NAVY MIL-R-19046 D-1970 RELAY PANEL FIRING (FOR TORPEDO MARK 37 MODS 0 2 AND 3)《MARK 37 MODS 0 2 和 3鱼雷发射继电器盘》.pdf
《NAVY MIL-R-19046 D-1970 RELAY PANEL FIRING (FOR TORPEDO MARK 37 MODS 0 2 AND 3)《MARK 37 MODS 0 2 和 3鱼雷发射继电器盘》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-19046 D-1970 RELAY PANEL FIRING (FOR TORPEDO MARK 37 MODS 0 2 AND 3)《MARK 37 MODS 0 2 和 3鱼雷发射继电器盘》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、J. .- I . .2* *I MILITARY SPECIFICATION RELAY P-L, FIXING (For Torpedo Mk 37 Mods O, 2, and 3) MIL-R-oD( os) . This specification has been approved by the Naval Ordnance Systems Co-d, Department of the Navy. _- 1. SCOPE 1.1 Scope. .TI Wood, Nailed and Lock Corner -. Militmy BSIL-P- Preservation, Met
2、hods of MIL-E-82590 Ersd,ronmental Requirements and Tests -I (For Torpedo Mk 37 Components and Assemblies) S!S Military - m-sr-129 Marking for Shipment and Storage -. THIS DOGUFAENT. A PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-R-170
3、4bD 13 m . . 1 _I -. i *. t VI _ - MIL-R-l9046D( OS) MIL-SFD-147 Panetized and Containerized Unit Loads, 40“ x 48“ Pallets, Skids, Runners, or Pallet-me Base rnrnGS Naval Ordnance Systems Command 629583 Firing Relay Panel Assenibled, and All Parks and Subassemblies Listed Thereon -. Drawing 2445177
4、Schemahie Diagram -. PUBLICIONS ._ . Naval Ordnance Cineral, . - Mi sc.ellaneous (Copies of specifications, standmds, drawings, and publications re- . quested by contractors in connection with specific procurement functions. should be obCained from the procuring activityor as directed by the c tract
5、ing officer . ) specification to the extent specified herein. the issue in effect on date of invitation for bids or request for proposals. . shall apply. . - -_ 2.2 Other publications. The following documents form a part of this Uiiiess otherwise indicated, NATIONAL BUREAU OF mS FQBLICATIONS Handboo
6、k 128 Screw-Thread Standards for Federal Services I (Application for copies should be addressed to the Superintendent of kcments, Government Prfiting Off ice, Washington, De C o 20402 . ) 3. REQlKEDENTS 3.1 Description. The firing relay panel consists of a double-pole, double-tkow relay ana a double
7、-pole, single-throw control circuit relay. The firing relay opefates from 115 volts ac, 60 Hz input and the control circuit switching relay operates from 26 volts dc, relays necesswy for a torpedo run. These are the switching . The firing relay is closed by the pulse 2 c Provided by IHSNot for Resal
8、eNo reproduction or networking permitted without license from IHS-,-,-3 2 General requirements 3.2.1 Data recuired. No data is required by this specification (other than reports accompanying samples submitted for preproduction and periodic production testing), or by applicable documents referenced i
9、n Section 2, unless specified in the .contract or order (see 6.2). 3.2.2 Preproduction sample. Unless othehse specified in the contract or order, preproduction samples of the firing relay panel shaU be mu-. fached using the methods and procedures proposed for the production lot. These units shall be
10、 tested as specifie in Section 4 herein ad a.D 629583 . 3.2.5 Moisture, fun. The firing relay no panel shall s ow no danage and%Wlbe mounted rigidly, secured with the mounting base horizontal to a vibration device, using the four mounting holes in the base and tested as specified in 4.4.1.2 and 4.4.
11、1.3. 4.4.1.2 Vibration, nonoperating. The firing relay panel shall be subjected to the “Vibration, nonoperating“ test of MIL-E-82590 and thereafter shall meet the requirements of 3.4.1.1. 4.4.1.3 Vibration, operating. The firing relay panel shall be sub- jected to the “Vibration, operating“ test of
12、m-82590 and during and thereafter shall meet the requirements of 3.4.1.2. k.4.1.4 Vibration, transportation. The firing relay panel shall be subjected to the “Vibration, transportation“ test of 1-82590 and thereafter shall meet the requirements of 3.4.1.3. 4.4.2 Shock, transportation. The firing rel
13、ay panel shall be sub- jected to the “Shock, transportation“ test of mL-E-82590 and there- after shall meet the- requirements of 3.4.2. 4.4.3 Temperature and humidity 4.4.3.1 High temperature and humidity, nonoperating. The firing relay panel shall be subjected to the “High temperature and humidity,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR19046D1970RELAYPANELFIRINGFORTORPEDOMARK37MODS02AND3MARK37MODS02 鱼雷 发射 继电器 PDF

链接地址:http://www.mydoc123.com/p-981112.html