NAVY MIL-T-16286 E (1)-1980 TUBE STEEL SEAMLESS MARINE BOILER APPLICATION《无缝钢管船用锅炉申请书》.pdf
《NAVY MIL-T-16286 E (1)-1980 TUBE STEEL SEAMLESS MARINE BOILER APPLICATION《无缝钢管船用锅炉申请书》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-16286 E (1)-1980 TUBE STEEL SEAMLESS MARINE BOILER APPLICATION《无缝钢管船用锅炉申请书》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY SPEC IF ICATION TUBE, STEEL, SEAMLESS, MARINE BOILER APPLICATION MIL-T-16286E (SH+. AM ENDH ENT - 1 25 June 1980 I I This amendment forms a part of Military Specification MIL-T-162860 (SHI, dated 19 September 1977. PAGE 1 2.1 , under “SPECIFICATIONS,. MILITARY“ Add: “MIL-1-45208 - Inspectio
2、n System Requirements.“ PAGO 2 2-2: Delete “ASTH E6w and VASTM E18“ and substitute: “A370 - Mechanicaf Testing of Steel Products, “A450 - General Requirements for Carbon, Ferritic Alloy, and Austenitic Alloy Steel Tubes.+ 3.1: Delete last sentence. Table I: Column 3 entitled “Manganese“, last item:
3、Delete n193 max“ and substitute +0,93 ma%“. PAGE 3 Add new paragraph 3.1.1: li3. 1.1 Recovered materials. Unless otherwise specified herein , all material incorporated in the products covered by this specification shall be fabricated using materials produced from recovered materials to the maximum e
4、xtent practicable without jeopardizing the intended use. The term “recovered materials“ means materials which have been collected or recovered from solid waste and reprocessed to become a source of raw materials, as opposed to virgin raw materials.Il 3.4: Delete and substitute: n3.4 Surface finish.
5、“3.4.1 All classes of carbon and alloy steel tube shall be free from scale by pickling or shot blasting. When controlled atmosphere heat treat- ment is used, pickling or shot blasting is not necessary. “3.4.2 Austenitic steel tube shall be pickled free from scale. When bright annealing is used, pick
6、ling is not necessary.“ FSC 4710 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-Lb2bE (1) 47 W 9999906 OLI43859 5 W Rockwell Hardness Number (minIl/ No requirements B 70 B 65 B 68 B 68 MIL-T-16286E (SHI AM EN DM ENT - 1 Rockwell hardness Brine
7、ll Hardness Number (rnax) Number (max) B 77 137 B 90 192 B 80 146 B 85 163 B 79 143 3.5.1: Delete and substitute: “3.5.1 Hardness. Finished tubes shall have a hardness not exceeding the maximum values shown in table III. Class c, d, e, and g tube samples having hardness values below the minimum of t
8、able III shall also be tensile tested .n PAGE 4 TABLE III: Delete and substitute: L/ Minimum requirements for Rockwell hardness (or for equivalent Brinell values) are not the basis for acceptance or rejection. Table IV, line 4: Delete vertical lines immediately adjacent to both ends of the item enti
9、tled “Variation in wail thickness, percentn. Table IV, footnote l/: Delete last sentence. Table V: Delete first three items and substitute: Il Under 1 1 to 1-1/2 inclusive Over 1-1/2 to 2 exclusive PAGE 5 Add tlI/n at end of table V. For cold-drawn class c tubes under 2 inch outside diameter, the ma
10、ximum outside diameter variation may be plus or minus 0.010 inch, This increased variation is necessitated by ovality and is not to be added to the values in table V.“ Page 2 of 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-5 MIL-T-l6286E(SH) AME
11、NDM ENT-1 3.7.1: Delete and substitute: “3.7.1 Flaring. When subjected to the flaring test specified in 4.4.4, the test specimen after flaring shall show no tears or ruptures in the test area which exceed a depth of 10 percent of the actual wall thickness. Actual wall thickness shall be measured adj
12、acent to the crack.“ 3.7.2: Delete and substitute : Ii3. 7.2 Flattening. “3.7.2.1 Step one. When subjected to the flattening test specified in 4.4.5, the specimen after the first flattening step shall show no tears or ruptures on the inside, outside or end surfaces which exceed a crack depth of 10 p
13、ercent of the actual wall thickness. Actual wall thickness shall be measured adjacent to the crack. “3.7.2.2 Step two. When subjected to the flattening test specified in 4.4.5, the specimen after the second flattening step shall show no evi- dence of laminated or unsound material that is revealed du
14、ring the entire flattening test .“ 3.8.1: Delete the second sentence. 3.8.2: Delete first sentence and substitute: “Each length of tube with specified minimum wall thickness of 0.120 inch and below shall be subjected to either an eddy current or ultrasonic test as specified in 4.4.7.n 3.10.2: Last s
15、entence, after “for“, insert “Class c“. PAGE 6 3.11: Delete and substitute: “3.11 Workmanship, Finished tubes shall be of proper dimension with ends cut square, free from burrs, and shall not deviate from straight- ness by more than 0.060 inch in 3 feet of length. Tube surfaces shall conform to 3.4
16、and shall not contain defects such as laminations, laps, seams, tears, cracks, scratches, indentations, abrasions, or pits with depths greater than 10 percent of the specified minimum wall thickness, and which would reduce the wall thickness below the specified minimum wall thickness, Defects of les
17、ser depth may be removed by grinding, provided the wall thickness is not decreased to less than that permitted in table -IV, .a.nd the ground areas are well faired into the remaining portion of the tube. Workmanship quality shall be determined at the place of manu- facture prior to shipment.“ 4 1.1
18、: Delete and substitute : If4.1,1 Inspection system. The contractor shall provide and maintain an inspectisn system in accordance with MIL-1-45208, II Page 3 of 6 . . - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-Lb2bE (1) Lt7 W 77977Ob OLt
19、Lt3bL 3 W MIL-T-16286E (SHI AMENDMENT-1 Char ac ter i s t ic s 4.2.1: Delete and substitute: “4.2.1 Sample unit. The sample unit shall be a length of finished tube of the ordered wall thickness and outside diameter, prior to cutting it to the final ordered length, and after all required heat treatme
20、nt and straightening has been performed .It De f ec t s 4.2.4: Delete and substitute: “4.2.4 Sampling for product (check) analysis. One sample for chemical analysis shall be taken by the tube manufacturer from a billet or tube hollow from each heat of stee1.I 4.2.6, second sentence: Delete “shall“ a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT16286E11980TUBESTEELSEAMLESSMARINEBOILERAPPLICATION 无缝钢管 锅炉 申请书 PDF

链接地址:http://www.mydoc123.com/p-982504.html