3.8 Protective finish. Protective finish shall be in accordance with the applicable specifications and shall apply to all surfaces of the component regardless of contour configuration. 3.9 Residual magnet
19、ism. The metal parts assembly shall not deflect the indicator of the compass more than five degrees in either direction using procedures in 4.6.6. 3.10 Workmanship. Thrusters shall he free of cracks, splits, or other defects which might prevent - proper mating with connecting parts or proper functio
20、ning ofthe device. 3.10.1 Metal defects. All components shall be free from cracks, splits, cold shuts, inclusions, porosity, or any similar defect. 3.10.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling
21、 the item. 3.10.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other foreign matter. 4. QUALITY ASSURANCE PROVJSIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the pe
22、rformance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disappro
23、ved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements (see 6.2). 3 Provided by IHSNot for ResaleNo reproduction or netwo
24、rking permitted without license from IHS-,-,-MIL-T4583C 4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT46583C1992THRUSTERCARTRIDGEACTUATEDM3A3METALPARTSASSEMBLYM3A3 金属 零件 集合 动弹 药筒 推进器 PDF

链接地址:http://www.mydoc123.com/p-982709.html