NAVY MIL-L-21910-1959 LAUNCHER ROCKET LAU-10 A《LAU-10 A型火箭发射器》.pdf
《NAVY MIL-L-21910-1959 LAUNCHER ROCKET LAU-10 A《LAU-10 A型火箭发射器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-L-21910-1959 LAUNCHER ROCKET LAU-10 A《LAU-10 A型火箭发射器》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIIL-L- 2191O(Aer) 3. I. 2 Manufacturing Processes and Finish - Unless otherwise approved irr wxing by t
2、he procuring service, the manufacturing processes and finishes shall be as ripecificd herein or on the applicable draw OF drawings. 3.2 Design and Construction: 3.2.1 Conformance to Drawings and Specifications - The launcher shall be constructed in accordance with the applicable drawings and specifi
3、cations listed in Drawing 55A.2751. No departure from, revision or change tothe drawings or specifications listed therein shall be made without prior written approval by the procuring service. 3. 2. 2 Interchangeability - All parts having the same part number shall be directly and completely interch
4、angeable with each other in respect to fit, function and performance. All applicable provisions of Military Specification MIL-1-8500 shall apply. 3. 2.3 Nomenclature and Nameplates - Nomenclature and nameplates shail be in accordance with Specification MIL-N- 18307. 3. 2.4 Weight - The weight of the
5、 launcher in Configuration B including ail attachments and less rockets shmexceed 106 pounds. 3. 2. 5 Electrical Connectors - All electrical connectors shaii conform to Specification MIL-C- 501 5. 3.3 Performance - In addition to the above requirements, the equipment shal meet Workmanship - All deta
6、ils of workmanship shau. be in accordance with high ail requirements imposed by the tests of Section 4. 3.4 quality armament manufacturing practice. Ali parts SU be free from excessive marks, grooves, indentations, cracks, flaws and any other defects which may impair the serviceabiiity, function or
7、performance of the assembled unit. All workmanship shall be of a quality satisfactory to the procuring service or direct representative thereof. 4. QUALITY ASSURANCE PROVIISIQNS 4.1 General - Equipments shall be subjected to the following tests to determine compliance with all the applicable require
8、ments. (1) Preproduction Tests (2) Acceptance Tests 4.2 Preproduction Tests - Preproduction tests duil be condud on ten equipments representative of the equipments to be supplied der the coatract. Preproduction tests shall be conducted at a laboratory designated by the Bureau of Aeronautics. Preprod
9、uction tests shall consist of all tests specified in 4.4 and any other tests deemed necessary by the Bureau of Aeronautics to determine conformance with this specification. 4.3 responsible for accomplishing individual acceptance tests. The launchers shall be submitted for acceptance by lots. Equipme
10、nts comprising e.ach lot shall first have passed the individual tests. Acceptance of each lot will be determined by the launchers successhiy passing the sampling tests. as sZpcified in 4.3.2. All inspection an13 testing at the contractors plant shall be under the supervision of the Government Inspec
11、tor. Acceptance or approval of material during the course of manufacture shall in no case be construed as a guaranty of the acceptance of the finished product. Acceptance tests shall consist of the foliowing: Acceptance Tests - The contractor shall furnish ail samples and shall be (i) Individual Tes
12、ts (2) Sampling Tests 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ HIL-L-2lqlO 10 qqqqqob 03037q0 q 9 -_ MlL-L-1191(Aer) individual Tests - individual tests shall be conductal at the COntraCfOrs piant (1) Examiatim of Product (See 4.4.1 ) (2)
13、Operatianal Tests (See 4.4.2) sampling Tests - Sampling tests shall be conducted at a laboratory designated on each equipment witwiitted for acceptance under the contract. and shall conrirt of the following: by the Bureau of Aeronautics on a quantity of equipments specified in 4.3.2.1. Equipmenta. s
14、ubmitted for sampling tests shall be selected by the Government inspector and first shall have passed the individual tests. Sampling tests shall include ali the tests specified in 4.4 and any other tests deemed necessary by the Bureau of Aeronautics to determine that production equipment continues t
15、o be equivalent in performance and construction to the approved preproduction model. Sampling Test Schedule - Sampling for acceptance testing shall be in accordance Lot Sizes - The maximum quantity of launchers required to be deivered monthly 4.3.2.1 with the appendix to MIL-STD-105, inspection leve
16、l L, AQL as specified in 4.5. 4.3.2.2 as specified in the contract. Examination of Product - Each equipment shall be subjected to a complete (1) Dimensions (2) Surface finishes of all parts (3) Assembly Check (4) Workmanship Material and Process Check - In addition to the requirements of 4.4.1 , exa
17、mination for the following to determine conformance with this specificatioa. 4.4.1. 1 the preproduction samples and acceptance lot sampxes shall be subjected to a complete material and process check to insure use of required and certified materiais and compliance with required and approved manufactu
18、ring processes. Also. the samples shall be weighed to determine compliance Operational Tests - ignition System - Continuity of the electrical circuits comprising the ignition system shall be checked. The grounding circuit conhuity and resistance shall also be checked. The resistance measured between
19、 any Detent Pawl (drawing 55A27B9) and the suspension lug threaded inserts (drawing 55AZIC58) shall not exceed O. 1 ohm. 4.4; 2.1 4.4-2.2 ntervalometer - The intervalometer of each launcher shall be checked in the Ripple and the Single firing positions to determine proper functioning in accordance w
20、ith the operational requirements aa specified on drawing 55A27Jl. Tetents - Ranom puU tests shall be conducted on individual detents. At least one detent ahail e puu-teStea 011 each launcher. The detent shall release with a puli of 1,600 to 2,4M) pounds total load, but shall not release with a pui o
21、f less than 1,600 pounds total load or fail to release with a*pull of as900 pounds total Load 4.4.2.3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-21710 10 7777706 0301771 O W -u MIL-L21910(Aer) 4.4.3 Waterproofness Test - The launcher in co
22、nfiguration IrAtr shall be tested in accordance with the waterproofness test of Specification MIL-P-116. 4.4.4 Moisture Penetration Resistance Test - Approximately one pound of completely re- activated desiccant in a bag shall be placed in the launcher. The launcher shall be conditioned for 24 hours
23、 at 100“ F f 2“ F and 95% relative humidity. After conditioning, the bag of desiccant shall be replaced with a fresh weighed bag of completely reactivated desiccant (approximately 1 pound). The launcher shall then be exposed for a period of 64 to 68 hours, to the conditions set forth above, after wh
24、ich it shall be reopened and the bag of desiccant reweighed. The weight increase shall not exceed .O7 grams per 100 square inches of external launcher surface area (A) per 24 hours and shall be calculated as shown below: (W2-W1) 2400 TXA Transmission Rate - W1 - Weight (in grams) at the beginning of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILL219101959LAUNCHERROCKETLAU10ALAU10A 火箭 发射器 PDF

链接地址:http://www.mydoc123.com/p-980146.html