NAVY MIL-P-82442 (6)-1989 PUMP SEA WATER《海水泵》.pdf
《NAVY MIL-P-82442 (6)-1989 PUMP SEA WATER《海水泵》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-P-82442 (6)-1989 PUMP SEA WATER《海水泵》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、. -* MIL-P-82442 (6) 13 W 7977706 0360887 O W MIL-P-82442( OS) AMENDMENT 6 19 April 1989 AMENDMENT 5 30 March 1979 SUPERSEDING MILITARY SPECIFICATION PUMP, SEA WATER This amendment forms a part of Military Speci fi cati on MIL-P-82442( OS) dated 10 May 1966. Wherever it appears in specification dele
2、te Bureau of Naval Weaponsn and substitute “Naval Sea Systems Command“; also, delete BuWepsn and substitute NAVSEA“ . PAGE 1 Paragraph 2.1, under SPECIFICATIONS: Delete *MIL-C-4343n and its title. * Paragraph 2.1, under STANDARDS: Delete “S-29561, Packing, Preformed, O, Ring, Synthetic Lubricant Res
3、istant. . Paragraph 2.1, under DRAWINGS: Delete “Pump Assemnly, Sea Watern and sub- stitute Pump Assembly, Sea Watern; delete Pakcing, Preformed“ and sub- stitute “Packing, Preformed“. At the bottom of page, add the following: Beneficial comments (recommendations, additions, deletions) and any perti
4、nent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Ordnance Station, Standardization/Documentation Division (Code 3730), Indian Head, MD 20640-5000n. PAGE 3 Paragraph 3.3.1. Delete and substitute: “.3.1 Pressure and flow requirements. The pump
5、shall deliver 8.3 gallons per minute (gpm) minimum during the initial test of 1-112 minutes duration, when operating at 3880 +10 revolutions per minute (rpm) and having an inlet pressure of 15 +2 pouns per square inch gage (psig) and outlet pressure adjusted to 265 ClO psig. The flow rate of the pum
6、p, when operated under the same conditions as above, must be at least 7.5 gpm during the first six duty cycles of the operational service life of the pump, and at least 6.8 gpm during the remaining four duty cyclesn, AMSC NIA Page 1 of 5 FSC 1355 DISTRIBUTION STATEMENT A. 1 imi ted. Approved for pub
7、lic release; distribution is un- J_ - L_-C - - - - 7 _1 - -_ - - - _ Licensed by Information Handling Servicesa. MIL-P-82442 (6) 13 777770b 03bO 2 MIL-P-82442(OS) AMENDMENT 6 PAGE 5 Paragraph 4.1. Delete and substitute: H44.1 Responsibflity for inspection. Unless otherwise specified in the contract,
8、 the contractor is responsible for the performance of all inspec- tion requirements as specified herein. Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disappro
9、ved by the Government. The Government reserves the right to perform any of the inspection set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements“ PAGE 9 Paragraph 4.4.4.1. Delete and substitute: “4.4.4.1 Operation
10、al test. Install the pump in the pump test stand and connect it to the appropriate fittings in accordance with Figures 1 and 2. With the drive unit operating the pump at 3880 +10 rpm and with an inlet pressure of 15 +2 psig, the output pressure sharl be adjusted to 265 510 psig. The flow-rate shall
11、be at least 7.5 gpm during the first six duty cycles of the operational service life, and at least 6.8 gpm during the remaining four duty cycles. The pump shall operate for one complete duty cycle of 7 minutes on salt water. Post-test servicing and maintenance shall be performed in accordance with 4
12、.5.7n. PAGE 10 Paragraph 4.4.4.4, lines 4 and 5: Delete *in accordance with Table VII in the sequence shownw and substitute accordance with Table VIII. Test sequence is optional.“ Table VIII: Delete “Test Sequencen column entirely. PAGE 13 Paragraph 4.5.3, line 4: Delete wcharacteristics indicated:“
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILP8244261989PUMPSEAWATER 海水 PDF
