NAVY MIL-STD-2203 A-1994 ENERGY MONITORING AND CONTROL SYSTEMS PERFORMANCE VERIFICATION AND ENDURANCE TESTS《性能检验和耐力测试能源监测和控制系统》.pdf
《NAVY MIL-STD-2203 A-1994 ENERGY MONITORING AND CONTROL SYSTEMS PERFORMANCE VERIFICATION AND ENDURANCE TESTS《性能检验和耐力测试能源监测和控制系统》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-STD-2203 A-1994 ENERGY MONITORING AND CONTROL SYSTEMS PERFORMANCE VERIFICATION AND ENDURANCE TESTS《性能检验和耐力测试能源监测和控制系统》.pdf(159页珍藏版)》请在麦多课文档分享上搜索。
1、. Q L MIL-STD-2203A - 9999911 0475950 041 MIL-STD-2203A 10 June 199Q SUPERSEDING 29 May 1987 MIL-STD-2203 MILITARY STANDARD ENERGY MONITORING AND CONTROL SYSTEMS, PERFORMANCE VERIFICATION AND ENDURANCE TESTS AhlSC N(iYY2 AREA ATTS DISTKIKUTION STATEhlENT A : APPROVED I;OR YUKLIC RELEASE; DISTRIRUTIO
2、N IS UNLIMITED. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-2203A 933 0475953 TBB MIL-STD-2203A FOREWORD 1. This military standard is approved for use by all Departments and Agencies of the Department of Defense. 2. Beneficial comments (r
3、ecommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer (Code 156), Naval Construction Battalion Center, 1000 23rd Avenue, Port Hueneme, CA 93043-4301, by using the Standardization Document Improvement Pro
4、posal (DD Form 1426) appearing at the end of this document or by letter. . ii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. CONTENTS Page Paragraph 1 . SCOPE 1 2 . APPLICABLE DOCUMENTS 2 3 . DEFINITIONS . 3 4 . GENERAL REQUIREMENTS 15 4.1 4.2 4.2
5、.1 4.3 4.3.1 4.4 4.4.1 4.5 General . 15 Test plans . 15 Data requirements for test plans 15 Test procedures . 15 Data requirements for test procedures 16 Testreports 16 Data requirements for test reports . 16 Test equipment and set up 16 5 . DETAILED REQUIREMENTS 17 5.1 General . 17 5.2 Performance
6、verification tests . 17 Test Number Title 1A 2A 3A Initial System Equipment Verification 18 System Startup . 19 System Accuracy and Resolution . 20 FID/MUX or RCU/ACU Hardware and Software: 4A 5A 6A 7A 8A 9A FID or RTU Memory and FID/MUX or RCU/ACU Spare 1/0 Capacity . 21 FID or RTU Startup and Func
7、tions 22 FID/MUX or RCU/ACU Battery Backup 25 FID/MUX or RCU/ACU Portable Tester . 26 FID or RTU Test Set . 28 FID or RTU RTC and RAM Battery Backup 24 Analog/Digital 1/0 Functions: 1 OA 11A 12A 13A Analog and Digital 1/0 Functions 29 Analog Input Function Noise Protection Analog Input Function Nois
8、e Protection Digital Input and Output Function Isolation and (Common Mode) . 31 (Normal Mode) . 32 Protection 33 iii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-2203A W 99995LL 0475953 850 D Contents . Continued . Page System Power Failur
9、e: 14A System Power Failure/Restart 34 CCU or COS Functions: 15A 16A 17A 18A CLT and DTM: CCU or COS Programmer Control Function . 36 CCU or COS Time Base Generator (TBG) 37 Retransmission . 38 CCU or COS/FID or RTU Error Detection and Backup Mode for CCU Failure . 39 19A CLT Device and DTM Failure
10、. 42 Storage Backup: 20A 2 1A Backup to Disk Storage System Failure 43 Magnetic Tape Validation 44 Software Validation and Development: 2 2A 2 3A 24A Command Software: 2 5A 2 6A 27A 2 8A 2 9A 3 OA 31A Software Validation . 45 Program Development . 46 Diagnostics . 47 System Access Control 48 Data En
11、vironment (DE) Definition Process 55 Report Generator 58 Operators Console Color Display 70 Control Sequences 75 Operator Commands 49 Alarm Reporting . 77 System Timing Tests: 3 2A Static Data Base Update . 81 iv Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
12、om IHS-,-,-MIL-STD-2203A 99999LL 0475954 797 a Contents . Continued . FID or RTU Software Tests: 3 3A FID or RTU Software Programming . 82 Applications Programs: 34A 3 5A 3 6A 3 7A 3 8A 3 9A 40A 4 1A 4 2A 4 3A 44A 45A 46A 4 7A 48A 49A 5 OA 5 1A 5 2A 5 3A 54A 5 5A 5 6A 5 7A 5 8A 5 9A 6 OA 6 1A 6 2A 6
13、 3A Command Priorities . 84 Calculated Point 87 Analog Monitoring 88 Analog Totalization . 89 Energy Totalization . 91 Prediction Software . 92 Extended Service Program 93 Scheduled Start/Stop Program . Summer Scheduled Start/Stop Program . Winter Optimum Start/Stop Program . Summer Operation 96 Opt
14、imum Start/Stop Program . Winter Operation 98 Duty Cycling Program . Summer Operation . 100 Duty Cycling Program . Winter Operation . 102 Demand Limiting Program . 104 Day-Night Setback Program 107 Operation . 94 Operation . 95 Economizer Program . 110 Enthalpy Program 111 Ventilation . Recirculatio
15、n Program . 112 Hot Deck-Cold Deck Temperature Reset Program 115 Reheat (RHT) Coil Reset Program . 117 Steam Boiler Selection Program . 119 Hot Water (HW) Boiler Selection Program . 121 Hot Water (HW) OA Reset Program . 123 Chilled Water (CHW) Temperature Reset Program 127 Condenser Water Temperatur
16、e Reset Program 128 Chiller Demand Limit Program 129 Remote Boiler Monitoring and Control Program 132 Chiller Selection Program 124 Lighting Control Program 131 *Custom Programs 133 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-2203A 999991
17、1 0475955 b23 Contents . Continued . Page FID or RTU Stand-Alone: 64A 65A 6 6A 6 7A 6 8A FID or RTU Stand-Alone Mode . 134 FID or RTU Stand-Alone Load Rolling Function 136 Telephone Modem . 137 Special Tests 138 Final System Equipment Verification . 139 Paragraph 5.3 Endurance Test. END.1A 140 Test
18、Number END . IA Paragraph Test Number END . 2A Paragraph Endurance Test . Phase I 142 Endurance Test . Phase II 143 Endurance Test . Phase III . 144 Endurance Test . Phase IV 145 5.4 Seasonal Endurance Test. END-2A . 146 Seasonal Endurance Test . Phase I 148 Seasonal Endurance Test . Phase II . 149
19、Seasonal Endurance Test . Phase III . 150 Seasonal Endurance Test . Phase IV . 151 6 . NOTES 152 6.1 Intended use 152 6.2 Issue of DODISS . 152 6.3 Data requirements 152 6.4 Subject term (key word) listing . 152 6.5 Changes from previous issue . 153 vi Provided by IHSNot for ResaleNo reproduction or
20、 networking permitted without license from IHS-,-,-MIL-STD-2203A MIL-STD-2203A 1. SCOPE 1.1 ScoDe. The purpose of this Military Standard is to define generic Performance Verification and Endurance Tests for Energy Monitoring and Control Systems (EMCS), Utility Monitor and Control Systems (UMCS) and
21、Utility Control Systems (UCS). performance requirements of guide specifications for EMCS are tested, and that the test results are adequately documented. The Government shall base certain contractual decisions on the results of these tests. The EMCS, UMCS or UCS systems will typically have different
22、 names for the various devices used. For example, computer based devices used in the field are referred to as FIDs, smart field panels, RTUs, RCUs, or other names. Regardless of what the devices are named, the appropriate tests should be performed. These tests are to be used to assure that the physi
23、cal and Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-2203A m 9999911 0475957 4Tb m MIL-STD-2203A 2. APPLICABLE DOCUMENTS 2.1 Government documents. This paragraph is not applicable. 2.2 Non-Government publications. The following document(s)
24、 form a part of this standard to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD adopted shall be those listed in the issue of the DODISS cited in the solicitation. Unless otherwise specified, the issues of the documents not listed in the DODISS are
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILSTD2203A1994ENERGYMONITORINGANDCONTROLSYSTEMSPERFORMANCEVERIFICATIONANDENDURANCETESTS 性能 检验 耐力

链接地址:http://www.mydoc123.com/p-982417.html