NAVY MIL-T-46573 B-1968 THRUSTER CARTRIDGE ACTUATED M5A2 METAL PARTS ASSEMBLY《M5A2金属零件集合发动弹药筒推进器》.pdf
《NAVY MIL-T-46573 B-1968 THRUSTER CARTRIDGE ACTUATED M5A2 METAL PARTS ASSEMBLY《M5A2金属零件集合发动弹药筒推进器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-46573 B-1968 THRUSTER CARTRIDGE ACTUATED M5A2 METAL PARTS ASSEMBLY《M5A2金属零件集合发动弹药筒推进器》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-T-46573B 33 777970b 0333333 7 24 January 1968 SWEFSEDING MIL-T-46573 (Om) 27 June 1962 MumY SPECIFICATION METAL PARTS ASSEmLY THRUSTER, CARTIUDGE ACTLIATED, M542 1. SCOPE 1.1 This specification covers Thruster, Cartridge Actuated, M5A2, Metal Parts Assembly. with other propellant actuated device
2、s in aircrew emergency escape systems. The assembly will ultimately be loaded and usedain conjunction 2. APPLICABLE Do(2uMEnTs 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein:
3、SPECIFICAT IONS Military MIL-A-2550 - Ammunitions and Special Weapons, General Specification for Military MIL-STD-io5 MIL-STD-109 MIL-STD-413 MIL-STD- MIL-STD- - Ammunition Data Card - SaanplSig Procedures and Tables for Inspection - Quality Assurance Terms and Definitions - Visual Inspection Guide
4、for Rubber O-Rings - Surface Roughness Values Preferred for Army by Attributes Ordnance Materiel Munitions Command F8594747 - Thruster, Tartridge Actuated, M5A2, Metal Parts Assembly TNB DOCUMENT CONTAINS AL PAGES. A I k Provided by IHSNot for ResaleNo reproduction or networking permitted without li
5、cense from IHS-,-,-flIL-T-qh5738 13 m 979790b 0313132 9 MIL-T-46573B(MIJ) 2.1 DRAWTNGS (Contd) Munitions Command C8797741 - Container, Ammunition, Fiber, M347, for Thruster, Cartridge Actuated, M2OA1, xM25 or M5A2 Cartridge Actuated, M20A1, XM25 or M5A2 in Fiber Container, 347 Cartridge Actuated, M5
6、A2, Metal Parts Assembly Box, Packing, Ammunition, for Thruster, Inspection Equipment List for Thruster, (Copies of specifications , standards and drawings .required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the co
7、ntracting officer.) 3.1 General.- Materials, parts and assemblies shall comply with the re- quirements specified on the applicable drawings, referenced specifications and the following : 3.2 Material.- The contractor shall be responsible for selecting from the classification list contained 3n the ra
8、w material specification, the surface and physical condition of the raw material intended for use in manufacture. 3.3 Physical and mechanical properties.- Physical and mechanical properties required by the drawing shall be uniform thraughout the part within specified tolerances. quenching and temper
9、ing. Requirements for all alloy steel parts shall be achieved by 3.4 Hydrostatic pressure.- The body and head shall withstand a constant internal pressure of 8000 psi, minimum, for i5 seconds, minimum, without appli- cation of any external load and shall show no evidence of leakage or mechanical fai
10、lure (see 6.1) 3.5 Structural strength.- The assembled thruster shall withstand a static tensileforce of 2000 pounds, minimum, for 15 seconds, minimum, between mounting points without unlocking and without mechanical failure (see 6.1). 3.6 After application of protective finish, the shear pin shall
11、shear when a load of 48 - 4- 4 lbs. is applied at the steady rate of 0.125 inches per minute. 3.7 Metal parts assembly.- Parts shall be combined to produce an assemby which conforms. to the requirements of the Metal Parts Assembly Drawing F8594747. i 2 Provided by IHSNot for ResaleNo reproduction or
12、 networking permitted without license from IHS-,-,-HIL-T-qh573B 13 m 9999906 0333333 O I - MIL2T14-6573( MU) 3.7.1 The head and body shall be assembled handtight. 3.7.2 Trunnion rotation.- Upon completion of assembly, the trunnion shall be free to rotate 360 degrees. structural strength test, the en
13、d sleeve shall be free to rotate 360 degrees in a clockwise direction. 3.7.3 End sleeve rotation.- Upon completion of assembly and after 3.8 Protective finish.- Protective finish shall be in accordance with the applicable specifications and drawings and shall apply to all surfaces of the component r
14、egardless of contour configuration. 3.9 Residual magnetism.- The metal parts assembly shall not deflect the indicator of the compass more than three degrees in either direction when passed in front of the compass at a distance of 6 inches. 3.10 Workmanship.- The requirements for workmanship are as s
15、pecified in the applicable drawings, referenced specifications and the following: 3.10.1 Metal defects.- All components shall be free from cracks, splits, cold shuts, inclusions, porosity or any shilar defect. 3.10.2 Burr.- No part shall have a burr which might interfere with the assembly or functio
16、n of the item or which might be injurious to personnel handling the item. 3.10.3 Foreign matter,- No part or assembly shall contain chips, dirt, grease, rust, corrosion or other foreign matter. 4. QI%LITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.- Unless otherwise specified in the cont
17、ract or purchase order, the supplier 5s responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own or any commercial laboratory acceptable to the Government. The Government reserves the right to perform any of t
18、he inspections set forth in the specification where such inspection are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1 Quality assurance terms and definitions.- Reference is Ea65 to MIL-STD-109 to define quality assurance terms used. 3 .- i Provided by IHS
19、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-qb573B 13 9999906 0333334 2 _ - - MIL-T-46573B(MU) - 4.1.2 Inspection. - Inspection shall be in accordance with MIL-A-2550 4.2 First article sample. except as specified herein. 4.2.1 Initial production smp1e.- A
20、t the beginning of regular produc- tion, a sample shall be submitted in accordance with contract requirements and shall consist of 5 metal parts asseniblies, 10 sets of parts and fifty shear pins from the saane lot of shear pins tested by the contractor. The samples shall be subjected to tests in 4.
21、3.3. in accordance with 4.4. manner, using the saae materials, equipment, processes and procedures as used in regular production. All parts and materials, including packaging and gacking, must be the same as used in regular production and shallbe obtained from the same.source of supply. at source, t
22、he sample shall be inspected for all requirements of the drawings and specifications at a Government laboratory or such other facility specified in the contract. The test procedures shall be The samples shall be manufactured in the same 4.2.1.1 Examination and test. - After inspection and provisiona
23、l acceptance . 4.2.1.2 Initial production sample failure.- Failure of the sample to comply with requirements of the drawings and specifications shall result in sample disapproval. 4.3 inspection provisions. 4.3.1.1 Submission of product.- Unless otherwise specified by the con- tracting officer, form
24、ation of lots and presentation of lots shall be in accordance with the “Submission of Product“ provisions of MIL-STD-105. consist of 1200 thrusters, maximum, provided the homogeneity requirements of inspection lots have been retained. 4.3.1.2 Size of lot.- The shipping lot of metal parts assemblies
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT46573B1968THRUSTERCARTRIDGEACTUATEDM5A2METALPARTSASSEMBLYM5A2 金属 零件 集合 动弹 药筒 推进器 PDF

链接地址:http://www.mydoc123.com/p-982708.html