NAVY MIL-STD-2042-3 B-2002 FIBER OPTIC CABLE TOPOLOGY INSTALLATION STANDARD METHODS FOR NAVAL SHIPS (CABLE PENETRATIONS) (PART 3 OF 7 PARTS)《海军舰光缆拓扑装置标准方法(电缆侵入)》.pdf
《NAVY MIL-STD-2042-3 B-2002 FIBER OPTIC CABLE TOPOLOGY INSTALLATION STANDARD METHODS FOR NAVAL SHIPS (CABLE PENETRATIONS) (PART 3 OF 7 PARTS)《海军舰光缆拓扑装置标准方法(电缆侵入)》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-STD-2042-3 B-2002 FIBER OPTIC CABLE TOPOLOGY INSTALLATION STANDARD METHODS FOR NAVAL SHIPS (CABLE PENETRATIONS) (PART 3 OF 7 PARTS)《海军舰光缆拓扑装置标准方法(电缆侵入)》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、METRICMIL-STD-2042-3B(SH)25 July 2002SUPERSEDINGMIL-STD-2042-3A(SH)29 September 1997MIL-STD-2042-3(SH)7 July 1993DEPARTMENT OF DEFENSESTANDARD PRACTICEFIBER OPTIC CABLE TOPOLOGY INSTALLATIONSTANDARD METHODS FOR NAVAL SHIPS(CABLE PENETRATIONS)(PART 3 OF 7 PARTS)AMSC N/A AREA GDRQDISTRIBUTION STATEMEN
2、T A. Approved for public release; distribution is unlimitedProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-2042-3B(SH)iiFOREWORD1. This Department of Defense Standard Practice is approved for use by theNaval Sea Systems Command, Department of
3、 the Navy, and is available for use by allDepartments and Agencies of the Department of Defense.2. Beneficial comments (recommendations, additions, deletions) and anypertinent data which may be of use in improving this document should be addressedto: Department of the Navy, Naval Sea Systems Command
4、, ATTN: SEA 05Q, 1333 IsaacHull Avenue Southeast, Stop 5160, Washington Navy Yard, DC 20376-5160 by using theself-addressed Standardization Document Improvement Proposal (DD Form 1426)appearing at the end of this document or by letter.3. This standard practice provides detailed information and guida
5、nce topersonnel concerned with the installation of fiber optic cable topologies (opticalfiber cabling and associated components) on Naval surface ships and submarines. Themethods specified herein are not identifiable to any specific ship class or type,but are intended to standardize and minimize var
6、iations in installation methods toenhance the compatibility of the installations on all Naval ships.4. In order to provide flexibility in the use and update of the installationmethods, this standard practice is issued in eight parts; the basic standardpractice and seven numbered parts as follows:Par
7、t 1 CablesPart 2 EquipmentPart 3 Cable PenetrationsPart 4 CablewaysPart 5 Connectors and InterconnectionsPart 6 TestsPart 7 Pierside Connectivity Cable Assemblies and Interconnection HardwareProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-204
8、2-3B(SH)iiiCONTENTSPARAGRAPH PAGE1. SCOPE . 11.1 Scope . 11.1.1 Applicability . 12. APPLICABLE DOCUMENTS 22.1 General . 22.2 Government documents 22.2.1 Specifications, standards and handbooks . 22.2.2 Other Government documents 32.3 Non-Government publications . 32.4 Order of precedence . 43. DEFIN
9、ITIONS . 53.1 General fiber optics terms 53.2 Chafing collar 53.3 Collective protection system (CPS) 53.4 Kickpipe 53.5 Metal stuffing tube . 53.6 Multiple cable penetrator (MCP) . 53.7 Nipple 53.8 Optical fiber cable . 53.9 Swage tube 54. GENERAL REQUIREMENTS 64.1 Cable penetrations 64.1.1 Cable pe
10、netration of ship structure . 64.1.2 Plastic sealer 74.1.3 Kickpipes . 74.1.4 Multiple cable penetrators (MCPs) 74.1.5 Metal stuffing tubes 74.1.5.1 Stuffing tube packing . 74.1.6 Chafing collars and nipples . 74.1.7 Shielded compartment penetrations . 74.2 Safety precautions 85. DETAILED REQUIREMEN
11、TS 95.1 Penetration of ship structure (submarines) . 95.2 Penetration of ship structure (surface ships) using steel oraluminum stuffing tubes 95.3 Penetration of ship structure using multiple cable penetratorsMCPs) . 95.4 Penetration of ship structure using kickpipes. . 95.5 Retention of the waterti
12、ght seal . 96. NOTES . 106.1 Intended use 106.2 Issue of DODISS . 106.3 Standard method designation . 106.4 Subject term (key word) listing . 10METHOD3A1 Cable penetrations via metal stuffing tubes . 3A1-13B1 Cable penetrations via MCPs 3B1-1Provided by IHSNot for ResaleNo reproduction or networking
13、 permitted without license from IHS-,-,-MIL-STD-2042-3B(SH)ivCONTENTSTABLE PAGE3A1-I Steel stuffing tube sizes for optical fiber cable (Submarines). . 3A1-13A1-II Steel stuffing tube data (Submarines). 3A1-23A1-III Aluminum and steel stuffing tube sizes for optical fiber cable(Surface ships). 3A1-33
14、A1-IV Steel stuffing tube data for decks and bulkheads without pipeprotection. . 3A1-33A1-V Steel stuffing tube data for decks and bulkheads with pipeprotection. . 3A1-43A1-VI Swage type aluminum stuffing tube data for bulkheads. . 3A1-43A1-VII Swage type aluminum stuffing tube data for decks. . 3A1
15、-53A1-VIII Swage type steel stuffing tube data for bulkheads . 3A1-53A1-IX Swage type steel stuffing tube data for decks . 3A1-63A1-X Reduced diameter swage type aluminum stuffing tube data forbulkheads. 3A1-63A1-XI Reduced diameter swage type aluminum stuffing tube data fordecks. 3A1-73A1-XII Reduc
16、ed diameter swage type steel stuffing tube data forbulkheads. 3A1-73A1-XIII Reduced diameter swage type steel stuffing tube data for decks. . 3A1-83B1-I MCP data and insert block sizes for optical fiber cable. 3B1-1Provided by IHSNot for ResaleNo reproduction or networking permitted without license
17、from IHS-,-,-MIL-STD-2042-3B(SH)11.SCOPE1.1 Scope. This standard practice provides detailed methods of optical fibercable penetrations through ship structure and equipment via stuffing tubes, swagetubes, multiple cable penetrators, chafing collars and nipples.1.1.1 Applicability. These criteria appl
18、y to installations on specific shipswhen invoked by the governing ship specification or other contractual document.They are intended primarily for new construction; however, they are also applicablefor conversion or alteration of existing ships. The rapidly changing state of theart in fiber optic te
19、chnology makes it essential that some degree of flexibility beexercised in enforcing this document. When there is a conflict between thisdocument and the ship specification or contract, the ship specification or contractshall take precedence. Where ship design is such that the methods herein cannot
20、beimplemented, users shall submit new methods or modifications of existing methods forapproval prior to implementation to: Department of the Navy, Naval Surface WarfareCenter, Dahlgren Division, ATTN: Code B35, 17320 Dahlgren Road, Dahlgren, VA 22448-5100.Provided by IHSNot for ResaleNo reproduction
21、 or networking permitted without license from IHS-,-,-MIL-STD-2042-3B(SH)22. APPLICABLE DOCUMENTS2.1 General. The documents listed in this section are specified in sections3, 4 and 5 of this standard practice. This section does not include documents citedin other sections of this standard practice o
22、r recommended for additionalinformation or as examples. While every effort has been made to ensure thecompleteness of this list, document users are cautioned that they must meet allspecified requirements documents cited in sections 3, 4 and 5 of this standardpractice, whether or not they are listed.
23、2.2 Government documents.2.2.1 Specifications, standards and handbooks. The following specifications,standards, and handbooks form a part of this document to the extent specifiedherein. Unless otherwise specified, the issues of these documents are those listedin the issue of the Department of Defens
24、e Index of Specifications and Standards(DODISS) and supplement thereto, cited in the solicitation (see 6.2).SPECIFICATIONSFEDERALGGG-W-646 - Wrench, Open End, Ratchet (TAC Pattern), for TubeFittings, Electric Cable Terminals and Stuffing TubeGland Nuts.DEPARTMENT OF DEFENSEMIL-I-3064 - Insulation, E
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILSTD20423B2002FIBEROPTICCABLETOPOLOGYINSTALLATIONSTANDARDMETHODSFORNAVALSHIPSCABLEPENETRATIONSPART3OF7PARTS

链接地址:http://www.mydoc123.com/p-982373.html