NAVY MIL-R-22622 A-1980 RACK BOMB EJECTOR AIRCRAFT AERO 7A AND AERO 7B SERIES《7A及7B航空系列飞机的喷射器及炸弹的机架》.pdf
《NAVY MIL-R-22622 A-1980 RACK BOMB EJECTOR AIRCRAFT AERO 7A AND AERO 7B SERIES《7A及7B航空系列飞机的喷射器及炸弹的机架》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-22622 A-1980 RACK BOMB EJECTOR AIRCRAFT AERO 7A AND AERO 7B SERIES《7A及7B航空系列飞机的喷射器及炸弹的机架》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、- - MIL-R-22622A LO 7779706 0302627 3 = 1. 25 April 1980 Superseding MIL-R-22622(WEP) 1 December 1961 MILITARY SPECIFICATION RACK, BOMB EJECTOR, AIRCRAFT; AERO 7A AND AERO 7B SERIES This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is available for
2、use by all Departments and Agencies of the Department of Defense. SCOPE AND CLASSIFICATION 1.1 Scope. This specification establishes the requirements for the manufacture and inspection of two types of bomb racks capable of carrying and releasing stores having suspension lugs spaced 355.6 milli- mete
3、rs (14 inches) and .762 millimeters (30 inches) apart and weighing from 113 kilograms (250 pounds) t6 1,810-kilograms (4,000 pounds). The test limits in this specification define minimum acceptable capabilities. 1.2 Classification. Bomb ejector racks, hereinafter called bomb racks, covered by this s
4、pecification shall be of the following types : Type I AERO 7A Bomb Ejector Rack Type II AERO 7B Bomb Ejector Rack 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The Following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification
5、to the extent specified herein. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: ENGINEERING SPECIFICATIONS AND STANDARDS DEPARTMENT (CODE 93) NAVAL AIR ENGINEERING CENTER, LAKEBURST, N.J. 08733,
6、 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. FSC 1095 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-R-22b22A 10 = 7779706 0302628 5 I SPECIFICATIO
7、NS Military MIL-T-7743 Testing, Store Suspension and Release Equipment; General Specification for MIL-C-81842 Connector Assemblies for Bomb Rack Electric Fuzing Provisions MIL-I-85042 Hooks, Bomb Rack, General Specification for STANDARDS Mili ta ry MIL-STD-100 Engineering Drawing Practices MIL-STD-1
8、29 MIL-STD-130 Marking for Shipment and Storage Identification Marking of U. S. Military Property MIL-STD-143 Standards and Specifications, Order of Precedence for the Selection of MIL-CTD-704 Electric Power, Aircraft, Characteristics and Utilization of MIL-STD-794 Parts and Equipment, Procedures fo
9、r Packaging and Packing of MIL-STD-831 Test Reports, Preparation of MS3314 Lug, Suspension, 450 kg. (1,000 lb) class, Airborne Equipment DRAWINGS Naval Air Systems Command 1380540 Lug, Suspension, Mk 3 Mod O (Copies of specifications, standards, drawings, and publications required by suppliers in co
10、nnection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-22622A LO 7999706 0302627 7 m 1 2.2 Order of precedence of
11、 specifications and standards. Should a conflict exist between any requirement in this specification and any requirement in the applicable documents referenced herein, the requirements of this specification shall take precedence over the refer- enced (applicable) document. 3. REQUIREMENTS 3.1 First
12、article? The bomb racks furnished under this specification shall be a product which has been inspected and passed the first article inspection specified herein (see 4.3). 3.2 Selection of specifications and standards. Specifications and standards for necessary commodities and services not specified
13、herein shall be selected in accordance with MIL-STD-143. 3.3 Interchangeability. All parts having the same part number shall be directly and completely interchangeable with each other with respect to installation and performance. 3.4 Identification of parts. All parts shall be marked as specified on
14、 the drawings listed in the data list for the bomb rack being procured, or in accordance with MIL-STD-130, if not specified on the drawings. The item identification and part number requirements of MIL-STD-100 shall govern the part number and changes thereto. 3.5 Bomb rack. 3.51 Construction. The con
15、struction of the bomb rack shall be in accordance with the drawings listed in the data list for the bomb rack being procured and as specified herein (see 6.2.1s). 3.5.2 Performance. The bomb racks shall satisfy all perform- ance requirements when subjected to the following inspections in the order s
16、pecified in Tabes I and II. a, b. C. d. e, f. -. ._ Bomb Rack Inspection (see 4.6.1) Functional Test (See 4.6.2) Arming Mechanism (see 4.6.3) Electric Fuze Arming (see 4.6.4) Manual Function (see 4.6.5a) Electrical Characteristics (see 4.6.5b) 3 Provided by IHSNot for ResaleNo reproduction or networ
17、king permitted without license from IHS-,-,-MIL-R-ZZ622A 10 W 979990b 0302b30 3 I 4.6.5) g. h. i. j. k. 1. m. n. O. Lag Time or Time of Release Determination (see High-g Release (see 4.6.5d) Icing (see 4.6.5e) Sand (see 4.6.5f) Salt Spray (see 4.6.5g) Shock (see 4.6.5h) Vibration (see 4.6.5i) Life (
18、see 4.6.5j) Static (see 4.6.5k) 3.6 Bomb rack hooks. The construction and inspection of the bomb rack hooks shall be in accordance with MIL-B-85042. 3.7 Electric fuze arming unit. The construction and inspec- tion of the electric fuze arming unit shall be in accordance with MIL-C- 81842. 3.8 Workman
19、ship. The workmanship displayed in fabrication and assembly of the bomb racks shall be such as to assure, within design limitations, the ability of the bomb racks to meet their performance requirements under all applicable environmental conditions specified herein. Unauthorized repair, welding, heav
20、y burrs, or parts assemblied by introduction of high stresses not prescribed in the drawings, are typical signs of inferior workmanship and shall be cause for rejection. The standards of workmanship exhibited in the approved first article sample, subject to any qualification stated in the government
21、s notice of approval, shall be determinative of the requirements of the contract relative to workmanchip. (See 4.6.1). 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise speci- fied in the contract, the contractor is responsible for the performance of all inspection
22、requirements as specified herein. Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the government. The government reserves the right to perform any
23、 of the inspections set forth in the specification, where such inspections are deemed necessang to assure that the supplies and services conf om to prescribed requirements. . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.2 Classification of inspe
24、ction. The inspection of the bomb racks shall be classified as follows: a. First article inspection (see 4.3) b. Quality conformance inspection (see 4.4) 4.3 First article inspection. First article inspection shall consist of all of the inspections listed in Table I. First article inspection report
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR22622A1980RACKBOMBEJECTORAIRCRAFTAERO7AANDAERO7BSERIES7A 航空 系列 飞机 喷射器 炸弹 机架 PDF

链接地址:http://www.mydoc123.com/p-981138.html