NAVY MIL-P-82530-1968 PRIMER ELECTRIC MK 137 MOD 0《MK 137 MOD 0电雷管起爆药包》.pdf
《NAVY MIL-P-82530-1968 PRIMER ELECTRIC MK 137 MOD 0《MK 137 MOD 0电雷管起爆药包》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-P-82530-1968 PRIMER ELECTRIC MK 137 MOD 0《MK 137 MOD 0电雷管起爆药包》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、 537-q _- MIL-P- I 24 VDC Figure 2. Direct Current Firing Test Setup A PRIMER B Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-450 mf C IIARGE SWITCH -t i 100 sl f 7LG - FIRING SWITCH CLOSE CHARGE SWITCH FOR 15 SEC THEN OPEN I Y PRIMER STOP SWITCH (
2、SEE FIGURE 1) START CIRCUIT STOP CIRCUIT / i, 24vD I ELECTRONIC COUNTER t.ilil II _I Figure 3. Cbpacitor Discharge Firing Test Setup 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I_ MIL-P-82530.13 = 9999906 03b175b L I MIL-P-82530 (OS) ROLLED Fig
3、ure 4. Correct Arrangement for Measuring Depth of Indentation After Zero Setting 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.4.3 Test conditions. Unless otherwise specified, the primer shall be subjected to the preproduction and peripdic pro
4、duction tests and quality confor- mance inspection tests under the following conditions: a. Temperature Room ambient (65 to 95 degrees F) b. Altitude Normal ground atmospheric pressure c. Humidity (Relative) Room ambient up to 95 percent 4.5 Preproduction and periodic production inspections. The pre
5、production and periodic production samples shall be subjected to the tests specified in para- graph 4.5.1 after satisfactorily passing the quality conformance inspections as indicated in Table I. 4.5.1 Test procedure. Subject the primer to the test sequence listed in Table I. Unless otherwise specif
6、ied in the individual test paragraph, the quality conformance inspection, as specified in Table I, shall be performed subsequent to environmental tests under test conditions specified in 4.4.3. FaiIure of the primer to pass any one of these tests shall constitute a defective unit. 4.5.1.1 Vibration.
7、 The primer shall be mounted to a suitable holding fixture with the leads taped to the fixture, and subjected to vibration tests in accordance with MIL-STD-331, Test 104, Procedure II. After vibration, the primer shall pass only the continuity and resistance test 4.6.1.1 and capacitor discharge func
8、tioning test 4.6.1.4.2. 4.5.1.2 Temperature and humidity. The primer shall be subjected to temperature and humidity testing as specified in MIL-STD-331, Test 105, for one (1) JAN cycle (two weeks), or the primer may be subjected to a total of 21 complete teiiiperature and pressure cycles as describe
9、d irr 4.5.1.2.1, After cycling, the primer shall pass only the capacitor discharge functioning test 4.6.1.4.2. 4.5.1.2.1 Temperature and humidity alternate test procedure. This is an alternate procedure, which may be performed in place of MIL-STD-331, Test 106, specified in 4.5.1.2. The primer shall
10、 be submerged in water in a suitable test chamber. The primer shall then be subjected to 15-minute overall elapsed time intervals of successive submersion and vacuum: (1) in water at a temperature of 160 degrees F plus or minus 10 degrees F and at an absolute pressure of 58 inches of mercury; (2) a
11、partial vacuum equivalent to a maximum of Ci inches of mercury absolute; (3) a tap water submergence at an absolute pressure of 58 inches of mercury; and (4) a repeat of the vacuum cycle. The aforementioned steps, (1) through (4), constitute one complete cycle. A minimum temperature differential of
12、90 degrees F shall be maintained between the 160 degrees F hot-water cycle and the tap-water cycle. Suitable instrumentation shall be furnished to indicate that the conditions of the test are being met, and Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS
13、-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-2530 13 M 7977706 0361759 7 _ - _ MIL-P-$2539 (OS) 4.6.1 Test procedure. The primer shall be subjected to the tests and examinations as outlined herein, Unless otherwise specified, inability
14、of the primer to pass the tests and examinations shall constitute a failure. 4.6.1-1 Continuity and resistance. Using the ohmmeter specified in 4.4. la, measure the resistance of the primer. The resistance shall be not less than O, 14 ohm nor more than O. 20 ohm. 4.6.1.2 Electrical nonfiring sensiti
15、vity. Using the equipment specified in 4.4, IC, subject the primer to a DC current of 1.00 plus or minus O. 10 ampere for a minimum of 10 seconds. The primer shall not function. 4.6.1.3 Insulation resistance, Using the megohmmeter specified in 4.4. lb, subject the primer to an alternating potential
16、of 1000 volts, applied between the primer case and the shorted lead wires for a minimum of one second. The resistance shall not be less than 50 megohms. 4.6.1.4 Functioninp; tests. 4.6.1.4.1 Direct current functioning. The direct current time test shall be conducted utilizing the equipment specified
17、 in 4.4. IC. The primer shall be subjected to a DC firing current adjusted to 5.00 plus or minus O. 15 amperes. The primer shall function within an upper specification limit of 5. O milliseconds. The occurrence of one or more duds shall be cause for rejection of the lot. 4.6.1.4.2 Capacitor discharg
18、e functioning. The capacitor discharge test shall be conducted utilizing the equipment specified in 4.4. Id. The primer shall be subjected to the discharge of a 450 microfarad (maximum) capacitor charged to 24 plus 4 minus O volts. The primer shall function within an upper specifica- tion limit of 4
19、00 microseconds. The occurrence of one or more duds shall be cause for rejection of the lot. 4.6.1.4,3 Output. The primer shall be placed in a suitable test fixture indicated in Figure 1 or equivalent, and subjected to the discharge of a 450 microfarad (maximum) capacitor having a charge of 24 plus
20、4 mhus O volts, This test may be conducted at the same time as the capacitor discharge function- ing test 4.6.1.4.2. The primer shall be inserted in brass holders such that the forward face of the case rests tightly against the insulation tape, over the aluminum block. After firing, the primer outpu
21、t shall be evaluated by measuring the depth of indentation caused in the aluminum block, A dial indicator reading in thousandths of an inch shall be mounted over a horizontal surface plate in such a manner that the indicator stem is perpendicular to the surface plate. The aluminum disc shall be plac
22、ed, indented side up, in a ring-type holder, so arranged that the periphery of the bottom face of the disc is approximately parallel to the surface plate, The indicator tip shall be lowered to the bottom of the disc indentation, and the indicator dial set to zero. Four readings, measured in thousand
23、ths of an inch, shall be determined near the periphery of Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-82530 13 9779706 0361760 3 W the indentation at approximately equidistant points. The arithmetical average of the four measurements shall
24、be considered as the average depth of indentation for that particular disc. The depth of indentation shall be within the lower speci- fication limit of O, O10 inch and the upper specification limit of O. 050 inch. 4.6.2 Visual examination. Visual examination shall be made on each primer submitted fo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILP825301968PRIMERELECTRICMK137MOD0MK137MOD0 雷管 起爆 药包 PDF

链接地址:http://www.mydoc123.com/p-980807.html